{"id":31683,"date":"2025-08-05T08:05:07","date_gmt":"2025-08-05T15:05:07","guid":{"rendered":"https:\/\/essential.construction\/news\/unique-and-challenging-the-helsinki-central-library-project\/"},"modified":"2025-08-05T08:05:07","modified_gmt":"2025-08-05T15:05:07","slug":"unique-and-challenging-the-helsinki-central-library-project","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/unique-and-challenging-the-helsinki-central-library-project\/","title":{"rendered":"Unique and Challenging\u2014The Helsinki Central Library Project"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<p>A construction site always looks more like a field experiment than an industrial process. In all fairness, the site of <strong>Helsinki\u2019s Central Library<\/strong> site looks well organized and clean. The impressive steel structures suggest that the building will be something special.<span id=\"more-6677\"\/><\/p>\n<p>I\u2019ve heard the words <em>unique<\/em> and <em>challenging<\/em> many times in reference to the new central library. The project epitomizes the old construction-industry saying that \u201cwe\u2019re always building a prototype.\u201d Some see that as a curse, some think it\u2019s what makes the industry interesting.<\/p>\n<h2>A winning design<\/h2>\n<p>Although the idea of a new city library dates back to 1998, the city of Helsinki didn\u2019t organize an architectural competition for the new building until 2013. The opening of the library was originally set to coincide with the centennial of Finland\u2019s independence in 2017, but the library\u2019s projected opening is now slated for December 2018. The Finnish government is providing \u20ac30 million of the \u20ac96 million budget.<\/p>\n<p>The competition\u2019s winner, designed by <strong>ALA Architects<\/strong>, was an excellent choice. It is an 18,000-square-meter library of the future where people, not books, dominate. The design features a large curvilinear fa\u00e7ade made of wood and large undulating wooden ceilings, with an inviting and exciting exterior and interiors. The use of wood to this extent is exceptional for a public building in Helsinki.<br \/><iframe loading=\"lazy\" data-placeholder-image=\"https:\/\/aec-business.com\/wp-content\/plugins\/complianz-gdpr\/assets\/images\/placeholders\/default-minimal.jpg\" data-category=\"statistics\" data-service=\"vimeo\" data-cmplz-target=\"src\" data-src-cmplz=\"https:\/\/player.vimeo.com\/video\/105150619\" class=\"cmplz-placeholder-element cmplz-video cmplz-iframe-styles cmplz-iframe lazyload\" data-=\"\" src=\"https:\/\/aec-business.com\/unique-challenging-helsinki-central-library-project\/about:blank\" width=\"640\" height=\"360\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/vimeo.com\/105150619\" target=\"_blank\">Helsinki Central Library<\/a> from <a rel=\"nofollow noopener\" href=\"https:\/\/vimeo.com\/user5972747\" target=\"_blank\">ALA Architects<\/a> on <a rel=\"nofollow noopener\" href=\"https:\/\/vimeo.com\" target=\"_blank\">Vimeo<\/a>.<\/p>\n<h2>Bold use of wood and steel<\/h2>\n<p>I\u2019ve often heard that \u201carchitects build monuments for themselves.\u201d On the contrary, I think that architecture is a manifestation of the client\u2019s values. In the case of the central library, the city is seeking to create a lasting landmark and a shared living room for the townspeople.<\/p>\n<p>Despite some <a rel=\"nofollow noopener\" href=\"http:\/\/www.constructionmanagermagazine.com\/international\/new-timber-library-confronts-finlands-fear-fire\/\" target=\"_blank\">skeptical comments<\/a>, the design went on. \u201cI\u2019m sure that the building industry will try to turn it into a concrete building,\u201d Professor <strong>Pekka Heikkinen<\/strong> of Aalto University told a leading Finnish newspaper after the winner was announced. Although wooden surfaces dominate, the building houses several structural systems: concrete shafts and slabs, prestressed concrete, and 2,500 tons of steel structures.<\/p>\n<p>As a specialty, 2.5-meter-high steel box beam arches span over 100 meters long through the building. They act like the arches of a bridge, but instead of supporting one slab, they support three floor levels. The original design contained main structures with steel trusses, but these would have bent too much to be useful.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"img-responsive wp-image-6681 size-full lazyload\" src=\"https:\/\/aec-business.com\/wp-content\/uploads\/2017\/04\/Helsinki-Central-Library-site.jpg\" alt=\"Helsinki Central Library construction\" width=\"1200\" height=\"615\"\/><img loading=\"lazy\" decoding=\"async\" class=\"img-responsive wp-image-6681 size-full lazyload\" src=\"https:\/\/aec-business.com\/wp-content\/uploads\/2017\/04\/Helsinki-Central-Library-site.jpg\" alt=\"Helsinki Central Library construction\" width=\"1200\" height=\"615\" srcset=\"https:\/\/aec-business.com\/wp-content\/uploads\/2017\/04\/Helsinki-Central-Library-site.jpg 1200w, https:\/\/aec-business.com\/wp-content\/uploads\/2017\/04\/Helsinki-Central-Library-site-640x328.jpg 640w, https:\/\/aec-business.com\/wp-content\/uploads\/2017\/04\/Helsinki-Central-Library-site-768x394.jpg 768w, https:\/\/aec-business.com\/wp-content\/uploads\/2017\/04\/Helsinki-Central-Library-site-1170x600.jpg 1170w, https:\/\/aec-business.com\/wp-content\/uploads\/2017\/04\/Helsinki-Central-Library-site-610x313.jpg 610w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\"\/><\/p>\n<p><em>The construction site on April 22, 2017 \u2013 Aarni Heiskanen<\/em><\/p>\n<h2>Challenging HVAC design<\/h2>\n<p>In a video interview for Rakennuslehti magazine, <strong>Hannu Martikainen<\/strong>, the leading HVAC designer for <strong>Ramboll Finland<\/strong>, talked about the project\u2019s difficulties. \u201cIt is an extremely challenging, exceptionally unique, one-time project,\u201d he said. \u201cThe architecture is extraordinary and the structural designs are idiosyncratic, so HVAC has to adapt to these solutions. We could not use traditional dimensioning models.\u201d<\/p>\n<p>The HVAC systems themselves are quite standard, something in which the city of Helsinki was not seeking innovation. Still, Martikainen mentioned several alternative heating and cooling systems. The town plan also had a special requirement for the building: It prohibited the placement of ventilation plant rooms on the roof, so the HVAC designers had to use underground spaces and mezzanines for this purpose.<\/p>\n<h2>A management puzzle<\/h2>\n<p>A project can also be quite demanding from a management point of view. <strong>YIT<\/strong>, the management contractor for the project, worked with more than 100 subcontractors.<\/p>\n<p>To give you an idea of the project\u2019s many challenges, YIT published <a rel=\"noopener noreferrer nofollow\" href=\"https:\/\/www.youtube.com\/watch?v=pmkIiVLJFo8\" target=\"_blank\">a video of the steel arches being installed<\/a>. The massive steel segments were transported through the city at night in February and March 2017. The heaviest part of the arch weighs 86,000 kg and the smallest 36,000 kg; they were erected on temporary steel supports and then welded together.<\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=KYlWSxty1tU\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/www.youtube.com\/watch?v=KYlWSxty1tU<\/a><\/p>\n<h2>Will it stand the test of time?<\/h2>\n<p>The question that I often ask when seeing a project like this is, \u201cWill it be useful in the future?\u201d Construction costs are minor compared to the cost of using the building, but a nonfunctioning building is a liability, not an asset. I was once involved in the design of a large research laboratory. The client wanted to tailor the building\u2019s large research hall around specific large research installations. Eventually, the installation will become obsolete and costly alterations will be required.<\/p>\n<p>As for the central library, I think its versatile design will stand the test of time, whatever the future of books and the function of a library. The technical systems in an energy-efficient building are a bigger concern for the future. Will the interplay between ventilation, heating, the building envelope, and users be successful?<\/p>\n<p>Customers and users of the built environment are not interested in buildings per se; they yearn for good experiences. Whether the central library will enchant people remains to be seen. For all the effort it\u2019s required, I certainly hope so.<\/p>\n<p><em>You can learn more about the construction\u00a0on the official site of the library.<\/em><\/p>\n<p><em>The title image\u00a0is a press photo\u00a0provided by the city of Helsinki.<\/em><\/p>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/aec-business.com\/unique-challenging-helsinki-central-library-project\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] A construction site always looks more like a field experiment than an industrial process. In all fairness, the site &#8230; <a title=\"Unique and Challenging\u2014The Helsinki Central Library Project\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/unique-and-challenging-the-helsinki-central-library-project\/\" aria-label=\"Read more about Unique and Challenging\u2014The Helsinki Central Library Project\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1062,1066],"tags":[1162],"class_list":["post-31683","post","type-post","status-publish","format-standard","hentry","category-aec-business","category-all-posts","tag-smart-construction","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31683"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31683\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}