{"id":31773,"date":"2025-08-10T09:08:37","date_gmt":"2025-08-10T16:08:37","guid":{"rendered":"https:\/\/essential.construction\/news\/china-told-to-lift-veil-on-greyed-out-london-super-embassy-plans\/"},"modified":"2025-08-10T09:08:37","modified_gmt":"2025-08-10T16:08:37","slug":"china-told-to-lift-veil-on-greyed-out-london-super-embassy-plans","status":"publish","type":"post","link":"https:\/\/www.constructionenquirer.com\/2025\/08\/08\/uk-turns-up-heat-on-china-over-greyed-out-london-embassy-plans\/","title":{"rendered":"China told to lift veil on \u2018greyed-out\u2019 London super embassy plans"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<p>The deputy prime minister and housing secretary is demanding planning consultants for the Chinese embassy explain why detailed drawings for basement areas of the Royal Mint Court redevelopment plans have whole sections \u201cgreyed out\u201d.<\/p>\n<p>She has given Beijing until 20 August to respond as the Ministry of Housing, Communities and Local Government considers whether to grant planning for the called-in mega scheme.<\/p>\n<p>The \u00a3255m scheme is set to be Europe\u2019s largest embassy at 600,000 sq ft and is now being scrutinised by ministers\u00a0after Tower Hamlets rejected the embassy plan over safety and security concerns in 2022.<\/p>\n<div id=\"attachment_494308\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-01-26-at-21.49.57.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-494308 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-01-26-at-21.49.57.png\" alt=\"-\" width=\"1220\" height=\"766\"><\/a><\/p>\n<p class=\"wp-caption-text\">The proposed super embassy would include offices, a large basement area, housing for 200 staff, and a new tunnel to connect embassy buildings<\/p>\n<\/div>\n<p>It would sit just east of the City of London, opposite the Tower, near sensitive fibre optic links used by banks and major institutions.<\/p>\n<div class=\"break-out-box\">\n<h3>Embassy House plan for basement in John Smirke Building<\/h3>\n<hr>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-08-08-at-08.45.33.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-500401\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-08-08-at-08.45.33.png\" alt=\"-\" width=\"1054\" height=\"564\"><\/a><\/p>\n<\/div>\n<p>The project, designed by David Chipperfield Architects, would repurpose the listed Johnson Smirke and Seaman\u2019s Registry buildings, demolish others to make way for new residences, and add offices, a basement, housing for 200 staff, and a tunnel between key embassy buildings.<\/p>\n<p data-start=\"1186\" data-end=\"1435\">Two buildings \u2014 the Cultural Exchange Building and Embassy House \u2014 have had internal layouts redacted, while other blocks are partly blanked out.<\/p>\n<p data-start=\"1437\" data-end=\"1572\">The Home Office has already called for a \u201chard perimeter\u201d to block unregulated public access, a change that could trigger a new application.<\/p>\n<p data-start=\"2968\" data-end=\"3198\">Construction management advice is being provided by BCEGI UK, with Arcadis as project manager, Turner &amp; Townsend as cost consultant, Arup on structures and civils, Cundall on building services, and Thornton Tomasetti on facades.<\/p>\n<p data-start=\"3200\" data-end=\"3397\">A final decision is due next month, but Rayner\u2019s intervention leaves open the prospect that security concerns \u2014 not just planning policy \u2014 could derail what would be Europe\u2019s largest embassy.<\/p>\n<\/p><\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/08\/08\/uk-turns-up-heat-on-china-over-greyed-out-london-embassy-plans\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The deputy prime minister and housing secretary is demanding planning consultants for the Chinese embassy explain why detailed drawings for &#8230; <a title=\"China told to lift veil on \u2018greyed-out\u2019 London super embassy plans\" class=\"read-more\" href=\"https:\/\/www.constructionenquirer.com\/2025\/08\/08\/uk-turns-up-heat-on-china-over-greyed-out-london-embassy-plans\/\" aria-label=\"Read more about China told to lift veil on \u2018greyed-out\u2019 London super embassy plans\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-31773","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31773","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31773"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31773\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}