{"id":31900,"date":"2025-08-18T21:26:40","date_gmt":"2025-08-19T04:26:40","guid":{"rendered":"https:\/\/essential.construction\/news\/aureos-breaks-ground-on-45m-howden-relief-road\/"},"modified":"2025-08-18T21:26:40","modified_gmt":"2025-08-19T04:26:40","slug":"aureos-breaks-ground-on-45m-howden-relief-road","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/aureos-breaks-ground-on-45m-howden-relief-road\/","title":{"rendered":"Aureos breaks ground on \u00a345m Howden Relief Road"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-500632\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p data-start=\"198\" data-end=\"304\">The civils firm rebranded after being sold by Keltbray is delivering the 1.2km road which will link the A614 to Station Road over the two-year build programme.<\/p>\n<p data-start=\"613\" data-end=\"849\">Backed by East Riding of Yorkshire Council and developer JG Hatcliffe Associates, the road will pave the way for nearly 2,000 new homes, a new school, a pub and a Howdens Joinery factory as part of the wider HOW-G mixed-use expansion.<\/p>\n<div id=\"attachment_487933\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/HOWDENS-FACTORY-10-AERIAL-1.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-487933 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/HOWDENS-FACTORY-10-AERIAL-1.jpg\" alt=\"-\" width=\"1024\" height=\"625\"><\/a><\/p>\n<p class=\"wp-caption-text\">Planned 460,000 Howden kitchen unit factory, designed by UMC Architects<\/p>\n<\/div>\n<p data-start=\"1197\" data-end=\"1430\">\u00a0Initial works will start at the Thorpe Road end, with Aureos also delivering a new pump station and drainage improvements.<\/p>\n<p data-start=\"1432\" data-end=\"1612\">Funding is coming from a mix of developer contributions and council support via Invest East Yorkshire, including \u00a32m from a Devolution grant and \u00a31m from a Local Transport Grant.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/08\/18\/aureos-breaks-ground-on-45m-howden-relief-road\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The civils firm rebranded after being sold by Keltbray is delivering the 1.2km road which will link the A614 &#8230; <a title=\"Aureos breaks ground on \u00a345m Howden Relief Road\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/aureos-breaks-ground-on-45m-howden-relief-road\/\" aria-label=\"Read more about Aureos breaks ground on \u00a345m Howden Relief Road\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-31900","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31900","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31900"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31900\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31900"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31900"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}