{"id":31939,"date":"2025-08-21T09:33:39","date_gmt":"2025-08-21T16:33:39","guid":{"rendered":"https:\/\/essential.construction\/news\/kingsway-village-square-tops-off-one-year-after-excavation-start\/"},"modified":"2025-08-21T09:33:39","modified_gmt":"2025-08-21T16:33:39","slug":"kingsway-village-square-tops-off-one-year-after-excavation-start","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/kingsway-village-square-tops-off-one-year-after-excavation-start\/","title":{"rendered":"Kingsway Village Square Tops Off One Year After Excavation Start"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<td class=\"layout-content\">\n<div class=\"content\" style=\"&#9;visibility: hidden;\" id=\"content\">\n<div class=\"article-top\">\n<div class=\"content-info\"><span class=\"article-category\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/real-estate\" target=\"_blank\">REAL ESTATE<\/a><\/span>\u00a0<span class=\"article-subcategory\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/!\/new-homes\" target=\"_blank\">NEW HOMES<\/a><\/span><br \/><span id=\"article_info\">August 21, 2025 <span class=\"article-author\">by Anthony Teles<\/span><\/span>\u00a0\u00a0<span class=\"content-views\"><img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/views.png?14728329478\" alt=\"-\">\u00a0219\u00a0<\/span><\/div>\n<p><span id=\"article_title\">Kingsway Village Square Tops Off One Year After Excavation Start<\/span><\/p>\n<\/div>\n<div class=\"article-content\" id=\"article_content\">\n<div class=\"article-body\" id=\"article_body\">\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/kingsway-village-square-earlington.41452\" target=\"_blank\">Kingsway Village Square on Earlington<\/a> has now reached its full height, as <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/dunpar-homes.9916\" target=\"_blank\">Dunpar Homes<\/a>\u2019 10-storey rental building and adjoining three-storey townhouse block at 26 Earlington Avenue on the southwest corner with Dundas Street West has topped off a year <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2024\/09\/dunpar-homes-breaks-ground-kingsway-village-square-earlington.56916\" target=\"_blank\">after excavation began<\/a>. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/turner-fleischer-architects.8071\" target=\"_blank\">Turner Fleischer Architects<\/a>, the 141-suite mid-rise and 10 back-to-back townhomes are located in the leafy Kingsway area of Etobicoke. UrbanToronto recently spoke with Taylor Rogers, Project Director at Dunpar, to learn about the development strategies driving the project.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187168.jpg\" data-entity-uuid=\"insert-display_default-b9f5f8b2-9f4a-4452-964d-15b7b322075b\" data-entity-type=\"file\" alt=\"Kingsway Village Square on Earlington, Toronto, designed by Turner Fleischer Architects for Dunpar Homes\" title=\"Looking southwest to Kingsway Village Square on Earlington, designed by Turner Fleischer Architects for Dunpar Homes\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187168.jpg', true, 'Looking southwest to Kingsway Village Square on Earlington, designed by Turner Fleischer Architects for Dunpar Homes'); return false;\"><span class=\"image-description\">Looking southwest to Kingsway Village Square on Earlington, designed by Turner Fleischer Architects for Dunpar Homes<\/span><\/p>\n<p dir=\"ltr\">\u201cWe poured our last cubic metre of concrete on July 17th, almost exactly one year from when we started drilling piles,\u201d Rogers recounted. Work began with pile drilling in July, 2024, followed by the arrival of the crane on October 7, 2024. In the year that followed, crews placed over 1,000 tons of rebar and poured roughly 10,000m\u00b3 of concrete (the equivalent of about 1,100 truckloads) to bring the structure to its final 37.8m height.<\/p>\n<p dir=\"ltr\">\u201cWe\u2019ve had 30 lost days from wind, rain, and snow, and the teams were still able to push the schedule and perform,\u201d Rogers added.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187172.jpeg\" data-entity-uuid=\"insert-display_default-2551fdab-3b7b-4a1a-9d69-957b50b72c2a\" data-entity-type=\"file\" alt=\"Kingsway Village Square on Earlington, Toronto, designed by Turner Fleischer Architects for Dunpar Homes\" title=\"Looking southwest to the tower crane in October, 2024, image by UrbanToronto Forum contributor ProjectEnd\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187172.jpeg', true, 'Looking southwest to the tower crane in October, 2024, image by UrbanToronto Forum contributor ProjectEnd'); return false;\"><span class=\"image-description\">Looking southwest to the tower crane in October, 2024, image by UrbanToronto Forum contributor ProjectEnd<\/span><\/p>\n<p dir=\"ltr\">Excavation moved quickly thanks to the use of high-capacity excavators and specialized buckets and attachments, clearing roughly 3,800 truckloads of soil and rock down to the crane base in under three months. Formwork cycles were accelerated with a quick-deck system in the parking levels, while sections of fly tables were pre-fabricated off-site.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187483.jpeg\" data-entity-uuid=\"insert-display_default-9286464e-f0df-4a65-b5b1-eb04e597c154\" data-entity-type=\"file\" alt=\"Kingsway Village Square on Earlington, Toronto, designed by Turner Fleischer Architects for Dunpar Homes\" title=\"Construction crews actively working onsite, image courtesy of Dunpar Homes\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187483.jpeg', true, 'Construction crews actively working onsite, image courtesy of Dunpar Homes'); return false;\"><span class=\"image-description\">Construction crews actively working onsite, image courtesy of Dunpar Homes<\/span><\/p>\n<p dir=\"ltr\">By the time of topping off, exterior wall framing had reached the seventh floor and begun on the eighth, mast-climber masonry was advancing on the east elevation, and windows were installed up to the sixth floor. Below grade, the garages were largely complete, with demising wall framing, mechanical and electrical rough-ins, and preparations for boarding underway.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187169.jpg\" data-entity-uuid=\"insert-display_default-f4a3e734-0422-45a7-9637-1bf1253baee5\" data-entity-type=\"file\" alt=\"Kingsway Village Square on Earlington, Toronto, designed by Turner Fleischer Architects for Dunpar Homes\" title=\"The project standing three storeys above grade at the northeast corner in April, 2025, image by UrbanToronto Forum contributor GenerationLee\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187169.jpg', true, 'The project standing three storeys above grade at the northeast corner in April, 2025, image by UrbanToronto Forum contributor GenerationLee'); return false;\"><span class=\"image-description\">The project standing three storeys above grade at the northeast corner in April, 2025, image by UrbanToronto Forum contributor GenerationLee<\/span><\/p>\n<p dir=\"ltr\">\u201cI\u2019d rather be looking at it than looking for it,\u201d Rogers said of Dunpar\u2019s approach to organizing the site and keeping the schedule on track. The team moved early to secure and store key materials, anticipating supply chain issues and tariff impacts. Metal studs, sheathing, sprinkler pipe and pumps, and major mechanical units were all pre-ordered, pre-paid, and warehoused well before they were needed on site.<\/p>\n<p dir=\"ltr\">\u201cWe got ahead of it, and that\u2019s why we\u2019ve been able to drive this schedule so successfully: we have what we need when we need it,\u201d he explained. That same strategy extended to choosing Canadian suppliers where possible, such as Ontario-based Delta Elevator, to avoid cross-border delays.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187171.jpeg\" data-entity-uuid=\"insert-display_default-ad88684e-a0e1-4a8f-9581-138482334bf3\" data-entity-type=\"file\" alt=\"Kingsway Village Square on Earlington, Toronto, designed by Turner Fleischer Architects for Dunpar Homes\" title=\"Looking northwest along Earlington Avenue to the development standing eight storeys in July, 2025, image by UrbanToronto Forum contributor Towered\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187171.jpeg', true, 'Looking northwest along Earlington Avenue to the development standing eight storeys in July, 2025, image by UrbanToronto Forum contributor Towered'); return false;\"><span class=\"image-description\">Looking northwest along Earlington Avenue to the development standing eight storeys in July, 2025, image by UrbanToronto Forum contributor Towered<\/span><\/p>\n<p dir=\"ltr\">For the building\u2019s envelope, all exterior walls are finished in hand-laid masonry, with an insulated cavity fully packed with mineral wool. Unlike many mid-rises that rely on window wall systems, suites here are framed with solid exterior walls and punched openings. At the upper levels, arched oval window units add a distinctive architectural touch, with installation progressing in step with the advancing exterior framing.<\/p>\n<p dir=\"ltr\">The top two floors are configured as expansive two-storey penthouses, each entered from the ninth floor with living spaces below and bedrooms above. All suites in the building feature 10-foot ceilings, with the penthouses enjoying outdoor terraces framed by a striking structural detail: a roof slab that projects three metres beyond the building face. The move combines a dramatic architectural profile with practical shelter for the terraces below.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187170.jpg\" data-entity-uuid=\"insert-display_default-12d3accb-3fdd-4e22-9155-9c20d40adee6\" data-entity-type=\"file\" alt=\"Kingsway Village Square on Earlington, Toronto, designed by Turner Fleischer Architects for Dunpar Homes\" title=\"Looking southwest this month to the topped off building, image by UrbanToronto Forum contributor IrishCanadian98\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59178\/59178-187170.jpg', true, 'Looking southwest this month to the topped off building, image by UrbanToronto Forum contributor IrishCanadian98'); return false;\"><span class=\"image-description\">Looking southwest this month to the topped off building, image by UrbanToronto Forum contributor IrishCanadian98<\/span><\/p>\n<p dir=\"ltr\">Rogers credits much of the project\u2019s steady pace to the collaborative environment on-site. A cooling labour market has allowed Dunpar and its contractors to retain top-performing crews. \u201cIt\u2019s been a real team effort. The trades are working together again instead of against each other, and I\u2019m proud of them,\u201d he said.<\/p>\n<p dir=\"ltr\">With the structure topped off, work now shifts toward closing in the building and advancing interior fit-out. Occupancy is currently planned for Spring, 2026.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Forum thread, or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p><em>UrbanToronto has a research service,<\/em><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\"><em>UTPro<\/em><\/a><em>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <\/em><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\"><em>Instant Reports<\/em><\/a><em>, downloadable snapshots based on location, and a daily subscription newsletter, <\/em><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\"><em>New Development Insider<\/em><\/a><em>, that tracks projects from initial application.\u200b\u200b\u200b<\/em><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\"><em> Development Insider<\/em><\/a><em>, that tracks projects from initial application.\u200b\u200b\u200b<\/em><\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<\/div>\n<div class=\"articles\" id=\"articles\">\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/more-content.png?14728329478\" onclick=\"loadArticles();\" alt=\"-\"><\/p><\/div>\n<\/div>\n<\/td>\n<td class=\"trending-column\" style=\"display: none;\" id=\"trending_block\"\/>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/08\/kingsway-village-square-tops-one-year-after-excavation-start.59178\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] REAL ESTATE\u00a0NEW HOMESAugust 21, 2025 by Anthony Teles\u00a0\u00a0\u00a0219\u00a0 Kingsway Village Square Tops Off One Year After Excavation Start Kingsway &#8230; <a title=\"Kingsway Village Square Tops Off One Year After Excavation Start\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/kingsway-village-square-tops-off-one-year-after-excavation-start\/\" aria-label=\"Read more about Kingsway Village Square Tops Off One Year After Excavation Start\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-31939","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31939","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31939"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31939\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31939"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31939"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31939"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}