{"id":31947,"date":"2025-08-21T21:35:07","date_gmt":"2025-08-22T04:35:07","guid":{"rendered":"https:\/\/essential.construction\/news\/cladding-streetscaping-advance-on-cherry-house-at-canary-landing\/"},"modified":"2025-08-21T21:35:07","modified_gmt":"2025-08-22T04:35:07","slug":"cladding-streetscaping-advance-on-cherry-house-at-canary-landing","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/cladding-streetscaping-advance-on-cherry-house-at-canary-landing\/","title":{"rendered":"Cladding, Streetscaping Advance on Cherry House at Canary Landing"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<td class=\"layout-content\">\n<div class=\"content\" style=\"&#9;visibility: hidden;\" id=\"content\">\n<div class=\"article-top\">\n<div class=\"content-info\"><span class=\"article-category\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/development\" target=\"_blank\">DEVELOPMENT<\/a><\/span>\u00a0<span class=\"article-subcategory\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/!\/construction\" target=\"_blank\">CONSTRUCTION<\/a><\/span><br \/><span id=\"article_info\">August 21, 2025 <span class=\"article-author\">by Anthony Teles<\/span><\/span>\u00a0\u00a0<span class=\"content-views\"><img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/views.png?14728329478\" alt=\"-\">\u00a0553\u00a0<\/span><\/div>\n<p><span id=\"article_title\">Cladding, Streetscaping Advance on Cherry House at Canary Landing<\/span><\/p>\n<\/div>\n<div class=\"article-content\" id=\"article_content\">\n<div class=\"article-body\" id=\"article_body\">\n<p>Work on <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/cherry-house-canary-landing.39101\" target=\"_blank\">Cherry House at Canary Landing<\/a> is now concentrated on the ground plane of the mid-rise development next to Toronto&#8217;s Distillery District, where finishing touches to the podium levels and streetscape are advancing. Located at Mill and Cherry streets, the project comes from <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/dream-unlimited.7880\" target=\"_blank\">Dream Unlimited<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/kilmer-group.8677\" target=\"_blank\">Kilmer Group<\/a>, and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/tricon-residential.8368\" target=\"_blank\">Tricon Residential<\/a>, with a design by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/cobe-architects.19180\" target=\"_blank\">COBE Architects<\/a> and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/architectsalliance.7955\" target=\"_blank\">architects\u2014Alliance<\/a>. The three-building complex, one rising 12 storeys and two reaching 13, had a single crane remaining when last reported on in <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2025\/03\/one-crane-remains-above-cherry-house-canary-landing.58099\" target=\"_blank\">March, 2025<\/a> by UrbanToronto; now, the last crane has been removed.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187684.jpeg\" data-entity-uuid=\"insert-display_default-300955ef-a2a9-4927-bcc6-05cf6586913e\" data-entity-type=\"file\" alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential\" title=\"Looking southeast to Cherry House at Canary Landing, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187684.jpeg', true, 'Looking southeast to Cherry House at Canary Landing, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential'); return false;\"><span class=\"image-description\">Looking southeast to Cherry House at Canary Landing, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential<\/span><\/p>\n<p dir=\"ltr\">In July, 2025, the complex\u2019s east-end elevation was active with crews working on applying brick-faced precast panels on the second through fourth floors. The building\u2019s salmon-toned precast frames the podium levels, contrasting with the dark mullions around the windows. Above, the massing shifts as the fifth floor cantilevers on the south side, with lighter-toned corrugated aluminum panels and glazing cladding the upper levels. A white hydraulic mobile crane is stationed to the left.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187677.jpg\" data-entity-uuid=\"insert-display_default-015fbdac-4f07-4943-9080-8051db7df3d6\" data-entity-type=\"file\" alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential\" title=\"Crews work on the exposed podium levels at the west building, image by UrbanToronto Forum contributor GameOnBrad\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187677.jpg', true, 'Crews work on the exposed podium levels at the west building, image by UrbanToronto Forum contributor GameOnBrad'); return false;\"><span class=\"image-description\">Crews work on the exposed podium levels at the west building, image by UrbanToronto Forum contributor GameOnBrad<\/span><\/p>\n<p dir=\"ltr\">Looking southwest to the 12-storey building on Mill Street, fencing has been removed to reveal completed streetscaping along Cherry Street and an east-west lane. The podium is clad in smooth champagne-toned metal panels at grade, framed by an overhang from the second floor. Above, the facade transitions to a grid of red brick-patterned precast framing large window wall panels. The new sidewalk features light concrete pavers with tree plantings and curb cuts, while the laneway remains unfinished.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187678.jpg\" data-entity-uuid=\"insert-display_default-813a06ba-cdcd-428d-9b1e-31c3e5649187\" data-entity-type=\"file\" alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential\" title=\"Completed sidewalks and clad lower levels for the Mill Street frontage, image by UrbanToronto Forum contributor GameOnBrad\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187678.jpg', true, 'Completed sidewalks and clad lower levels for the Mill Street frontage, image by UrbanToronto Forum contributor GameOnBrad'); return false;\"><span class=\"image-description\">Completed sidewalks and clad lower levels for the Mill Street frontage, image by UrbanToronto Forum contributor GameOnBrad<\/span><\/p>\n<p dir=\"ltr\">Along Cherry Street, looking north, sidewalk reconstruction is underway with crews levelling the sub-base and setting interlocking pavers. The landscaped edge includes new street trees and benches. To the left, the building\u2019s podium appears as a series of precast-clad piers with vertical ribs.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187679.jpg\" data-entity-uuid=\"insert-display_default-8a89fe46-f6e9-4a73-afc2-2ca3397695d3\" data-entity-type=\"file\" alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential\" title=\"Sidewalk reconstruction along Cherry Street including new interlocking pavers, image by UrbanToronto Forum contributor GameOnBrad\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187679.jpg', true, 'Sidewalk reconstruction along Cherry Street including new interlocking pavers, image by UrbanToronto Forum contributor GameOnBrad'); return false;\"><span class=\"image-description\">Sidewalk reconstruction along Cherry Street including new interlocking pavers, image by UrbanToronto Forum contributor GameOnBrad<\/span><\/p>\n<p dir=\"ltr\">The west building shows recent progress with the removal of the construction hoist, leaving a gap in the cladding higher up. At grade, stacks of interlocking pavers and facade materials are staged along the frontage, while a yellow hydraulic mobile crane supports ongoing envelope work. On the upper levels, corrugated aluminum panels shift visually from white in direct sun to grey in shadow.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187680.jpg\" data-entity-uuid=\"insert-display_default-3d952fb1-7e23-43bf-b926-48785613d763\" data-entity-type=\"file\" alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential\" title=\"West elevation of the west building mostly clad after remove of the construction hoist, image by UrbanToronto Forum contributor GameOnBrad\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187680.jpg', true, 'West elevation of the west building mostly clad after remove of the construction hoist, image by UrbanToronto Forum contributor GameOnBrad'); return false;\"><span class=\"image-description\">West elevation of the west building mostly clad after remove of the construction hoist, image by UrbanToronto Forum contributor GameOnBrad<\/span><\/p>\n<p dir=\"ltr\">Curbs have now been poured along the laneway. Fresh concrete pads outline recessed areas, alongside a curved curb segment with embedded metal texture plates, with staged pavers and construction debris nearby.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187681.jpg\" data-entity-uuid=\"insert-display_default-99289239-caad-4725-9ef6-a5f4692072f6\" data-entity-type=\"file\" alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential\" title=\"Freshly poured curbs and concrete pads outline the laneway, image by UrbanToronto Forum contributor GameOnBrad\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187681.jpg', true, 'Freshly poured curbs and concrete pads outline the laneway, image by UrbanToronto Forum contributor GameOnBrad'); return false;\"><span class=\"image-description\">Freshly poured curbs and concrete pads outline the laneway, image by UrbanToronto Forum contributor GameOnBrad<\/span><\/p>\n<p dir=\"ltr\">Interlocking installation is advancing along the laneway, with crews laying a mix of red and darker-toned pavers. The patterned paving is being set over a compacted granular base, with alignment controlled by string lines.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187682.jpg\" data-entity-uuid=\"insert-display_default-ba38441c-4f28-4841-9572-0d4f0a30076f\" data-entity-type=\"file\" alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential\" title=\"Interlocking pavers in red and dark tones extend down the laneway, image by UrbanToronto Forum contributor GameOnBrad\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187682.jpg', true, 'Interlocking pavers in red and dark tones extend down the laneway, image by UrbanToronto Forum contributor GameOnBrad'); return false;\"><span class=\"image-description\">Interlocking pavers in red and dark tones extend down the laneway, image by UrbanToronto Forum contributor GameOnBrad<\/span><\/p>\n<p dir=\"ltr\">Along another part of the laneway, plastic armature for silva cells is in place, and soil is being pumped into and around the the gridded structure. Once completed, paving materials are supported by the silva cells while they prevent compaction of the earth underneath them, allowing tree roots to spread more easily, fostering quicker and fuller growth.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187699.jpeg\" data-entity-uuid=\"insert-display_default-16ac6f52-c6e7-47bf-aafa-55b659b95e3f\" data-entity-type=\"file\" alt=\"Soil being pumped into silva cells to support new tree growth along the laneway\" title=\"Soil being pumped into silva cells to support new tree growth along the laneway, image by UrbanToronto Forum contributor GameOnBrad\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187699.jpeg', true, 'Soil being pumped into silva cells to support new tree growth along the laneway, image by UrbanToronto Forum contributor GameOnBrad'); return false;\"><span class=\"image-description\">Soil being pumped into silva cells to support new tree growth along the laneway, image by UrbanToronto Forum contributor GameOnBrad<\/span><\/p>\n<p dir=\"ltr\">\u00a0<\/p>\n<p dir=\"ltr\">Evening light highlights the completed facades around the Cherry House courtyard. The pedestrian mews between the east and west buildings remains under construction, with concrete pads poured and recessed zones left open for landscaping and tree plantings. Conduit stubs and utility sleeves rise from the ground, while construction equipment and materials occupy the unfinished plaza, backlit by the transparent retail glazing at grade.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187683.jpeg\" data-entity-uuid=\"insert-display_default-481d8e05-a974-496b-b888-6c480dcd7fb5\" data-entity-type=\"file\" alt=\"Cherry House at Canary Landing, Toronto, designed by ArchitectsAlliance and COBE Architects for Dream Unlimited, Kilmer Group &amp; Tricon Residential\" title=\"Courtyard and pedestrian mews, image by UrbanToronto Forum contributor ducky\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59275\/59275-187683.jpeg', true, 'Courtyard and pedestrian mews, image by UrbanToronto Forum contributor ducky'); return false;\"><span class=\"image-description\">Courtyard and pedestrian mews, image by UrbanToronto Forum contributor ducky<\/span><\/p>\n<p dir=\"ltr\">Once complete, Cherry House will deliver 855 residential units across the complex, with its tallest height at 50.32m.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Forum thread, or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service,<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\"> Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<\/div>\n<div class=\"articles\" id=\"articles\">\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/more-content.png?14728329478\" onclick=\"loadArticles();\" alt=\"-\"><\/p><\/div>\n<\/div>\n<\/td>\n<td class=\"trending-column\" style=\"display: none;\" id=\"trending_block\"\/>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/08\/cladding-streetscaping-advance-cherry-house-canary-landing.59275\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] DEVELOPMENT\u00a0CONSTRUCTIONAugust 21, 2025 by Anthony Teles\u00a0\u00a0\u00a0553\u00a0 Cladding, Streetscaping Advance on Cherry House at Canary Landing Work on Cherry House &#8230; <a title=\"Cladding, Streetscaping Advance on Cherry House at Canary Landing\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/cladding-streetscaping-advance-on-cherry-house-at-canary-landing\/\" aria-label=\"Read more about Cladding, Streetscaping Advance on Cherry House at Canary Landing\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-31947","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31947","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=31947"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/31947\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=31947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=31947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=31947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}