{"id":32012,"date":"2025-08-25T21:44:43","date_gmt":"2025-08-26T04:44:43","guid":{"rendered":"https:\/\/essential.construction\/news\/400-king-west-tops-off-with-cladding-advancing\/"},"modified":"2025-08-25T21:44:43","modified_gmt":"2025-08-26T04:44:43","slug":"400-king-west-tops-off-with-cladding-advancing","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/400-king-west-tops-off-with-cladding-advancing\/","title":{"rendered":"400 King West Tops Off with Cladding Advancing"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/400-king-west.27748\" target=\"_blank\">400 King West<\/a> is topping off in Toronto\u2019s Entertainment District, with forming crews now completing work on the mechanical penthouse. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bdp-quadrangle.8043\" target=\"_blank\">BDP Quadrangle<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/plaza.7794\" target=\"_blank\">Plaza<\/a>, UrbanToronto last reported on construction progress at the 49-storey mixed-use condo at King and Charlotte streets in <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2025\/04\/400-king-west-rising-higher-entertainment-district-skyline.58340\" target=\"_blank\">April, 2025<\/a>.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187788.jpeg\" data-entity-uuid=\"insert-display_default-303c3f57-b63c-4818-b9a2-e0d10600aeb7\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"Looking northeast to 400 King West, designed by BDP Quadrangle for Plaza\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187788.jpeg', true, 'Looking northeast to 400 King West, designed by BDP Quadrangle for Plaza'); return false;\"><span class=\"image-description\">Looking northeast to 400 King West, designed by BDP Quadrangle for Plaza<\/span><\/p>\n<p dir=\"ltr\">In May, 2025, the ground and second floors were enclosed behind a glass curtain wall. Above, the brick-faced-precast cladding is installed as projecting piers. Tinted window wall glazing with dark-grey mullions and spandrel panels enclose the upper podium levels, where inset balcony slabs at the fifth and sixth floors are visible.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187782.jpeg\" data-entity-uuid=\"insert-display_default-47094b5e-9c0b-4433-aca8-0c7c8a81cd91\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"Looking northwest to the podium cladding and curtain wall along King Street West, image by UrbanToronto Forum contributor christiesplits\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187782.jpeg', true, 'Looking northwest to the podium cladding and curtain wall along King Street West, image by UrbanToronto Forum contributor christiesplits'); return false;\"><span class=\"image-description\">Looking northwest to the podium cladding and curtain wall along King Street West, image by UrbanToronto Forum contributor christiesplits<\/span><\/p>\n<p dir=\"ltr\">Looking southwest in July, 2025, the tower had risen to about 47 storeys. The window wall system, featuring dark glazing and mullions, enclosed the tower up to the 22nd floor, with partial installation underway on the 23rd floor. Vertical white precast concrete fins frame the window bays and are in place as high as the 29th floor. Step-backs on the east elevation are evident at the 7th floor, above the brick podium, and again at the 11th floor, where the projecting white volume defines the mid-rise transition, mirrored by a similar setback on the north face toward the west side.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187783.jpeg\" data-entity-uuid=\"insert-display_default-8bd13443-895e-4689-a774-c6cf54721146\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"Looking southwest to the tower's step-backs and advancing cladding and glazing, image by UrbanToronto Forum contributor Totti\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187783.jpeg', true, 'Looking southwest to the tower's step-backs and advancing cladding and glazing, image by UrbanToronto Forum contributor Totti'); return false;\"><span class=\"image-description\">Looking southwest to the tower&#8217;s step-backs and advancing cladding and glazing, image by UrbanToronto Forum contributor Totti<\/span><\/p>\n<p dir=\"ltr\">A July close-up shows the 47th floor formed across much of the south elevation, with concrete shear walls and perimeter columns topped by projecting rebar awaiting the final pour on the left-hand side. Decking is in place for the 48th-floor slab. The top of the construction hoist&#8217;s mast is just visible climbing the south facade at left, while the luffing crane occupies the centre of the frame behind a concrete boom pump.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187784.jpg\" data-entity-uuid=\"insert-display_default-0ba6ecd4-bfce-4be0-aa80-a396f042fa07\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"Close-up of upper tower formwork along the south elevation, image by UrbanToronto Forum contributor AHK\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187784.jpg', true, 'Close-up of upper tower formwork along the south elevation, image by UrbanToronto Forum contributor AHK'); return false;\"><span class=\"image-description\">Close-up of upper tower formwork along the south elevation, image by UrbanToronto Forum contributor AHK<\/span><\/p>\n<p dir=\"ltr\">In a drone view from this month, the roof slab is being formed above the 49th floor, as work shifts to completing the mechanical penthouse. The uppermost levels, with the penthouse floors beginning at 47 and the mechanical penthouse at 48, feature higher ceiling heights, which will be expressed with copper-toned metal panels and grey spandrel cladding. Below, glazing installation is complete to approximately the 26th floor, while white precast concrete fins rise to about the 35th.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187785.jpg\" data-entity-uuid=\"insert-display_default-3d56ae90-d9f9-400f-9bbb-55aaa2ba92c9\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"A drone view of the east elevation and the poured rooftop slab, image by UrbanToronto Forum contributor kotsy\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187785.jpg', true, 'A drone view of the east elevation and the poured rooftop slab, image by UrbanToronto Forum contributor kotsy'); return false;\"><span class=\"image-description\">A drone view of the east elevation and the poured rooftop slab, image by UrbanToronto Forum contributor kotsy<\/span><\/p>\n<p dir=\"ltr\">Looking northeast later this month, green weatherproofing remains exposed around some of the balcony recesses. At the southwest corner, the construction hoist rises through an indented volume wrapped in protective tarps. Projecting white balcony slabs are visible across the south elevation.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187786.jpg\" data-entity-uuid=\"insert-display_default-0de9a328-3329-42b8-b5a5-5997330c0c1f\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"Looking northeast from King Street West and Charlotte Street, image by UrbanToronto Forum contributor KAR246\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59293\/59293-187786.jpg', true, 'Looking northeast from King Street West and Charlotte Street, image by UrbanToronto Forum contributor KAR246'); return false;\"><span class=\"image-description\">Looking northeast from King Street West and Charlotte Street, image by UrbanToronto Forum contributor KAR246<\/span><\/p>\n<p dir=\"ltr\">On the lower floors of the east elevation, floors seven to ten are framed by white vertical fins. Beneath that are three floors of dark glazing, and under that three storeys of bare concrete. The window wall system has advanced to the 27th floor, with a panel on the 28th, and the precast concrete now at the 37th floor. Upon completion, the tower will stand 164.58m and deliver 630 condominium units.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Forum thread, or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service,<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\"> Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bdp-quadrangle.8043\" target=\"_blank\">BDP Quadrangle<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bousfields.7652\" target=\"_blank\">Bousfields<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/gradient-wind-engineers-scientists.43829\" target=\"_blank\">Gradient Wind Engineers &amp; Scientists<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/groundwater-environmental-management-services-inc-gems.45990\" target=\"_blank\">Groundwater Environmental Management Services Inc. (GEMS)<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/hgc-noise-vibration-acoustics.44108\" target=\"_blank\">HGC Noise Vibration Acoustics<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/jablonsky-ast-and-partners.35673\" target=\"_blank\">Jablonsky, Ast and Partners<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/janet-rosenberg-studio.8158\" target=\"_blank\">Janet Rosenberg &amp; Studio<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/live-patrol-inc.30547\" target=\"_blank\">Live Patrol Inc.<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/plaza.7794\" target=\"_blank\">Plaza<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rebar-enterprises-inc.44797\" target=\"_blank\">Rebar Enterprises Inc<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/fence-people.48575\" target=\"_blank\">The Fence People<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/u31.8143\" target=\"_blank\">U31<\/a><\/td>\n<\/tr>\n<\/table>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/08\/400-king-west-tops-cladding-advancing.59293\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] 400 King West is topping off in Toronto\u2019s Entertainment District, with forming crews now completing work on the mechanical &#8230; <a title=\"400 King West Tops Off with Cladding Advancing\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/400-king-west-tops-off-with-cladding-advancing\/\" aria-label=\"Read more about 400 King West Tops Off with Cladding Advancing\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-32012","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32012"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32012\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}