{"id":32064,"date":"2025-08-29T09:51:39","date_gmt":"2025-08-29T16:51:39","guid":{"rendered":"https:\/\/essential.construction\/news\/three-tower-rental-community-proposed-beside-mimico-go\/"},"modified":"2025-08-29T09:51:39","modified_gmt":"2025-08-29T16:51:39","slug":"three-tower-rental-community-proposed-beside-mimico-go","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/three-tower-rental-community-proposed-beside-mimico-go\/","title":{"rendered":"Three-Tower Rental Community Proposed Beside Mimico GO"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<td class=\"layout-content\">\n<div class=\"content\" style=\"&#9;visibility: hidden;\" id=\"content\">\n<div class=\"article-top\">\n<div class=\"content-info\"><span class=\"article-category\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/development\" target=\"_blank\">DEVELOPMENT<\/a><\/span>\u00a0<span class=\"article-subcategory\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/!\/planning\" target=\"_blank\">PLANNING<\/a><\/span><br \/><span id=\"article_info\">August 29, 2025 <span class=\"article-author\">by Anthony Teles<\/span><\/span>\u00a0\u00a0<span class=\"content-views\"><img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/views.png?14728329478\" alt=\"-\">\u00a058\u00a0<\/span><\/div>\n<p><span id=\"article_title\">Three-Tower Rental Community Proposed Beside Mimico GO<\/span><\/p>\n<\/div>\n<div class=\"article-content\" id=\"article_content\">\n<div class=\"article-body\" id=\"article_body\">\n<p>A change of ownership following the receivership of Vandyk Properties has led to a new development application to the City of Toronto for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/39-newcastle.22107\" target=\"_blank\">39 Newcastle Street<\/a> in South Etobicoke, with <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/osmington-gerofsky-development-corp.49037\" target=\"_blank\">Osmington Gerofsky Development Corp.<\/a> now steering the site forward. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/tact-architecture.8066\" target=\"_blank\">TACT Architecture<\/a>, the proposal beside Mimico GO station calls for three rental towers ranging from 39 to 42 storeys on a triangular parcel on the southeast corner of Newcastle and Windsor streets.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188029.jpg\" data-entity-uuid=\"insert-display_default-e72345e0-a939-40ca-8abe-152b98dd6b0e\" data-entity-type=\"file\" alt=\"39 Newcastle Street, Toronto, designed by TACT Architecture for Osmington Gerofsky Development Corp\" title=\"A high-angle view looking east to 39 Newcastle Street, designed by TACT Architecture for Osmington Gerofsky Development Corp\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188029.jpg', true, 'A high-angle view looking east to 39 Newcastle Street, designed by TACT Architecture for Osmington Gerofsky Development Corp'); return false;\"><span class=\"image-description\">A high-angle view looking east to 39 Newcastle Street, designed by TACT Architecture for Osmington Gerofsky Development Corp<\/span><\/p>\n<p dir=\"ltr\">The immediate context around the long-vacant lot is shaped by rail infrastructure and older low-rise employment buildings, while more recent townhouses and the GO station entrance are found to the west. Low-rise retail can be found along Royal York Road further west, while residential streets extend to all sides beyond the industrial and rail sites. Mid-rise and high-rise proposals and projects are beginning to replace the low-rise buildings around the site as well as south of the rail corridor and along Royal York Road.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188034.jpg\" data-entity-uuid=\"insert-display_default-33d2dae0-aa98-4eae-a17a-eb7672413640\" data-entity-type=\"file\" alt=\"Aerial view, 39 Newcastle Street, Toronto\" title=\"An aerial view of the site and surrounding area, image from submission to City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188034.jpg', true, 'An aerial view of the site and surrounding area, image from submission to City of Toronto'); return false;\"><span class=\"image-description\">An aerial view of the site and surrounding area, image from submission to City of Toronto<\/span><\/p>\n<p dir=\"ltr\">The site has been the subject of multiple proposals and planning processes over the past decade. An early rezoning in 2017 sought three towers of 22, 30, and 36 storeys, but City staff recommended refusal for not aligning with the Mimico-Judson Secondary Plan. A revised application later secured LPAT approval in 2020 for three towers up to 36 storeys, though the by-law was never enacted. In 2022, the Province issued a Minister\u2019s Zoning Order (MZO) tied to a Transit Oriented Community agreement with Metrolinx, allowing four towers of up to 36 storeys across 39 Newcastle and the adjoining rail lands.<\/p>\n<p dir=\"ltr\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/vandyk-properties.8519\" target=\"_blank\">Vandyk Properties<\/a> advanced the plan under their <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2023\/05\/mimico-go-transit-oriented-community-moves-forward.52330\" target=\"_blank\">Grand Central Mimico<\/a> marketing banner that included <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/327-royal-york-road.8778\" target=\"_blank\">327 Royal York<\/a>, submitting a site plan application in 2023, but financial collapse of the company brought all of that to a halt. By late 2023, the 39 Newcastle lands were placed in receivership at the request of Otera Capital, while neighbouring holdings at 327 Royal York also fell into receivership. Metrolinx, which had a partnership with Vandyk, dissolved it the following year, and an MZO for the site was repealed in 2024.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188035.jpeg\" data-entity-uuid=\"insert-display_default-27e3cb57-905a-4b1b-b96c-82b0e21ceb10\" data-entity-type=\"file\" alt=\"Previous plan, 39 Newcastle Street, designed by SvN and Kohn Partnership Architects for Vandyk Properties\" title=\"Previous plan designed by SvN and Kohn Partnership Architects for Vandyk Properties\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188035.jpeg', true, 'Previous plan designed by SvN and Kohn Partnership Architects for Vandyk Properties'); return false;\"><span class=\"image-description\">Previous plan designed by SvN and Kohn Partnership Architects for Vandyk Properties<\/span><\/p>\n<p dir=\"ltr\">New developer Osmington Gerofsky has not submitted Official Plan and Zoning By-law Amendment applications to permit three towers rising 134.23m to 143.93m. Phase 1 would deliver the eastern 42-storey tower with 508 units above a five-storey podium, while Phase 2 would add the western towers with 1,070 units combined on a podium stepping from five to seven storeys. Together, the three buildings account for 1,578 rental suites and a total Gross Floor Area of 105,835m\u00b2, broken down into 105,325m\u00b2 of residential and 510m\u00b2 of retail space. The plan yields a Floor Space Index of 13.41 times coverage of the 7,895m\u00b2 property.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188032.jpg\" data-entity-uuid=\"insert-display_default-40940839-2d73-4c61-ad78-176bbadf3c3c\" data-entity-type=\"file\" alt=\"Site plan, 39 Newcastle Street, Toronto, designed by TACT Architecture for Osmington Gerofsky Development Corp\" title=\"Site plan, designed by TACT Architecture for Osmington Gerofsky Development Corp\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188032.jpg', true, 'Site plan, designed by TACT Architecture for Osmington Gerofsky Development Corp'); return false;\"><span class=\"image-description\">Site plan, designed by TACT Architecture for Osmington Gerofsky Development Corp<\/span><\/p>\n<p dir=\"ltr\">Retail would be focused at the northwest and southwest corners, positioned to activate the public realm, featuring a new 398m\u00b2 central POPS (Privately-Owned Publicly-accessible Space) fronting Windsor Street. Amenity areas would entail 2,474m\u00b2 indoors and 2,261m\u00b2 outdoors, located at grade and the eighth floors of the towers. Each tower is designed with five elevators, working out to about one for every 102 units in Phase 1 and 107 units across Phase 2, requiring higher motor speeds for adequate service in the larger building.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188031.jpg\" data-entity-uuid=\"insert-display_default-57cd21b3-cd3a-4b5a-a304-fd1dfbb28132\" data-entity-type=\"file\" alt=\"39 Newcastle Street, Toronto, designed by TACT Architecture for Osmington Gerofsky Development Corp\" title=\"Looking northeast to the POPS, image from submission to City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188031.jpg', true, 'Looking northeast to the POPS, image from submission to City of Toronto'); return false;\"><span class=\"image-description\">Looking northeast to the POPS, image from submission to City of Toronto<\/span><\/p>\n<p dir=\"ltr\">Three levels of underground parking are planned, split between east and west garages to serve each phase. The garage would accommodate 406 parking spaces for residents and 19 for visitors, while cycling facilities would be divided into 537 long-term and 55 short-term spots.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188033.jpg\" data-entity-uuid=\"insert-display_default-5c3ccc3a-ae0f-4e41-8714-576ac48dde9b\" data-entity-type=\"file\" alt=\"Ground floor plan, 39 Newcastle Street, Toronto, designed by TACT Architecture for Osmington Gerofsky Development Corp\" title=\"Ground floor plan, designed by TACT Architecture for Osmington Gerofsky Development Corp\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188033.jpg', true, 'Ground floor plan, designed by TACT Architecture for Osmington Gerofsky Development Corp'); return false;\"><span class=\"image-description\">Ground floor plan, designed by TACT Architecture for Osmington Gerofsky Development Corp<\/span><\/p>\n<p dir=\"ltr\">Mimico GO station on the Lakeshore West line is less than 100m away. Local surface routes include the 80B Queensway and the 76B Royal York South buses stopping at Newcastle and Windsor. Cycling connections would be expanded with new bi-directional lanes on both frontages, tying into the Royal York bike lane and the broader Mimico-Judson network.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188030.jpg\" data-entity-uuid=\"insert-display_default-6b4ad61d-7135-43f2-85f7-ee465362ab6e\" data-entity-type=\"file\" alt=\"39 Newcastle Street, Toronto, designed by TACT Architecture for Osmington Gerofsky Development Corp\" title=\"Looking east to the south-end podium of Phase 2, designed by TACT Architecture for Osmington Gerofsky Development Corp\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/08\/59330\/59330-188030.jpg', true, 'Looking east to the south-end podium of Phase 2, designed by TACT Architecture for Osmington Gerofsky Development Corp'); return false;\"><span class=\"image-description\">Looking east to the south-end podium of Phase 2, designed by TACT Architecture for Osmington Gerofsky Development Corp<\/span><\/p>\n<p dir=\"ltr\">Several major projects are advancing around the GO station. To the northeast, plans include a 25-storey tower at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/25-audley-street.41999\" target=\"_blank\">25 Audley Street<\/a> and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/grand-park-village.22118\" target=\"_blank\">Grand Park Village<\/a> with three towers ranging from 23 to 40 storeys. North of the site, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/21-31-windsor-street.53240\" target=\"_blank\">21\u201331 Windsor Street<\/a> is proposed with four towers from 7 to 46 storeys. Northwest, proposals include <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/halsa.54047\" target=\"_blank\">H\u00e4lsa<\/a> at 8 storeys, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/430-royal-york.47207\" target=\"_blank\">430 Royal York<\/a> at 9 storeys, and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/464-royal-york-road.55399\" target=\"_blank\">464 Royal York<\/a> at 12 storeys, while to the west, the <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/royal-art-collection-etobicoke.45961\" target=\"_blank\">Royal Art Collection Etobicoke<\/a> is proposed at 11 storeys. Southwest, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/327-royal-york-road.8778\" target=\"_blank\">327 Royal York Road<\/a> is planned at 51 and 55 storeys.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<\/div>\n<div class=\"articles\" id=\"articles\">\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/more-content.png?14728329478\" onclick=\"loadArticles();\" alt=\"-\"><\/p><\/div>\n<\/div>\n<\/td>\n<td class=\"trending-column\" style=\"display: none;\" id=\"trending_block\"\/>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/08\/three-tower-rental-community-proposed-beside-mimico-go.59330\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] DEVELOPMENT\u00a0PLANNINGAugust 29, 2025 by Anthony Teles\u00a0\u00a0\u00a058\u00a0 Three-Tower Rental Community Proposed Beside Mimico GO A change of ownership following the &#8230; <a title=\"Three-Tower Rental Community Proposed Beside Mimico GO\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/three-tower-rental-community-proposed-beside-mimico-go\/\" aria-label=\"Read more about Three-Tower Rental Community Proposed Beside Mimico GO\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-32064","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32064","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32064"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32064\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}