{"id":32175,"date":"2025-09-05T22:06:46","date_gmt":"2025-09-06T05:06:46","guid":{"rendered":"https:\/\/essential.construction\/news\/crane-installed-as-bayview-village-north-block-construction-advances\/"},"modified":"2025-09-05T22:06:46","modified_gmt":"2025-09-06T05:06:46","slug":"crane-installed-as-bayview-village-north-block-construction-advances","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/crane-installed-as-bayview-village-north-block-construction-advances\/","title":{"rendered":"Crane Installed as Bayview Village North Block Construction Advances"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>A crane has now been installed on the <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/bayview-village-north-block.58124\" target=\"_blank\">North Block development site<\/a> at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/quadreal-property-group.28215\" target=\"_blank\">QuadReal Property Group<\/a>&#8216;s Bayview Village Shopping Centre in North York. The crane will be used in the erection of a 21-storey residential tower designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/giannone-petricone-associates.7995\" target=\"_blank\">Giannone Petricone Associates<\/a> with <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/turner-fleischer-architects.8071\" target=\"_blank\">Turner Fleischer<\/a> as Architect of Record. The tower is part of a larger redevelopment of the north surface parking areas at the Sheppard and Bayview site, and will be joined by a pair of 8-storey mid-rises to the west and a new single-storey retail shopping street component.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188198.jpg\" data-entity-uuid=\"insert-display_default-5813fcda-7c46-4752-a716-7af5b10d9aa3\" data-entity-type=\"file\" alt=\"Bayview Village North Block, Toronto, designed by Giannone Petricone Associates and Turner Fleischer for QuadReal Property Group\" title=\"Looking southwest to Bayview Village North Block, designed by Giannone Petricone Associates and Turner Fleischer for QuadReal Property Group\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188198.jpg', true, 'Looking southwest to Bayview Village North Block, designed by Giannone Petricone Associates and Turner Fleischer for QuadReal Property Group'); return false;\"><span class=\"image-description\">Looking southwest to Bayview Village North Block, designed by Giannone Petricone Associates and Turner Fleischer for QuadReal Property Group<\/span><\/p>\n<p dir=\"ltr\">Drilling rigs were positioned along the north edge of the site as of this westward looking photo from March, 2025, driving soldier piles into place to start the shoring system. In the foreground, prefabricated cylindrical rebar cages are staged. Mounds of earth line the site from ongoing excavation, with the mall complex and Loblaws signage visible behind.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188192.JPG\" data-entity-uuid=\"insert-display_default-4c1ba363-22ff-464d-a778-c6249df6d168\" data-entity-type=\"file\" alt=\"Bayview Village North Block, Toronto, designed by Giannone Petricone Associates and Turner Fleischer for QuadReal Property Group\" title=\"Looking west to shoring rigs and rebar cages onsite, image by Ed Skira\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188192.JPG', true, 'Looking west to shoring rigs and rebar cages onsite, image by Ed Skira'); return false;\"><span class=\"image-description\">Looking west to shoring rigs and rebar cages onsite, image by Ed Skira<\/span><\/p>\n<p dir=\"ltr\">Looking to the southeast later that month, excavation had advanced with a fleet of heavy equipment staged across the pit floor. Tracked excavators are parked, including one arm fitted with a drill. Shoring rigs remain in place along the mall-facing edge. Behind them, the retail windows are wrapped in protective sheathing, with store signage temporarily covered.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188193.jpg\" data-entity-uuid=\"insert-display_default-6fcbf56a-d08f-431d-ac06-52b66425cb8b\" data-entity-type=\"file\" alt=\"Bayview Village North Block, Toronto, designed by Giannone Petricone Associates and Turner Fleischer for QuadReal Property Group\" title=\"Looking east to excavators parked onsite and the existing mall structure in the background, image by UrbanToronto Forum contributor flonicky\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188193.jpg', true, 'Looking east to excavators parked onsite and the existing mall structure in the background, image by UrbanToronto Forum contributor flonicky'); return false;\"><span class=\"image-description\">Looking east to excavators parked onsite and the existing mall structure in the background, image by UrbanToronto Forum contributor flonicky<\/span><\/p>\n<p dir=\"ltr\">By June, 2025, excavation had exposed the shopping centre\u2019s foundation wall, now covered with weatherproofing. Excavation at the west end of the site is nearing full depth for the three-level underground garage. A row of tiebacks can be seen along the concrete lagging walls, inserted into the groudn behind to secure the walls. Excavators continue to remove soil down to final grade, while stockpiled earth remains on the east side, marking the sections still to be brought down to subgrade.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188196.jpeg\" data-entity-uuid=\"insert-display_default-3451b068-2b67-4ed3-ae4f-a16499adc25f\" data-entity-type=\"file\" alt=\"Bayview Village North Block, Toronto, designed by Giannone Petricone Associates and Turner Fleischer for QuadReal Property Group\" title=\"Excavation progress looking southwest, image by UrbanToronto Forum contributor LukaMilo8\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188196.jpeg', true, 'Excavation progress looking southwest, image by UrbanToronto Forum contributor LukaMilo8'); return false;\"><span class=\"image-description\">Excavation progress looking southwest, image by UrbanToronto Forum contributor LukaMilo8<\/span><\/p>\n<p dir=\"ltr\">One month later, excavation is seen advanced to multiple levels, with paths cut into the pit to allow machinery access between grade, mid-level staging, and the current subgrade depth. Excavators are active across tiers, continuing bulk earth removal toward the three-level underground structure. Protective fencing and temporary utilities run at grade.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188194.JPG\" data-entity-uuid=\"insert-display_default-6bfd92af-19ed-4bf0-92fc-33bfb8f3c2d7\" data-entity-type=\"file\" alt=\"Bayview Village North Block, Toronto, designed by Giannone Petricone Associates and Turner Fleischer for QuadReal Property Group\" title=\"Dirt paths in the excavation, viewed from the northwest corner, image by Ed Skira\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188194.JPG', true, 'Dirt paths in the excavation, viewed from the northwest corner, image by Ed Skira'); return false;\"><span class=\"image-description\">Dirt paths in the excavation, viewed from the northwest corner, image by Ed Skira<\/span><\/p>\n<p dir=\"ltr\">In August, 2025, the first \u00a0crane was erected at the east end of the site, seen below early this month,\u00a0to serve the forthcoming 21-storey tower build. At grade, bundles of reinforcing steel and stacked lumber are staged for use in forming the underground structure, while the waterproofed mall wall and completed shoring system frame the excavation. The crane\u2019s installation marks the transition from excavation to substructure work, enabling vertical construction to begin in the months ahead.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188197.JPG\" data-entity-uuid=\"insert-display_default-a4eb2ee5-afb8-4dc4-b55d-93bc16721e78\" data-entity-type=\"file\" alt=\"Bayview Village North Block, Toronto, designed by Giannone Petricone Associates and Turner Fleischer for QuadReal Property Group\" title=\"Tower crane installed at the northeast end for the high-rise tower, image by Ed Skira\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59373\/59373-188197.JPG', true, 'Tower crane installed at the northeast end for the high-rise tower, image by Ed Skira'); return false;\"><span class=\"image-description\">Tower crane installed at the northeast end for the high-rise tower, image by Ed Skira<\/span><\/p>\n<p dir=\"ltr\">With the first tower underway, attention will soon shift to the neighbouring mid-rises on the North Block, bringing retail-lined frontages and additional housing to the site. The North Block will ultimately deliver mid-rises rising 29.62m and the high-rise at 72.56m, introducing 430 condominium units and 14 affordable rental homes.<\/p>\n<p dir=\"ltr\">Beyond this phase, the <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/bayview-village-south-block.28121\" target=\"_blank\">South Block<\/a> proposes twin towers of 30 and 31 storeys alongside Bayview subway station and next to a five-storey <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/bayview-village-shopping-centre-parkade.49413\" target=\"_blank\">parkade<\/a>, expanding the redevelopment across the Sheppard Avenue frontage.\u00a0<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/09\/crane-installed-bayview-village-north-block-construction-advances.59373\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] A crane has now been installed on the North Block development site at QuadReal Property Group&#8216;s Bayview Village Shopping &#8230; <a title=\"Crane Installed as Bayview Village North Block Construction Advances\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/crane-installed-as-bayview-village-north-block-construction-advances\/\" aria-label=\"Read more about Crane Installed as Bayview Village North Block Construction Advances\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-32175","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32175","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32175"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32175\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32175"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32175"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}