{"id":32210,"date":"2025-09-08T10:08:58","date_gmt":"2025-09-08T17:08:58","guid":{"rendered":"https:\/\/essential.construction\/news\/manchesters-red-bank-set-for-43-storey-landmark-tower\/"},"modified":"2025-09-08T10:08:58","modified_gmt":"2025-09-08T17:08:58","slug":"manchesters-red-bank-set-for-43-storey-landmark-tower","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/manchesters-red-bank-set-for-43-storey-landmark-tower\/","title":{"rendered":"Manchester\u2019s Red Bank set for 43-storey landmark tower"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-501235\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p data-start=\"450\" data-end=\"606\">The 50\u201354 Red Bank scheme will deliver 509 flats, with shared amenities, landscaped outdoor areas and sweeping city views.<\/p>\n<p data-start=\"608\" data-end=\"861\">At street level, the plans include commercial units to complement the thriving Red Bank arches and more than 2,000 sq m of public space linking to the historic viaduct.<\/p>\n<p data-start=\"608\" data-end=\"861\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-09-08-at-15.06.31.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-501236\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-09-08-at-15.06.31.png\" alt=\"-\" width=\"1812\" height=\"998\"><\/a><\/p>\n<p data-start=\"863\" data-end=\"1026\">Two planning applications will be submitted once public consultation is finished, one for the towers and surrounding public realm, and another to progress wider access improvements to the viaduct.<\/p>\n<p data-start=\"1028\" data-end=\"1098\">Current occupier GRUB will relocate to make way for the development.<\/p>\n<p data-start=\"1100\" data-end=\"1289\">A spokesperson for the project team said: \u201cThese proposals bring forward much-needed homes, alongside new public space and active ground floor uses that will add to the life of the area.\u201d<\/p>\n<p data-start=\"1100\" data-end=\"1289\">\u201cRed Bank is fast becoming a creative and vibrant part of Manchester, and our vision is to build on this character to create a distinctive new neighbourhood.\u201d<\/p>\n<p data-start=\"1291\" data-end=\"1606\">The plans align with Manchester City Council\u2019s Northern Gateway Strategic Regeneration Framework, which aims to deliver 15,000 homes over the next 10\u201315 years.<\/p>\n<p data-start=\"1291\" data-end=\"1606\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-09-08-at-15.05.52.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-501238\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-09-08-at-15.05.52.png\" alt=\"-\" width=\"1156\" height=\"804\"><\/a><\/p>\n<p data-start=\"1291\" data-end=\"1606\">Designed to be largely car-free, the development will feature cycle parking, pedestrian links, and low-carbon technologies such as air source heat pumps.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/09\/08\/manchesters-red-bank-set-for-43-storey-landmark-tower\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The 50\u201354 Red Bank scheme will deliver 509 flats, with shared amenities, landscaped outdoor areas and sweeping city views. &#8230; <a title=\"Manchester\u2019s Red Bank set for 43-storey landmark tower\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/manchesters-red-bank-set-for-43-storey-landmark-tower\/\" aria-label=\"Read more about Manchester\u2019s Red Bank set for 43-storey landmark tower\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-32210","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32210","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32210"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32210\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}