{"id":32275,"date":"2025-09-12T10:16:37","date_gmt":"2025-09-12T17:16:37","guid":{"rendered":"https:\/\/essential.construction\/news\/200m-trafford-wharf-scheme-gets-all-clear\/"},"modified":"2025-09-12T10:16:37","modified_gmt":"2025-09-12T17:16:37","slug":"200m-trafford-wharf-scheme-gets-all-clear","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/200m-trafford-wharf-scheme-gets-all-clear\/","title":{"rendered":"\u00a3200m Trafford Wharf scheme gets all clear"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-501399\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p data-start=\"384\" data-end=\"613\">The two-acre plot will see the delivery of two build-to-rent towers rising 17 and 23 storeys, containing 382 flats. A third 6\u20138 storey U-shaped block will provide student housing with 419 beds.<\/p>\n<p data-start=\"384\" data-end=\"613\">A new 24,100 sq ft academic facility is also part of the mix.<\/p>\n<p data-start=\"384\" data-end=\"613\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-09-12-at-15.18.21.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-501403\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-09-12-at-15.18.21.png\" alt=\"-\" width=\"958\" height=\"640\"><\/a><\/p>\n<p data-start=\"615\" data-end=\"789\">Designed by Chapman Taylor, the development sits within Trafford Council\u2019s Wharfside regeneration zone, earmarked for up to 5,000 homes and a new Manchester United stadium.<\/p>\n<p data-start=\"791\" data-end=\"1002\">Simon Gallanders, managing director of Cole Waterhouse residential, said the project will transform a brownfield site into a thriving new community while helping to ease Trafford\u2019s affordable housing shortage.<\/p>\n<p data-start=\"791\" data-end=\"1002\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-09-12-at-15.03.22.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-501401\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-09-12-at-15.03.22.png\" alt=\"-\" width=\"1342\" height=\"912\"><\/a><\/p>\n<p data-start=\"1004\" data-end=\"1161\"><strong data-start=\"1004\" data-end=\"1020\">Project team<\/strong>: TSA Riley (project manager), Russell Bolton Consulting (QS\/cost consultant), XO Square (structural engineers), Watt WECE (M&amp;E engineers).<\/p>\n<div id=\"attachment_501400\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-09-12-at-15.03.38.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-501400 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2025-09-12-at-15.03.38.png\" alt=\"-\" width=\"1716\" height=\"780\"><\/a><\/p>\n<p class=\"wp-caption-text\">Academic facilities<\/p>\n<\/div><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/09\/12\/200m-trafford-wharf-scheme-gets-all-clear\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The two-acre plot will see the delivery of two build-to-rent towers rising 17 and 23 storeys, containing 382 flats. &#8230; <a title=\"\u00a3200m Trafford Wharf scheme gets all clear\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/200m-trafford-wharf-scheme-gets-all-clear\/\" aria-label=\"Read more about \u00a3200m Trafford Wharf scheme gets all clear\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-32275","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32275","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32275"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32275\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32275"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32275"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}