{"id":32334,"date":"2025-09-16T09:55:23","date_gmt":"2025-09-16T16:55:23","guid":{"rendered":"https:\/\/essential.construction\/news\/permits-paint-a-flat-picture-in-july\/"},"modified":"2025-09-16T09:55:23","modified_gmt":"2025-09-16T16:55:23","slug":"permits-paint-a-flat-picture-in-july","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/permits-paint-a-flat-picture-in-july\/","title":{"rendered":"Permits paint a flat picture in July"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<p>The value of issued building permits saw July gains and losses offset each other to limit erosion to a tenth of a per cent compared to June, says Statistics Canada.<\/p>\n<div>\n<div id=\"attachment_1003986051\" style=\"width: 274px\" class=\"wp-caption alignright\"><a rel=\"magnific nofollow noopener\" href=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/09\/g250912a001-eng.png\" target=\"_blank\"><img fetchpriority=\"high\" decoding=\"async\" aria-describedby=\"caption-attachment-1003986051\" class=\"size-medium wp-image-1003986051\" src=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/09\/g250912a001-eng-264x300.png\" alt=\"Change in building permit values, by percentage and segment, in July of 2025. \" width=\"264\" height=\"300\" srcset=\"https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/09\/g250912a001-eng-264x300.png 264w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/09\/g250912a001-eng-176x200.png 176w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/09\/g250912a001-eng-353x400.png 353w, https:\/\/www.on-sitemag.com\/wp-content\/uploads\/2025\/09\/g250912a001-eng.png 639w\" sizes=\"(max-width: 264px) 100vw, 264px\" data-mwl-img-id=\"1003986051\"\/><\/a><\/p>\n<p id=\"caption-attachment-1003986051\" class=\"wp-caption-text\">Change in building permit values, by percentage and segment, in July of 2025. (Source: Statistics Canada, Table\u00a034-10-0292-01, Building permits, by type of building and type of work.)<\/p>\n<\/div>\n<p style=\"font-weight: 400;\">A mixed picture between the residential and non-residential sectors resulting in a relatively flat July for building permits, reports Statistics Canada. The total value of building permits issued across the country edged down a mere $10.8 million, or a tenth of one per cent, to $11.9 billion compared to June. A $279.2 million decrease in construction intentions in the non-residential sector was largely offset by a $268.3 million rise in the residential sector.<\/p>\n<p style=\"font-weight: 400;\">Within the non-residential sector, a decrease in industrial and institutional construction intentions led to a decline as permits came in at $4.6 billion for the month.<\/p>\n<p style=\"font-weight: 400;\">By segment, the industrial component fell 23.3 per cent to $835 million, coming in $252.9 million lower than June, as Ontario and Quebec were both off by more than $100 million compared to the prior month. After seeing a boost from hospital construction intentions in Alberta in June, the institutional segment found itself $196 million lower in July, coming in at $1.4 billion. The commercial component found its way to a 7.9 per cent increase, to reduce overall ICI softening. That segment posted in with a value of $2.3 billion in July.<\/p>\n<p style=\"font-weight: 400;\">The residential sector has been on a downward trend since January, but a healthy gain in Ontario had residential construction intentions rising in July, outpacing June by $268.3 million to reach $7.3 billion.<\/p>\n<p style=\"font-weight: 400;\">Within those results, the single-family component increased $143.5 million to $2.6 billion with seven provinces and three territories contributing to the increase. The multi-unit component also grew, gaining $124.8 million over June to reach $4.7 billion. This was again driven by Ontario, which saw the Toronto census metropolitan area increase by $329.5 million over the June results.<\/p>\n<p style=\"font-weight: 400;\">Nationwide, a total of 20,000 multi-unit dwellings and 4,100 single-family dwellings were authorized in July, up 1.9 per cent from the previous month.<\/p>\n<p style=\"font-weight: 400;\"><a rel=\"noopener nofollow\" href=\"http:\/\/www.statcan.gc.ca\/\" target=\"_blank\">www.statcan.gc.ca<\/a><\/p>\n<\/div>\n<p><script>(function(d, s, id) {\n\t  var js, fjs = d.getElementsByTagName(s)[0];\n\t  if (d.getElementById(id)) return;\n\t  js = d.createElement(s); js.id = id;\n\t  js.src = \"\/\/connect.facebook.net\/en_US\/sdk.js#xfbml=1&appId=761779333850340&version=v2.0\";\n\t  fjs.parentNode.insertBefore(js, fjs);\n\t}(document, 'script', 'facebook-jssdk'));<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.on-sitemag.com\/construction\/permits-paint-a-flat-picture-in-july\/1003986050\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The value of issued building permits saw July gains and losses offset each other to limit erosion to a &#8230; <a title=\"Permits paint a flat picture in July\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/permits-paint-a-flat-picture-in-july\/\" aria-label=\"Read more about Permits paint a flat picture in July\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1085],"tags":[],"class_list":["post-32334","post","type-post","status-publish","format-standard","hentry","category-onsite-magazine","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32334","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32334"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32334\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32334"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32334"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}