{"id":32352,"date":"2025-09-17T10:28:37","date_gmt":"2025-09-17T17:28:37","guid":{"rendered":"https:\/\/essential.construction\/news\/major-work-underway-on-scarborough-centre-station\/"},"modified":"2025-09-17T10:28:37","modified_gmt":"2025-09-17T17:28:37","slug":"major-work-underway-on-scarborough-centre-station","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/major-work-underway-on-scarborough-centre-station\/","title":{"rendered":"Major Work Underway on Scarborough Centre Station"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<td class=\"layout-content\">\n<div class=\"content\" style=\"&#9;visibility: hidden;\" id=\"content\">\n<div class=\"article-top\">\n<div class=\"content-info\"><span class=\"article-category\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/infrastructure\" target=\"_blank\">INFRASTRUCTURE<\/a><\/span>\u00a0<span class=\"article-subcategory\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/!\/transportation\" target=\"_blank\">TRANSPORTATION<\/a><\/span><br \/><span id=\"article_info\">September 17, 2025 <span class=\"article-author\">by Nolan Xuereb<\/span><\/span>\u00a0\u00a0<span class=\"content-views\"><img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/views.png?14728329481\" alt=\"-\">\u00a0190\u00a0<\/span><\/div>\n<p><span id=\"article_title\">Major Work Underway on Scarborough Centre Station<\/span><\/p>\n<\/div>\n<div class=\"article-content\" id=\"article_content\">\n<div class=\"article-body\" id=\"article_body\">\n<p>The expansion of rapid transit in Toronto&#8217;s eastern (former) borough of Scarborough reached a significant milestone on September 5 when major work started on <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/bloor-danforth-line-2-scarborough-centre-station.33835\" target=\"_blank\">Scarborough Centre station<\/a>, the first of three new subway stations under construction on a <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/bloor-danforth-line-2-scarborough-subway-extension.58526\" target=\"_blank\">7.8 km extension of Danforth Line 2<\/a> to the north and east of the current terminus at Kennedy Road. This marks the first expansion of the cross-city Bloor-Danforth subway line since Kipling and Kennedy stations opened in 1980, nearly half a century ago. The new tracks will run primarily under Danforth Road and McCowan Road, replacing the service formerly provided by the now-defunct Scarborough RT.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188535.jpg\" data-entity-uuid=\"insert-display_default-c69e5f50-0acf-4c5f-8d9b-3161a5a054e3\" data-entity-type=\"file\" alt=\"Scarborough, Scarborough Subway Extension, Scarborough City Centre Station, Line 2 Danforth, Metrolinx\" title=\"An interior rendering of the under construction Scarborough Centre station, image courtesy of Metrolinx\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188535.jpg', true, 'An interior rendering of the under construction Scarborough Centre station, image courtesy of Metrolinx'); return false;\"><span class=\"image-description\">An interior rendering of the under construction Scarborough Centre station, image courtesy of Metrolinx<\/span><\/p>\n<p>Amid towering cranes and excavators, dozens of representatives from the construction industry, the Province of Ontario, and the City of Toronto gathered as Mayor Chow and Premier Ford announced the start of work on Scarborough Centre station. Located east of the Scarborough Town Centre shopping mall, surrounded by vast parking lots and residential high-rises, the announcement signalled a new era for Toronto\u2019s most suburban former borough.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188533.jpeg\" data-entity-uuid=\"insert-display_default-0a0e4fc8-862b-4120-874b-4dda6351a639\" data-entity-type=\"file\" alt=\"Scarborough, Scarborough Subway Extension, Scarborough City Centre Station, Line 2 Danforth, Metrolinx\" title=\"Premier Ford and Mayor Chow, along with other politicians and representatives of the construction industry, pose at the future site of Scarborough Centre station, image courtesy of Michael Thompson\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188533.jpeg', true, 'Premier Ford and Mayor Chow, along with other politicians and representatives of the construction industry, pose at the future site of Scarborough Centre station, image courtesy of Michael Thompson'); return false;\"><span class=\"image-description\">Premier Ford and Mayor Chow, along with other politicians and representatives of the construction industry, pose at the future site of Scarborough Centre station, image courtesy of Michael Thompson<\/span><\/p>\n<p>The question of how to deliver higher-order transit to Scarborough was among Toronto\u2019s most contentious political debates of the 2010s. On one side were advocates of \u201cSubways, Subways, Subways,\u201d led most prominently by the late Rob Ford, then mayor of Toronto (and brother of current Premier Doug Ford), who supported extending Danforth Line 2 to Scarborough Town Centre. In opposition were mostly progressive members of City Council, who backed &#8216;Transit City,&#8217; a light rail network envisioned by Ford\u2019s predecessor, David Miller. Within that plan, several options were floated to serve Scarborough Town Centre directly, some proposing to extend <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/eglinton-line-5.47725\" target=\"_blank\">Eglinton Line 5 <\/a>along the Scarborough RT\u2019s right-of-way, others calling for a full rehabilitation and extension of the now-defunct &#8216;medium-capacity rapid transit&#8217; line.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188537.jpg\" data-entity-uuid=\"insert-display_default-254e9bf4-d119-494a-bfa6-b0e98ad70c3c\" data-entity-type=\"file\" alt=\"David Miller, Transit City, LRT, Subway, Rob Ford\" title=\"A map of David Miller's proposed LRT plan, known as &quot;Transit City&quot;, image courtesy of the City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188537.jpg', true, 'A map of David Miller's proposed LRT plan, known as &quot;Transit City&quot;, image courtesy of the City of Toronto'); return false;\"><span class=\"image-description\">A map of David Miller&#8217;s proposed LRT plan, known as &#8220;Transit City&#8221;, image courtesy of the City of Toronto<\/span><\/p>\n<p>After years of debate, a patchwork transit build-out\u2014part subway, part LRT\u2014ultimately took shape. On Eglinton and Finch West, Miller\u2019s vision of extending streetcar-style transit into the suburbs materialized, promoted as a faster and more affordable alternative to new subway construction. Yet, nearly two decades after Transit City was first announced, neither line has had an opening date announced, even as questions are already being raised about whether the Eglinton LRT will have sufficient capacity on day one of service.<\/p>\n<p>Although Rob Ford did not seek re-election after his turbulent single term as mayor due to health issues, Premier Doug Ford has since carried forward much of his vision for subway expansion. The fully tunnelled <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/eglinton-line-5-crosstown-west-extension.47679\" target=\"_blank\">extension of Eglinton Line 5 through Etobicoke<\/a>, the replacement of the proposed Don Mills LRT with <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/ontario-line-3.47842\" target=\"_blank\">Ontario Line 3<\/a>, and the extension of Danforth Line 2 to Scarborough Town Centre all stem from the subway expansion agenda championed by the Fords in the 2010s.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188539.jpg\" data-entity-uuid=\"insert-display_default-b34de11d-ce25-4ffe-a100-e97684bdce15\" data-entity-type=\"file\" alt=\"David Miller, Transit City, LRT, Subway, Rob Ford\" title=\"The Greater Toronto Area's rapid transit expansion plans as of November 2024, image courtesy of the Ontario Ministry of Transportation\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188539.jpg', true, 'The Greater Toronto Area's rapid transit expansion plans as of November 2024, image courtesy of the Ontario Ministry of Transportation'); return false;\"><span class=\"image-description\">The Greater Toronto Area&#8217;s rapid transit expansion plans as of November 2024, image courtesy of the Ontario Ministry of Transportation<\/span><\/p>\n<p>Initial plans would have seen the station box and bus terminal stretch across the southern face of Scarborough Town Centre, similar to the current bus hubs configuration. However, recent revisions have shifted the station site to the east of McCowan Road, and it will now span nearly an entire city block between Progress Avenue and Bushby Drive on a currently vacant lot. With the exception of two renderings of the interior of the station, no new renderings have been provided to inform the public of what this new station will look like on opening day.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188634.jpg\" data-entity-uuid=\"insert-display_default-fd730fe3-7615-4860-b673-9eb9d019a755\" data-entity-type=\"file\" alt=\"Scarborough, Scarborough Subway Extension, Scarborough City Centre Station, Line 2 Danforth, Metrolinx\" title=\"A diagram displaying the revised location of Scarborough Centre station and its bus terminal, image courtesy of Metrolinx\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188634.jpg', true, 'A diagram displaying the revised location of Scarborough Centre station and its bus terminal, image courtesy of Metrolinx'); return false;\"><span class=\"image-description\">A diagram displaying the revised location of Scarborough Centre station and its bus terminal, image courtesy of Metrolinx<\/span><\/p>\n<p>The future Scarborough Centre station will serve as a true multimodal transit hub, as even with the subway extension in place, most local service will continue to be delivered by bus. TTC routes from across Scarborough will keep converging on the station, while plans for expanded regional bus connections aim to strengthen Scarborough Town Centre\u2019s role as a gateway for the wider GTA. GO Transit already operates several region-spanning bus routes through Scarborough Centre station, using the relatively uncongested Highway 407 as a high-speed corridor to connect suburban hubs and post-secondary institutions across the GTA. Service on these routes has grown steadily in response to strong ridership demand, and the arrival of subway service will likely drive even greater demand for connections to Scarborough Town Centre.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188540.jpg\" data-entity-uuid=\"insert-display_default-a333577a-7876-4dda-9c7e-edb6035f7dc7\" data-entity-type=\"file\" alt=\"Scarborough, Scarborough Subway Extension, Scarborough City Centre Station, Line 2 Danforth, Metrolinx\" title=\"Passengers wait at the existing Scarborough Centre station bus loop, image courtesy of the TTC\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188540.jpg', true, 'Passengers wait at the existing Scarborough Centre station bus loop, image courtesy of the TTC'); return false;\"><span class=\"image-description\">Passengers wait at the existing Scarborough Centre station bus loop, image courtesy of the TTC<\/span><\/p>\n<p>The first new transit service expected to reach Scarborough Town Centre, aside from the subway extension, will be the Durham\u2013Scarborough Bus Rapid Transit (BRT) line. Beginning at Scarborough Town Centre station, the rapid service will run in dedicated lanes along major arterials through Scarborough, Pickering, Ajax, and Whitby, before terminating at Simcoe Street in Oshawa. Although still in the planning phase, the Durham\u2013Scarborough BRT promises fast and reliable intercity travel across the eastern GTA once complete.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188541.jpeg\" data-entity-uuid=\"insert-display_default-b26d73ea-bcc7-4591-a7a4-d14c3311f6c6\" data-entity-type=\"file\" alt=\"Scarborough, Scarborough Subway Extension, Scarborough City Centre Station, Line 2 Danforth, Metrolinx\" title=\"A rendering of the planned Durham - Scarborough BRT, featuring a dedicated bus right-of-way, image courtesy of Metrolinx\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188541.jpeg', true, 'A rendering of the planned Durham - Scarborough BRT, featuring a dedicated bus right-of-way, image courtesy of Metrolinx'); return false;\"><span class=\"image-description\">A rendering of the planned Durham &#8211; Scarborough BRT, featuring a dedicated bus right-of-way, image courtesy of Metrolinx<\/span><\/p>\n<p>For riders traveling to Toronto\u2019s downtown core, the projected time savings are significant. In its <em>Scarborough Subway Extension Preliminary Design Business Case<\/em>, published in February 2020, Metrolinx estimated that a trip from Scarborough Centre to Bloor\u2013Yonge would take just 36 minutes, down from the current 55 minutes cited in the report. Notably, these figures have not been publicized on Metrolinx\u2019s project page, which does not provide specific details on time savings or overall trip length.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188635.jpeg\" data-entity-uuid=\"insert-display_default-e064cfdd-83f8-40bb-8ef4-c57a2403f514\" data-entity-type=\"file\" alt=\"Scarborough, Scarborough Subway Extension, Scarborough City Centre Station, Line 2 Danforth, Metrolinx\" title=\"An interior rendering of the under construction Scarborough Centre station, image courtesy of Metrolinx\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59431\/59431-188635.jpeg', true, 'An interior rendering of the under construction Scarborough Centre station, image courtesy of Metrolinx'); return false;\"><span class=\"image-description\">An interior rendering of the under construction Scarborough Centre station, image courtesy of Metrolinx<\/span><\/p>\n<p>Years of work still remain before direct subway service reaches the heart of Scarborough, with completion expected in the mid-2030s. Once finished, however, the project will provide enhanced mobility and better integrate Toronto\u2019s under-served eastern borough into the rest of the city.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/adamson-associates-architects.7951\" target=\"_blank\">Adamson Associates Architects<\/a><\/td>\n<\/tr>\n<\/table>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<\/div>\n<div class=\"articles\" id=\"articles\">\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/more-content.png?14728329481\" onclick=\"loadArticles();\" alt=\"-\"><\/p><\/div>\n<\/div>\n<\/td>\n<td class=\"trending-column\" style=\"display: none;\" id=\"trending_block\"\/>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/09\/major-work-underway-scarborough-centre-station.59431\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] INFRASTRUCTURE\u00a0TRANSPORTATIONSeptember 17, 2025 by Nolan Xuereb\u00a0\u00a0\u00a0190\u00a0 Major Work Underway on Scarborough Centre Station The expansion of rapid transit in &#8230; <a title=\"Major Work Underway on Scarborough Centre Station\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/major-work-underway-on-scarborough-centre-station\/\" aria-label=\"Read more about Major Work Underway on Scarborough Centre Station\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-32352","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32352","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32352"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32352\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32352"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32352"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32352"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}