{"id":32426,"date":"2025-09-21T22:36:16","date_gmt":"2025-09-22T05:36:16","guid":{"rendered":"https:\/\/essential.construction\/news\/green-light-for-2-2bn-gatwick-airport-second-runway\/"},"modified":"2025-09-21T22:36:16","modified_gmt":"2025-09-22T05:36:16","slug":"green-light-for-2-2bn-gatwick-airport-second-runway","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/green-light-for-2-2bn-gatwick-airport-second-runway\/","title":{"rendered":"Green light for \u00a32.2bn Gatwick Airport second runway"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-501620\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p style=\"text-align: left;\">Heidi Alexander, transport secretary, approved the scheme with conditions on noise abatement and public transport provision.<\/p>\n<p>Gatwick Airport said the project is privately financed, requiring no taxpayer money, and is shovel-ready.<\/p>\n<p>The proposed plans would involve shifting the airport\u2019s emergency northern runway sideways by 12m and upgrading it for regular short-haul use.<\/p>\n<p>This change would allow for simultaneous operations on both runways while ensuring compliance with international safety standards.<\/p>\n<p>Other aspects of the proposal include new buildings and extensions at both North and South Terminals.<\/p>\n<p>Plans also include enhancements to airport access, improvements to surrounding highways, and additional environmental mitigation measures.<\/p>\n<p><iframe loading=\"lazy\" title=\"vimeo-player\" src=\"https:\/\/player.vimeo.com\/video\/852623277?h=892b161a17\" width=\"640\" height=\"360\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\" data-mce-fragment=\"1\"><\/iframe><\/p>\n<p>Up to 3,200 workers will be on site at peak construction.<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/09\/22\/green-light-for-2-2bn-gatwick-airport-second-runway\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Heidi Alexander, transport secretary, approved the scheme with conditions on noise abatement and public transport provision. Gatwick Airport said &#8230; <a title=\"Green light for \u00a32.2bn Gatwick Airport second runway\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/green-light-for-2-2bn-gatwick-airport-second-runway\/\" aria-label=\"Read more about Green light for \u00a32.2bn Gatwick Airport second runway\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-32426","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32426"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32426\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}