{"id":32448,"date":"2025-09-23T10:40:42","date_gmt":"2025-09-23T17:40:42","guid":{"rendered":"https:\/\/essential.construction\/news\/14-storeys-proposed-on-sheppard-west-in-lansing-westgate\/"},"modified":"2025-09-23T10:40:42","modified_gmt":"2025-09-23T17:40:42","slug":"14-storeys-proposed-on-sheppard-west-in-lansing-westgate","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/14-storeys-proposed-on-sheppard-west-in-lansing-westgate\/","title":{"rendered":"14 Storeys Proposed on Sheppard West in Lansing-Westgate"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>A 14-storey residential building has been proposed at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/283-sheppard-avenue-west.59420\" target=\"_blank\">283 Sheppard Avenue West<\/a> in Toronto\u2019s Lansing-Westgate neighbourhood, where <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/ott-properties-inc.46475\" target=\"_blank\">OTT Properties Inc<\/a> has submitted plans by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/raw-design.8045\" target=\"_blank\">RAW Design<\/a>. Located about midway between Bathurst and Yonge streets, the proposal contributes to the corridor\u2019s ongoing transformation, adding density in proximity to established low-rise housing, schools, parks, and a growing cluster of mid- and high-rise developments.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59488\/59488-188849.jpg\" data-entity-uuid=\"insert-display_default-25209392-9c85-4044-b68f-256091be933d\" data-entity-type=\"file\" alt=\"283 Sheppard Avenue West, Toronto, designed by RAW Design for OTT Developments\" title=\"Looking southeast to 283 Sheppard Avenue West, designed by RAW Design for OTT Developments\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59488\/59488-188849.jpg', true, 'Looking southeast to 283 Sheppard Avenue West, designed by RAW Design for OTT Developments'); return false;\"><span class=\"image-description\">Looking southeast to 283 Sheppard Avenue West, designed by RAW Design for OTT Developments<\/span><\/p>\n<p dir=\"ltr\">The 0.2ha site spans 283 through 297 Sheppard Avenue West, situated on the south side of the corridor between Senlac and Easton roads. The property is currently occupied by five single-detached houses with individual driveways. Sheppard Avenue West is lined with low-rise commercial and residential buildings, with low-rise homes immediately south. A mix of taller residential buildings is found approaching Bathurst and Yonge streets to the west and east.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59488\/59488-188850.jpg\" data-entity-uuid=\"insert-display_default-93ead35a-3395-4a73-9f5b-13c7b9bd17df\" data-entity-type=\"file\" alt=\"283 Sheppard Avenue West, Toronto, Google Maps\" title=\"Looking southwest to the current site, image retrieved from Google Maps\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59488\/59488-188850.jpg', true, 'Looking southwest to the current site, image retrieved from Google Maps'); return false;\"><span class=\"image-description\">Looking southwest to the current site, image retrieved from Google Maps<\/span><\/p>\n<p dir=\"ltr\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/mhbc-planning.24647\" target=\"_blank\">MHBC Planning<\/a> has submitted Official Plan and Zoning By-law Amendment applications to the City of Toronto on behalf of the developer. Rising 51.9m, the building would replace the existing houses with a single structure that aligns to Sheppard Avenue West through a podium-and-tower form. Step-backs and setbacks would transition toward the surrounding low-rise context.<\/p>\n<p dir=\"ltr\">The proposal calls for 139 units across a total Gross Floor Area of 9,596m\u00b2, producing a Floor Space Index of 7.8 times lot coverage. Vertical circulation would be served by two elevators, resulting in a ratio of about one per 70 units, indicating prompt response times. The residential mix would consist of 45 one-bedroom, 79 two-bedroom, and 15 three-bedroom apartments.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59488\/59488-188851.jpg\" data-entity-uuid=\"insert-display_default-2e932e04-4c5d-4813-898c-df7bba82cfab\" data-entity-type=\"file\" alt=\"Site plan, 283 Sheppard Avenue West, Toronto, designed by RAW Design for OTT Developments\" title=\"Site plan, designed by RAW Design for OTT Developments\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59488\/59488-188851.jpg', true, 'Site plan, designed by RAW Design for OTT Developments'); return false;\"><span class=\"image-description\">Site plan, designed by RAW Design for OTT Developments<\/span><\/p>\n<p dir=\"ltr\">Amenities entail 308m\u00b2 indoors and 248m\u00b2 outdoors for a combined total of 556m\u00b2. Indoor areas would be located on the ground and second floors, with outdoor spaces positioned at grade behind the building and integrated with landscaped areas. A further 200m\u00b2 of green roof space is proposed. Instead of dedicating on-site parkland to the City, the developer would make a cash-in-lieu contribution.<\/p>\n<p dir=\"ltr\">Vehicular parking would be accommodated in a single underground level and at grade, providing 19 spaces for residents and 9 for visitors, including three surface spaces. For cyclists, plans entail 90 long-term, 5 oversized long-term, and 10 short-term spaces.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59488\/59488-188852.jpg\" data-entity-uuid=\"insert-display_default-43942f7c-88d9-4577-90e0-6e008997f17c\" data-entity-type=\"file\" alt=\"Ground floor plan, 283 Sheppard Avenue West, Toronto, designed by RAW Design for OTT Developments\" title=\"Ground floor plan, designed by RAW Design for OTT Developments\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59488\/59488-188852.jpg', true, 'Ground floor plan, designed by RAW Design for OTT Developments'); return false;\"><span class=\"image-description\">Ground floor plan, designed by RAW Design for OTT Developments<\/span><\/p>\n<p dir=\"ltr\">TTC bus stops are located within 100m on both sides of Sheppard Avenue West. From there, riders can connect east to Sheppard-Yonge station, about 1.1km away or a 16-minute walk. Bathurst Street routes provide additional north\u2013south connections, while Metrolinx is studying a westward extension of Sheppard Line 4 that could add subway service to the west. For cyclists, Sheppard Avenue West includes dedicated bike lanes, supplemented by nearby multi-use trails through Earl Bales Park and along the Don River.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59488\/59488-188853.jpg\" data-entity-uuid=\"insert-display_default-a6257936-cbe2-4542-bb47-abf49112547d\" data-entity-type=\"file\" alt=\"Aerial view, 283 Sheppard Avenue West, Toronto\" title=\"An aerial view of the site and surrounding area, image from submission to City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/09\/59488\/59488-188853.jpg', true, 'An aerial view of the site and surrounding area, image from submission to City of Toronto'); return false;\"><span class=\"image-description\">An aerial view of the site and surrounding area, image from submission to City of Toronto<\/span><\/p>\n<p dir=\"ltr\">Intensification is already shaping the Sheppard West corridor. Just northeast of the site, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/290-sheppard-west.39660\" target=\"_blank\">290 Sheppard West<\/a> is planned at 6 storeys, while proposals at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/245-sheppard-west.22329\" target=\"_blank\">245<\/a> and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/234-sheppard-avenue-west.57410\" target=\"_blank\">234 Sheppard West<\/a> would each rise 11 storeys. Mid-rise proposals line the corridor eastward, and further east, construction is underway on the 18-storey <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/northcore-condos.27170\" target=\"_blank\">NorthCore Condos<\/a>. To the west, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/307-sheppard-west.46983\" target=\"_blank\">307 Sheppard West<\/a> is proposed at 9 storeys, while a major multi-tower community at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/325-bogert-avenue.24698\" target=\"_blank\">325 Bogert Avenue<\/a> envisions six buildings ranging from 21 to 27 storeys.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, that provides comprehensive data on development projects in the Greater Golden Horseshoe \u2014 from proposal through to completion. We also offer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b\u200b\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/09\/14-storeys-proposed-sheppard-west-lansing-westgate.59488\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] A 14-storey residential building has been proposed at 283 Sheppard Avenue West in Toronto\u2019s Lansing-Westgate neighbourhood, where OTT Properties &#8230; <a title=\"14 Storeys Proposed on Sheppard West in Lansing-Westgate\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/14-storeys-proposed-on-sheppard-west-in-lansing-westgate\/\" aria-label=\"Read more about 14 Storeys Proposed on Sheppard West in Lansing-Westgate\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-32448","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32448","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32448"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32448\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}