{"id":32472,"date":"2025-09-24T22:42:42","date_gmt":"2025-09-25T05:42:42","guid":{"rendered":"https:\/\/essential.construction\/news\/bottoming-out-ceremony-sees-historic-church-on-stilts\/"},"modified":"2025-09-24T22:42:42","modified_gmt":"2025-09-25T05:42:42","slug":"bottoming-out-ceremony-sees-historic-church-on-stilts","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/bottoming-out-ceremony-sees-historic-church-on-stilts\/","title":{"rendered":"\u201cBottoming-out\u201d ceremony sees historic church on stilts"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-501748\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>Innovative engineering at AXA IM Alts\u2019 Fifty Fenchurch Street development allows the Tower of All Hallows Staining Church to remain suspended above 60,000 sq ft of excavation following the removal of over 125,000 tonnes of earth and ground material.<\/p>\n<p>The bottoming-out of the scheme marked a significant construction milestone for the site which will be home to a 36-storey flagship development.<\/p>\n<div id=\"attachment_501749\" class=\"wp-caption alignnone\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/250923-50Fenchurch-%C2%A9-Owen-Billcliffe.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-501749\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/250923-50Fenchurch-%C2%A9-Owen-Billcliffe.jpg\" alt=\"-\" width=\"1067\" height=\"1600\"><\/a><\/p>\n<p class=\"wp-caption-text\">Photo by Owen Billcliffe \u2022 owenbphoto.com<\/p>\n<\/div>\n<p>YardNine is development delivery partner on the project with Arup as the lead engineering consultant and Multiplex Construction Europe as the main construction works contractor.<\/p>\n<p>John O\u2019Driscoll, Global co-Head of Real Estate at AXA IM Alts, said: \u201cIn addition to the uniqueness of being set below a 700-year-old church tower suspended on 45-foot tall stilts, this ceremony marked a major construction milestone for Fifty Fenchurch Street.<\/p>\n<p>\u201cFifty Fenchurch Street is a remarkable project, blending state-of-the-art, Grade A workspace with the site\u2019s rich historical features \u2013 a development that will set new benchmarks for years to come.\u201d<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/fifty-Fenchurch-credit-Miller-Hare-.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-501751\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/fifty-Fenchurch-credit-Miller-Hare-.jpg\" alt=\"-\" width=\"5952\" height=\"8329\"><\/a><\/p>\n<p><em>A CGI of the completed scheme<\/em><\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/3.jpg\" alt=\"Grant Prior\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/09\/24\/bottoming-out-ceremony-sees-historic-church-on-stilts\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Innovative engineering at AXA IM Alts\u2019 Fifty Fenchurch Street development allows the Tower of All Hallows Staining Church to &#8230; <a title=\"\u201cBottoming-out\u201d ceremony sees historic church on stilts\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/bottoming-out-ceremony-sees-historic-church-on-stilts\/\" aria-label=\"Read more about \u201cBottoming-out\u201d ceremony sees historic church on stilts\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-32472","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32472"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32472\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}