{"id":32512,"date":"2025-09-27T10:47:44","date_gmt":"2025-09-27T17:47:44","guid":{"rendered":"https:\/\/essential.construction\/news\/next-phase-of-651-homes-approved-at-barking-riverside\/"},"modified":"2025-09-27T10:47:44","modified_gmt":"2025-09-27T17:47:44","slug":"next-phase-of-651-homes-approved-at-barking-riverside","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/next-phase-of-651-homes-approved-at-barking-riverside\/","title":{"rendered":"Next phase of 651 homes approved at Barking Riverside"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-501810\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>Barking &amp; Dagenham Council\u2019s planning committee gave unanimous backing to the latest phase of the East London mega-scheme, which will be delivered in partnership with the Mayor of London through Barking Riverside Limited (BRL).<\/p>\n<p>The new plans cover 12 blocks ranging from four to 15 storeys on a site east of the future District Centre.<\/p>\n<p>Construction is due to start at plot 210 in April 2026, with work to be delivered by L&amp;Q\u2019s in-house construction team, which has already handed over 709 homes at Barking Riverside.<\/p>\n<p>Around 30% of the homes will be for social rent and 28% for London Living Rent, targeted at first-time buyers.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/12857421.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-501811\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/12857421.jpg\" alt=\"-\" width=\"607\" height=\"368\"><\/a><\/p>\n<p>Almost 70% of the homes are designed for families, with two- and three-bedroom flats making up the bulk of provision.<\/p>\n<p>The scheme, designed by GRID Architects with planning support from Savills, will also include over 2,000 sqm of communal amenity space, rain gardens, food growing areas, and green roofs.<\/p>\n<p>Walsh Group is structural engineer on the job with XCO2 Energy on board as M&amp;E engineer.<\/p>\n<p>The 20,000-home masterplan is backed by \u00a3124m of Homes England infrastructure funding and is one of the largest regeneration projects in Europe.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/09\/26\/next-phase-of-651-homes-approved-at-barking-riverside\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Barking &amp; Dagenham Council\u2019s planning committee gave unanimous backing to the latest phase of the East London mega-scheme, which &#8230; <a title=\"Next phase of 651 homes approved at Barking Riverside\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/next-phase-of-651-homes-approved-at-barking-riverside\/\" aria-label=\"Read more about Next phase of 651 homes approved at Barking Riverside\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-32512","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32512"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32512\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}