{"id":32527,"date":"2025-09-28T10:49:45","date_gmt":"2025-09-28T17:49:45","guid":{"rendered":"https:\/\/essential.construction\/news\/william-hare-wins-first-steelwork-order-for-sizewell-c\/"},"modified":"2025-09-28T10:49:45","modified_gmt":"2025-09-28T17:49:45","slug":"william-hare-wins-first-steelwork-order-for-sizewell-c","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/william-hare-wins-first-steelwork-order-for-sizewell-c\/","title":{"rendered":"William Hare wins first steelwork order for Sizewell C"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The deal will see over 500 tonnes of steel fabricated at the company\u2019s Scarborough plant in North Yorkshire before erection of a two-storey frame on the Suffolk coast.<\/p>\n<p>The amenity building will form the hub of Sizewell C\u2019s worker accommodation campus, supporting thousands of out-of-area staff during the decade-long build.<\/p>\n<p>William Hare brings more than 50 years of nuclear sector experience to the job, having worked extensively on Hinkley Point C since 2019.<\/p>\n<p>Fabrication work will start in October, with on-site installation expected before the end of 2025.<\/p>\n<p data-start=\"867\" data-end=\"967\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/www.eadt_.co_.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-497839\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/www.eadt_.co_.jpg\" alt=\"-\" width=\"620\" height=\"348\"><\/a><\/p>\n<p data-start=\"969\" data-end=\"1292\">Sizewell C joint managing director Nigel Cann said awarding the contract to a UK steel business was part of a pledge to ensure 70% of construction spend stays with domestic firms. \u201cThis is also great news for the North of England, where we\u2019ve already committed to investing \u00a32.5bn during the construction of our project.\u201d<\/p>\n<p data-start=\"1294\" data-end=\"1430\">The Scarborough facility \u2013 home to the UK\u2019s first fabrication robot \u2013 will deliver the bulk of the framework on a fast-track schedule.<\/p>\n<p>The latest contract award follows a construction management agreement with McLaren Construction will deliver the 2,400-bed campus for site workers, hailed as setting new standards in site accommodation.<\/p>\n<p>The scheme will see 16 residential blocks of three and four storeys built to house the incoming workforce.<\/p>\n<p>Each building will contain single-occupancy living units, each with its own ensuite, kitchenette, wardrobe, desk and TV.<\/p>\n<p>Every floor will house around 40 rooms accessed via a central corridor, with shared services cupboards providing hot water, power and waste distribution. Eight accessible rooms will be included in each three-storey block.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/09\/26\/william-hare-wins-first-steelwork-deal-for-sizewell-c\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The deal will see over 500 tonnes of steel fabricated at the company\u2019s Scarborough plant in North Yorkshire before &#8230; <a title=\"William Hare wins first steelwork order for Sizewell C\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/william-hare-wins-first-steelwork-order-for-sizewell-c\/\" aria-label=\"Read more about William Hare wins first steelwork order for Sizewell C\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-32527","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32527"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32527\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}