{"id":32625,"date":"2025-10-05T10:49:39","date_gmt":"2025-10-05T17:49:39","guid":{"rendered":"https:\/\/essential.construction\/news\/intense-mockup-process-key-to-south-niagara-hospital-well-certification-goals-ellisdon\/"},"modified":"2025-10-05T10:49:39","modified_gmt":"2025-10-05T17:49:39","slug":"intense-mockup-process-key-to-south-niagara-hospital-well-certification-goals-ellisdon","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/intense-mockup-process-key-to-south-niagara-hospital-well-certification-goals-ellisdon\/","title":{"rendered":"Intense mockup process key to South Niagara Hospital WELL-certification goals: EllisDon"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>Niagara Health and EllisDon are reporting steady progress on their $3.6-billion, 1.3-million-square-foot South Niagara Hospital project currently rising in Niagara Falls, Ont., with the two-year mark surpassed this summer and project principals declaring the job to be on time and on budget.<\/p>\n<p>EllisDon Infrastructure Healthcare was awarded the 12-storey megaproject in February 2023, groundbreaking on the 50-acre Biggar Road site was five months later and completion is targeted for the summer of 2028. The fixed-price contract encompasses design, build, finance and maintenance of the facility.<\/p>\n<p>The team includes EllisDon Capital and Plenary Americas as leads and Parkin Architects Ltd. and Adamson Associates Architects as designers. The proponents are seeking both LEED and WELL certification.<\/p>\n<p>\u201cManaging a project of this size, we made sure we had really senior people on the team who have done hospitals before and who can bring forward their knowledge to make sure we manage the project effectively,\u201d said EllisDon senior project manager Patricia Wheeler recently.<\/p>\n<p>Wheeler said much of the focus in-house is on wellness goals \u2013 South Niagara Hospital is set to be Canada\u2019s first WELL-certified hospital.<\/p>\n<p>\u00a0<\/p>\n<figure id=\"attachment_495676\" aria-describedby=\"caption-attachment-495676\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-495676\" src=\"https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2025\/10\/DW-EllisDon-Nia-hospital2web.png\" alt=\"Work on the South Niagara Hospital project is now into year three. Sustainability features helping to reach LEED Silver certification include LED lighting, water use reductions, metering and monitoring systems, green roofs, high efficiency HVAC equipment and ad-vanced heat recovery.\" width=\"600\" height=\"449\" srcset=\"https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2025\/10\/DW-EllisDon-Nia-hospital2web.png 600w, https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2025\/10\/DW-EllisDon-Nia-hospital2web-300x225.png 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\"\/><figcaption id=\"caption-attachment-495676\" class=\"wp-caption-text\">ELLISDON DRONE \u2014 Work on the South Niagara Hospital project is now into year three. Sustainability features helping to reach LEED Silver certification include LED lighting, water use reductions, metering and monitoring systems, green roofs, high efficiency HVAC equipment and ad-vanced heat recovery.<\/figcaption><\/figure>\n<p>\u00a0<\/p>\n<p>\u201cWe approached this project from inception to be one that uses the past lessons learned and things that worked well,\u201d said Wheeler. \u201cMany of our design and trade partners engaged on the product have completed hospitals with EllisDon in the last 10 years.<\/p>\n<p>\u201cFor example, in the patient rooms, the layout of the room, the visibility of the patient from the corridor or the nursing workstations, the views the patient has, is something Parkin Architects has worked to refine and bring forward with them to their hospital projects.\u201d<\/p>\n<p>WELL precertification was achieved last year. The standard focuses on 10 elements: air, water, nourishment, light, movement, thermal comfort, sound, materials, mind and community.<\/p>\n<p>\u201cEverything from building materials used to how the building was designed plays a part in WELL,\u201d explained Wheeler. \u201cFeatures such as improved air and water quality, greater access to nature through gardens and terraces, encouraging walkability through the placement of feature stairs, greater access to natural daylight by incorporating larger windows and open-concept office layouts are all examples of WELL elements that were incorporated in the design.\u201d<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<h3><strong>Life-size mockups created<\/strong><\/h3>\n<p>The twin health and wellness goals \u2013 for design certification, and for optimum patient care \u2013 required multiple phases of digital design using BIM and other systems as well as layers of physical mockups using life-sized paper and cardboard cutouts simulating health care settings.<\/p>\n<p>\u201cOur owner partners, Niagara Health and Infrastructure Ontario, had pre-selected rooms that were often repeated in the hospital, that had unique aspects that would provide meaningful input and decision opportunities from the stakeholders, which included clinical staff, patient partners and community members,\u201d said Wheeler.<\/p>\n<p>\u201cWe designed the spaces in the model and on paper, then printed the rooms out at a one-to-one scale for the floor footprint, taped all the rolls of paper together for each room, and had the stakeholders stand in the space, lay on the bed and get a sense of scale, access to and spatial awareness of equipment and furniture.\u201d<\/p>\n<p>Subsequent design phases involved low-fidelity then high-fidelity mockups to gather further feedback, finishing with actual equipment, furniture and finishes installed, Wheeler said.<\/p>\n<p>The unique process is being hailed as a new learning tool, Wheeler said, with other hospital development designers visiting the site to take notes.<\/p>\n<p>Wheeler said EllisDon\u2019s digital project delivery team worked closely with both the client and project operations team to define BIM requirements.<\/p>\n<p>\u201cThey ensure those requirements are tied to the right digital solution that delivers real impact, whether through automation or streamlined workflows or stronger connection between the design and construction teams,\u201d she said.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<h3><strong>Construction milestones<\/strong><\/h3>\n<p>Construction milestones reported in Niagara Health\u2019s most recent newsletter include forming up to level 10 on the east and west side of the building, the completion of slab-on -grade for levels zero and one, installation of curtainwall windows on levels one and two and precast installation on levels three to five.<\/p>\n<p>Roofing work was nearly complete up to level six and block wall installation was completed from levels one through five. Mechanical and electrical equipment has been delivered and placed up to level four.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/infrastructure\/2025\/10\/intense-mockup-process-key-to-south-niagara-hospital-well-certification-goals-ellisdon\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Niagara Health and EllisDon are reporting steady progress on their $3.6-billion, 1.3-million-square-foot South Niagara Hospital project currently rising in &#8230; <a title=\"Intense mockup process key to South Niagara Hospital WELL-certification goals: EllisDon\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/intense-mockup-process-key-to-south-niagara-hospital-well-certification-goals-ellisdon\/\" aria-label=\"Read more about Intense mockup process key to South Niagara Hospital WELL-certification goals: EllisDon\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-32625","post","type-post","status-publish","format-standard","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32625"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32625\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32625"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32625"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}