{"id":32703,"date":"2025-10-09T23:14:41","date_gmt":"2025-10-10T06:14:41","guid":{"rendered":"https:\/\/essential.construction\/news\/work-halted-across-hs2-london-tunnels-after-safety-scare\/"},"modified":"2025-10-09T23:14:41","modified_gmt":"2025-10-10T06:14:41","slug":"work-halted-across-hs2-london-tunnels-after-safety-scare","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/work-halted-across-hs2-london-tunnels-after-safety-scare\/","title":{"rendered":"Work halted across HS2 London tunnels after safety scare"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-502260\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The Skanska Costain STRABAG joint venture in charge of the work is undergoing a full safety review following the incident on September 29.<\/p>\n<p><em>The Telegraph<\/em> said two workers narrowly escaped being crushed by a steel beam swinging across a tunnel ventilation shaft\u00a0 when a gantry crane was being dismantled at the Green Park Way ventilation shaft in west London.<\/p>\n<p>Four tunnel boring machines are currently being dismantled there and removed from the tunnels.<\/p>\n<p>HS2 Chief Executive Officer Wild told <em>The Telegraph<\/em>: \u201cSafety is our number one priority at HS2. Due to a serious incident, works have been safely halted across the London tunnels section of the route.<\/p>\n<p>\u201cWhile no workers were physically harmed, our contractor, Skanska Costain STRABAG joint venture, is undertaking a comprehensive review of safety procedures and leadership on their sites before a safe restart can take place.\u201d<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/3.jpg\" alt=\"Grant Prior\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/10\/09\/work-halted-across-hs2-london-tunnels-after-safety-scare\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The Skanska Costain STRABAG joint venture in charge of the work is undergoing a full safety review following the &#8230; <a title=\"Work halted across HS2 London tunnels after safety scare\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/work-halted-across-hs2-london-tunnels-after-safety-scare\/\" aria-label=\"Read more about Work halted across HS2 London tunnels after safety scare\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-32703","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32703","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32703"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32703\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32703"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32703"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32703"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}