{"id":32834,"date":"2025-10-19T11:21:39","date_gmt":"2025-10-19T18:21:39","guid":{"rendered":"https:\/\/essential.construction\/news\/rfq-issued-for-stations-rail-and-systems-contract-for-yonge-north-subway-extension\/"},"modified":"2025-10-19T11:21:39","modified_gmt":"2025-10-19T18:21:39","slug":"rfq-issued-for-stations-rail-and-systems-contract-for-yonge-north-subway-extension","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/rfq-issued-for-stations-rail-and-systems-contract-for-yonge-north-subway-extension\/","title":{"rendered":"RFQ issued for stations, rail and systems contract for Yonge North Subway Extension"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>TORONTO \u2013 Infrastructure Ontario and Metrolinx have issued a request for qualifications for the stations, rail and systems package for the Yonge North Subway Extension.<\/p>\n<p>The extension will extend the TTC\u2019s Line 1 subway service approximately eight kilometres from the existing terminus at Finch Station into Richmond Hill.<\/p>\n<p>The RFQ outlines the scope of work to include the design, construction, supply, integration and commissioning of the following key elements:<\/p>\n<ul>\n<li>Five new subway stations and associated bus facilities.<\/li>\n<li>Emergency exit buildings, traction power substations and tunnel cross passages.<\/li>\n<li>All rail and signalling systems.<\/li>\n<li>A train storage facility to support Line 1 operations.<\/li>\n<li>Connections at Finch Station, including modifications to the existing tail track.<\/li>\n<li>Integration with existing TTC Line 1 infrastructure and work underway through the advance tunnelling contract work, and the transit-oriented communities program.<\/li>\n<li>Provisions to enable the transit-oriented communities work.<\/li>\n<\/ul>\n<p>The RFQ is the first step in the procurement process to select a team to deliver the project.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/projects\/2025\/10\/rfq-issued-for-stations-rail-and-systems-contract-for-yonge-north-subway-extension\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] TORONTO \u2013 Infrastructure Ontario and Metrolinx have issued a request for qualifications for the stations, rail and systems package &#8230; <a title=\"RFQ issued for stations, rail and systems contract for Yonge North Subway Extension\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/rfq-issued-for-stations-rail-and-systems-contract-for-yonge-north-subway-extension\/\" aria-label=\"Read more about RFQ issued for stations, rail and systems contract for Yonge North Subway Extension\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-32834","post","type-post","status-publish","format-standard","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32834"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32834\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32834"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32834"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}