{"id":32894,"date":"2025-10-22T23:43:05","date_gmt":"2025-10-23T06:43:05","guid":{"rendered":"https:\/\/essential.construction\/news\/work-restarts-on-hs2-tunnels-after-safety-shutdown\/"},"modified":"2025-10-22T23:43:05","modified_gmt":"2025-10-23T06:43:05","slug":"work-restarts-on-hs2-tunnels-after-safety-shutdown","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/work-restarts-on-hs2-tunnels-after-safety-shutdown\/","title":{"rendered":"Work restarts on HS2 tunnels after safety shutdown"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-502658\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The Skanska Costain STRABAG joint venture in charge of the work launched a full shutdown and safety review following the near miss on September 29.<\/p>\n<p>Two workers in a cherry picker basket narrowly escaped being struck by a steel beam while a gantry crane was being dismantled at the Green Park Way ventilation shaft in west London.<\/p>\n<p>The <em>Enquirer<\/em> understands that during the de-rigging of a gantry crane the beam clamps on the main beam which was being lifted, slid along the beam.<\/p>\n<p>This caused the beam to rotate which in turned violently impacted the MEWP which had two operatives in the basket.<\/p>\n<p>The MEWP was seriously damaged and the clipped-on operatives were lucky not to be seriously injured.<\/p>\n<p>Work has now restarted on parts of the 14-mile stretch of twin-bore tunnels between Euston and Hillingdon after additional safety measures were put in place.<\/p>\n<p>A spokesperson for HS2 Ltd said:\u00a0\u201cSafety will always be our top priority which is why all works were halted on the London tunnels section of HS2 following a serious near-miss incident.<\/p>\n<p>\u201cWe have now begun a safe, structured restart across some of these worksites following a comprehensive review of safety procedures and leadership.<\/p>\n<p>\u201cAdditional measures are being implemented by our contractor, Skanska Costain STRABAG joint venture, to ensure the safety of the workforce and we continue to closely monitor performance.\u201d<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/3.jpg\" alt=\"Grant Prior\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/10\/22\/work-restarts-on-hs2-tunnels-after-safety-shutdown\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The Skanska Costain STRABAG joint venture in charge of the work launched a full shutdown and safety review following &#8230; <a title=\"Work restarts on HS2 tunnels after safety shutdown\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/work-restarts-on-hs2-tunnels-after-safety-shutdown\/\" aria-label=\"Read more about Work restarts on HS2 tunnels after safety shutdown\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-32894","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32894"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32894\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}