{"id":32926,"date":"2025-10-24T23:47:12","date_gmt":"2025-10-25T06:47:12","guid":{"rendered":"https:\/\/essential.construction\/news\/jba-bentley-starts-19m-sheffield-flood-defence\/"},"modified":"2025-10-24T23:47:12","modified_gmt":"2025-10-25T06:47:12","slug":"jba-bentley-starts-19m-sheffield-flood-defence","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/jba-bentley-starts-19m-sheffield-flood-defence\/","title":{"rendered":"JBA Bentley starts \u00a319m Sheffield flood defence"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-502730\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The two-year civil engineering job will protect the steelworks and wider Lower Don Valley from repeat flooding by intercepting Bagley Brook where it enters the plant.<\/p>\n<p>A major underground system of attenuation tanks, transfer tunnels and a new pumping station will capture and store stormwater before releasing it into the River Don at a controlled rate of 8,000 litres per second.<\/p>\n<p>JBA Bentley will sink a 5-metre shaft to launch a tunnel boring machine that will drive a 320-metre tunnel, 12 metres below ground. The launch shaft will double as the pumping station and storage chamber.<\/p>\n<p>Craig Fisher, programmes director at Sheffield Forgemasters, said the system will \u201caddress a known flood risk which can affect both our plant and this part of the city.\u201d<\/p>\n<p>A section of flood wall along the Don will also be rebuilt to house the new outfall structure.<\/p>\n<p>The project fulfils planning conditions for Forgemasters\u2019 \u00a3400m site transformation, including its new 13,000-tonne forging line now under construction beside the Midland Mainline railway.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/10\/24\/jba-bentley-starts-19m-sheffield-flood-defence\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The two-year civil engineering job will protect the steelworks and wider Lower Don Valley from repeat flooding by intercepting &#8230; <a title=\"JBA Bentley starts \u00a319m Sheffield flood defence\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/jba-bentley-starts-19m-sheffield-flood-defence\/\" aria-label=\"Read more about JBA Bentley starts \u00a319m Sheffield flood defence\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-32926","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32926","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32926"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32926\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32926"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32926"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32926"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}