{"id":32933,"date":"2025-10-25T11:48:12","date_gmt":"2025-10-25T18:48:12","guid":{"rendered":"https:\/\/essential.construction\/news\/balfour-beatty-seals-start-for-162m-edinburgh-concert-hall-job\/"},"modified":"2025-10-25T11:48:12","modified_gmt":"2025-10-25T18:48:12","slug":"balfour-beatty-seals-start-for-162m-edinburgh-concert-hall-job","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/balfour-beatty-seals-start-for-162m-edinburgh-concert-hall-job\/","title":{"rendered":"Balfour Beatty seals start for \u00a3162m Edinburgh concert hall job"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The deal was sealed after the Scottish Government stepped in with a \u00a320m rescue package for the project, which finally moves forward more than six years after first winning planning.<\/p>\n<p>Sir Robert McAlpine had originally been lined up for the job under a preconstruction deal signed four years ago. But the contractor exited last spring when costs ballooned from the \u00a345m first envisaged by architects Chipperfield and Reiach &amp; Hall.<\/p>\n<p>Balfour Beatty was then brought in under an early contractor involvement agreement to thrash out the build strategy for the tricky city-centre site behind St Andrew Square.<\/p>\n<p>Commissioned by IMPACT Scotland, the landmark venue will give the Scottish Chamber Orchestra a permanent home and form a major base for the Edinburgh International Festival.<\/p>\n<div id=\"attachment_502723\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/d10544a7-18a7-4da4-917d-2b89a763c645_4571x3048-1-scaled.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-502723 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/d10544a7-18a7-4da4-917d-2b89a763c645_4571x3048-1-scaled.jpg\" alt=\"-\" width=\"2560\" height=\"1707\"><\/a><\/p>\n<p class=\"wp-caption-text\">Render of the auditorium in Dunard Centre<\/p>\n<\/div>\n<p>The 1,000-seat hall will feature a complex double basement, five-storey steel frame and intricate oak-panelled interior designed for world-class acoustics.<\/p>\n<p>Work will ramp up in the coming weeks, with completion slated for 2029.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/1485-Dunard-Centre_06_Northern-approach-06_08_21-1100x1100-1.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-502727\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/1485-Dunard-Centre_06_Northern-approach-06_08_21-1100x1100-1.jpg\" alt=\"-\" width=\"1100\" height=\"1100\"><\/a><\/p>\n<p>As part of the works, Balfour Beatty will construct a five-storey steel frame with an envelope fa\u00e7ade of pre-cast concrete panels. The high-quality internal finishes will include bespoke solid oak panelling to the hall to enhance the acoustic experience.<\/p>\n<p>At its peak, the project will employ around 200 people and support five new apprenticeships alongside a major SME supply chain programme.<\/p>\n<p>Nick Rowan, managing director for Balfour Beatty in Scotland, said: \u201cWe are proud to be entrusted with delivering what will become a nationally significant cultural venue in the heart of Edinburgh and have worked meticulously to plan every stage of this complex build, from construction logistics in a tightly constrained site, to the precision needed to achieve world-class acoustic performance.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/10\/24\/balfour-beatty-wins-162m-edinburgh-concert-hall-job\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The deal was sealed after the Scottish Government stepped in with a \u00a320m rescue package for the project, which &#8230; <a title=\"Balfour Beatty seals start for \u00a3162m Edinburgh concert hall job\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/balfour-beatty-seals-start-for-162m-edinburgh-concert-hall-job\/\" aria-label=\"Read more about Balfour Beatty seals start for \u00a3162m Edinburgh concert hall job\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-32933","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32933","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32933"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32933\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32933"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32933"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32933"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}