{"id":32965,"date":"2025-10-27T23:03:49","date_gmt":"2025-10-28T06:03:49","guid":{"rendered":"https:\/\/essential.construction\/news\/evolution-of-work-environments-aec-business\/"},"modified":"2025-10-27T23:03:49","modified_gmt":"2025-10-28T06:03:49","slug":"evolution-of-work-environments-aec-business","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/evolution-of-work-environments-aec-business\/","title":{"rendered":"Evolution of Work Environments &#8211; AEC Business"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<p>Work environments are changing dramatically. In this video\u00a0Eric Richert, Senior Advisor of Optimaze Inc., explains\u00a0how we\u2019ve moved from standardized industrial age\u00a0offices to company towns\u00a0and\u00a0collaborative open platforms.<span id=\"more-3260\"\/><\/p>\n<p>The inevitable development is both a threat and an opportunity. We have already seen how old, inflexible office buildings are becoming obsolete and losing value. On the other hand, the demand for smart, environmentally sound, and flexible newly built\u00a0offices\u00a0is growing. Likewise, corporations and public sector organizations need new knowledge and tools to plan and manage the\u00a0transformation of workspaces.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"http:\/\/optimaze.com\/\" target=\"_blank\">Optimaze<\/a> is a new entrant in the US market. They offer cloud-based software for facilities and space management, together with consulting services. Optimaze Inc. is a subsidiary of our long term Finnish client, <a rel=\"nofollow noopener\" href=\"http:\/\/rapal.fi\" target=\"_blank\">Rapal<\/a>.<\/p>\n<p><iframe loading=\"lazy\" data-placeholder-image=\"https:\/\/aec-business.com\/wp-content\/uploads\/complianz\/placeholders\/vimeo109946004-494029867-a3ac324d1a4503f512fa1cd84cd5d3c7d26966c373d2940fe0728813280d4779-d_640?region=us\" data-category=\"statistics\" data-service=\"vimeo\" data-cmplz-target=\"src\" data-src-cmplz=\"\/\/player.vimeo.com\/video\/109946004\" class=\"cmplz-placeholder-element cmplz-video cmplz-iframe-styles cmplz-iframe lazyload\" data-=\"\" src=\"https:\/\/aec-business.com\/evolution-work-environments\/about:blank\" width=\"600\" height=\"337\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<p><a rel=\"nofollow noopener\" href=\"http:\/\/vimeo.com\/109946004\" target=\"_blank\">Evolution of Work Environments<\/a> from <a rel=\"nofollow noopener\" href=\"http:\/\/vimeo.com\/user29550092\" target=\"_blank\">Optimaze, Inc.<\/a> on <a rel=\"nofollow noopener\" href=\"https:\/\/vimeo.com\" target=\"_blank\">Vimeo<\/a>.<\/p>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/aec-business.com\/evolution-work-environments\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Work environments are changing dramatically. In this video\u00a0Eric Richert, Senior Advisor of Optimaze Inc., explains\u00a0how we\u2019ve moved from standardized &#8230; <a title=\"Evolution of Work Environments &#8211; AEC Business\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/evolution-of-work-environments-aec-business\/\" aria-label=\"Read more about Evolution of Work Environments &#8211; AEC Business\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1062,1066],"tags":[1164],"class_list":["post-32965","post","type-post","status-publish","format-standard","hentry","category-aec-business","category-all-posts","tag-business-development","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32965","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=32965"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/32965\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=32965"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=32965"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=32965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}