{"id":33008,"date":"2025-10-30T11:59:05","date_gmt":"2025-10-30T18:59:05","guid":{"rendered":"https:\/\/essential.construction\/news\/8build-back-in-the-black-as-fixed-price-pivot-pays-off\/"},"modified":"2025-10-30T11:59:05","modified_gmt":"2025-10-30T18:59:05","slug":"8build-back-in-the-black-as-fixed-price-pivot-pays-off","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/8build-back-in-the-black-as-fixed-price-pivot-pays-off\/","title":{"rendered":"8build back in the black as fixed-price pivot pays-off"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-502918\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The London-based contractor delivered a \u00a32.2m pre-tax profit for the year to 31 March 2025, swinging from a \u00a31.2m loss last time out.<\/p>\n<p>Turnover jumped just over a third to \u00a3167m as the business moved away from long, drawn-out PCSA deals towards lump-sum and design-and-build contracts that convert to site more quickly.<\/p>\n<p>Average operating margins improved from 0.6% but still remained tight at 1%.<\/p>\n<p>Cash at bank also climbed 38% to \u00a319m with no debt on the balance sheet.<\/p>\n<p>Chief executive Nick Bellamy said tighter bid discipline, leaner overheads and a record secured pipeline had set the group up for another strong year.<\/p>\n<p>\u201cThe markets, in our experience, have moved away from the PCSA contracts and moved to more fixed price lump sum and fixed price design and build contracts.<\/p>\n<p>\u201cThis has reduced the time period from enquiry to construction in comparison to the elongated PCSA periods. This has helped bolster our revenue for the period. \u201d<\/p>\n<p>8build\u2019s growth was also powered by a surge in its aviation business. The contractor has long worked with London City Airport but expanded this year with new wins at Heathrow and Gatwick.<\/p>\n<p>Bellamy said the firm expected another strong performance this year with \u00a3157m of turnover already secured for 2025\/26 and a \u00a3165m forward order book.<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/10\/30\/8build-back-in-the-black-as-fixed-price-pivot-pays-off\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The London-based contractor delivered a \u00a32.2m pre-tax profit for the year to 31 March 2025, swinging from a \u00a31.2m &#8230; <a title=\"8build back in the black as fixed-price pivot pays-off\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/8build-back-in-the-black-as-fixed-price-pivot-pays-off\/\" aria-label=\"Read more about 8build back in the black as fixed-price pivot pays-off\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-33008","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33008"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33008\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}