{"id":33107,"date":"2025-11-05T23:13:07","date_gmt":"2025-11-06T07:13:07","guid":{"rendered":"https:\/\/essential.construction\/news\/x-marks-the-spot-where-albas-crane-towered-over-mississauga\/"},"modified":"2025-11-05T23:13:07","modified_gmt":"2025-11-06T07:13:07","slug":"x-marks-the-spot-where-albas-crane-towered-over-mississauga","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/x-marks-the-spot-where-albas-crane-towered-over-mississauga\/","title":{"rendered":"X Marks the Spot Where Alba&#8217;s Crane Towered Over Mississauga"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p dir=\"ltr\">The crane has come down from the top of <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/alba.41312\" target=\"_blank\">Alba<\/a>, as \u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/edenshaw-developments-limited.7702\" target=\"_blank\">Edenshaw Developments<\/a>&#8216; 32-storey condominium marks another milestone on its way toward completion on the edge of Mississauga Valley. Rising at Hurontario Street and Fairview Road East, the <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/core-architects.7969\" target=\"_blank\">Core Architects<\/a>-designed tower continues to see progress on its cladding and balcony installation. Situated at a stop on the <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/hurontario-main-line-10-lrt.9723\" target=\"_blank\">Hurontario-Main Line 10 LRT<\/a> between Square One and Cooksville GO station, Alba\u2019s curving form contributes to the emerging skyline along the corridor.\u00a0UrbanToronto last provided an update in <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2025\/05\/balcony-glazing-rising-alba-reaches-mechanical-levels-mississauga.58665\" target=\"_blank\">May, 2025<\/a>, when construction reached the mechanical levels.<\/p>\n<p dir=\"ltr\">The following images capture the upper levels of Alba\u2019s topped-off structure in August, 2025, with the yellow-and-black derrick installed to dismantle the crane. The curving facade displays partially completed cladding installation at the mechanical penthouse, featuring alternating bands of black and white panels, sections of insulation awaiting final cladding, and blue weatherproofing exposed along the slab edges. Below, the concrete balcony slabs curve outward with temporary red safety railings still in place, while glazing units are installed on the residential floors other than the top floor.<\/p>\n<p>]<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190428.JPG\" data-entity-uuid=\"insert-display_default-5bf71d46-b237-4eee-89a5-10a17abbe732\" data-entity-type=\"file\" alt=\"Alba, Mississauga, designed by Core Architects for Edenshaw Developments\" title=\"Looking east to the top of Alba and the derrick installed for removal of the tower crane, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190428.JPG', true, 'Looking east to the top of Alba and the derrick installed for removal of the tower crane, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking east to the top of Alba and the derrick installed for removal of the tower crane, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">In September, 2025, workers in high-visibility gear carefully dismantled a section of the crane boom. Secured to the white lattice truss of the horizontal jib, the crew is seen detaching structural pins and connections.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190429.JPG\" data-entity-uuid=\"insert-display_default-c867baa6-fe03-4944-bf67-d33c96b3e134\" data-entity-type=\"file\" alt=\"Alba, Mississauga, designed by Core Architects for Edenshaw Developments\" title=\"Workers dismantling the crane boom, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190429.JPG', true, 'Workers dismantling the crane boom, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Workers dismantling the crane boom, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">Next, the yellow derrick hoists a detached boom section away from the tower.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190430.JPG\" data-entity-uuid=\"insert-display_default-a68afbc8-0586-45d4-a469-fc89cc17a6c9\" data-entity-type=\"file\" alt=\"Alba, Mississauga, designed by Core Architects for Edenshaw Developments\" title=\"Derrick lifting separated boom sections during crane removal, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190430.JPG', true, 'Derrick lifting separated boom sections during crane removal, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Derrick lifting separated boom sections during crane removal, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">By midday, the crane has been largely dismantled, with the boom sections and rear counterweights removed, leaving only the cab and mast standing above the roofline. The yellow derrick is seen positioned behind the mast. On the roof of the mechanical penthouse, we see scaffolding and temporary barriers as the final structural elements are prepared for lowering.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190431.JPG\" data-entity-uuid=\"insert-display_default-df6f6e71-f4a6-4b16-bea8-9120b84f9f4c\" data-entity-type=\"file\" alt=\"Alba, Mississauga, designed by Core Architects for Edenshaw Developments\" title=\"Final crane components on Alba's roof, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190431.JPG', true, 'Final crane components on Alba's roof, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Final crane components on Alba&#8217;s roof, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">Seen from Hurontario Street in October, 2025, Alba\u2019s tower now stands crane-free, its curvilinear form rising above the rectilinear podium. Building Maintenance Unit platforms are visible at the crown along the west elevation. The tower facade expresses its curvature through continuous bands of fritted-glass balcony railings and white slab edges. Below, the L-shaped podium anchors the composition with vertical white fins and dark metal cladding, framing recessed balconies and glazing that define the residential and amenity levels.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190432.jpeg\" data-entity-uuid=\"insert-display_default-7321cea1-dcf1-4ca9-a0f6-b8381937e71c\" data-entity-type=\"file\" alt=\"Alba, Mississauga, designed by Core Architects for Edenshaw Developments\" title=\"Looking east from Hurontario Street to the podium and tower, image by UrbanToronto Forum contributor Dan416\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190432.jpeg', true, 'Looking east from Hurontario Street to the podium and tower, image by UrbanToronto Forum contributor Dan416'); return false;\"><span class=\"image-description\">Looking east from Hurontario Street to the podium and tower, image by UrbanToronto Forum contributor Dan416<\/span><\/p>\n<p dir=\"ltr\">From a high vantage point looking southeast along Hurontario Street, Alba stands above its neighbours on the local skyline, its derrick still in place. The tower\u2019s balcony glazing is visible up to about the 27th floor along the north and west elevations, while temporary red safety railings outline the upper levels still awaiting final guardrail installation.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190433.jpg\" data-entity-uuid=\"insert-display_default-4ae29937-3cce-4a7f-b2ba-36c3980cc42d\" data-entity-type=\"file\" alt=\"Alba, Mississauga, designed by Core Architects for Edenshaw Developments\" title=\"A high-angle view looking southeast along the Hurontario Street corridor, image by UrbanToronto Forum contributor SkylineHorizons\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190433.jpg', true, 'A high-angle view looking southeast along the Hurontario Street corridor, image by UrbanToronto Forum contributor SkylineHorizons'); return false;\"><span class=\"image-description\">A high-angle view looking southeast along the Hurontario Street corridor, image by UrbanToronto Forum contributor SkylineHorizons<\/span><\/p>\n<p dir=\"ltr\">Alba stands at 109.1m tall and will house 418 residential units upon completion.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190434.jpeg\" data-entity-uuid=\"insert-display_default-1f07aa3a-9e5c-40e0-9f56-22f0044530e3\" data-entity-type=\"file\" alt=\"Alba, Mississauga, designed by Core Architects for Edenshaw Developments\" title=\"Looking east to Alba, designed by Core Architects for Edenshaw Developments\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59755\/59755-190434.jpeg', true, 'Looking east to Alba, designed by Core Architects for Edenshaw Developments'); return false;\"><span class=\"image-description\">Looking east to Alba, designed by Core Architects for Edenshaw Developments<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/11\/x-marks-spot-where-albas-crane-towered-over-mississauga.59755\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The crane has come down from the top of Alba, as \u00a0Edenshaw Developments&#8216; 32-storey condominium marks another milestone on &#8230; <a title=\"X Marks the Spot Where Alba&#8217;s Crane Towered Over Mississauga\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/x-marks-the-spot-where-albas-crane-towered-over-mississauga\/\" aria-label=\"Read more about X Marks the Spot Where Alba&#8217;s Crane Towered Over Mississauga\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-33107","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33107"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33107\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33107"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33107"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}