{"id":33122,"date":"2025-11-06T23:15:06","date_gmt":"2025-11-07T07:15:06","guid":{"rendered":"https:\/\/essential.construction\/news\/one-bloor-wests-crown-rising-to-form-tuned-mass-damper-enclosure\/"},"modified":"2025-11-06T23:15:06","modified_gmt":"2025-11-07T07:15:06","slug":"one-bloor-wests-crown-rising-to-form-tuned-mass-damper-enclosure","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/one-bloor-wests-crown-rising-to-form-tuned-mass-damper-enclosure\/","title":{"rendered":"One Bloor West&#8217;s Crown Rising to Form Tuned Mass Damper Enclosure"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>The 85-storey \u2018supertall\u2019 <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/one.5048\" target=\"_blank\">One Bloor West<\/a> continues to rise above Yonge and Bloor in Yorkville. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/foster-partners.7986\" target=\"_blank\">Foster + Partners<\/a> with <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/core-architects.7969\" target=\"_blank\">Core Architects<\/a>, UrbanToronto\u2019s last update in <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2025\/09\/top-floor-now-fully-formed-supertall-one-bloor-west.59486\" target=\"_blank\">September, 2025<\/a> covered completion of the top floor of the <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/tridel.7852\" target=\"_blank\">Tridel<\/a>-helmed project. Since then, construction has significantly progressed on the complex assembly of the steel superstructure that will form a chamber for a tuned mass damper (TMD) at the tower\u2019s crown.\u00a0<\/p>\n<p dir=\"ltr\">The TMD is a precisely engineered counterweight system that reduces sway in tall buildings. At One Bloor West, it will consist of a massive, multi-tonne steel weight suspended within the crown. When high winds cause the tower to move, the damper will shift in the opposite direction, absorbing the energy and keeping inhabitants of the building comfortable.<\/p>\n<p dir=\"ltr\">In this late-October, 2025 drone view, structural steel beams extend directly from the eight concrete and rebar megacolumns that define the tower\u2019s frame. In the centre, heavy H-beams and diagonal bracing members now interlock in X-shaped configurations, forming a rigid structural box that will stabilize the damper system. An orange boom lift in the central bay is there to assist in aligning and fastening connections between the posts and beams. This steel assembly outlines the damper chamber.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59767\/59767-190494.jpg\" data-entity-uuid=\"insert-display_default-3e33d583-20bc-4a89-9e9d-0040b0abb605\" data-entity-type=\"file\" alt=\"One Bloor West, Toronto, designed by Foster + Partners and Core Architects, developed by Tridel\" title=\"A drone view looking northwest to crown steel construction underway atop One Bloor West, image by UrbanToronto Forum contributor kotsy\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59767\/59767-190494.jpg', true, 'A drone view looking northwest to crown steel construction underway atop One Bloor West, image by UrbanToronto Forum contributor kotsy'); return false;\"><span class=\"image-description\">A drone view looking northwest to crown steel construction underway atop One Bloor West, image by UrbanToronto Forum contributor kotsy<\/span><\/p>\n<p dir=\"ltr\">Over the final week of October, crews installed additional horizontal beams and corner connections, completing the perimeter ring that unites all four sides of the chamber. This interconnected steel grid locks into the reinforced concrete elevator core below, providing the rigid framework required to support the damper and transfer loads evenly.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59767\/59767-190495.jpg\" data-entity-uuid=\"insert-display_default-49afe05d-4b1f-4eb8-a97f-36d12dc9b7c0\" data-entity-type=\"file\" alt=\"One Bloor West, Toronto, designed by Foster + Partners and Core Architects, developed by Tridel\" title=\"Looking northeast to the west elevation of the crown and chamber, image by UrbanToronto Forum contributor jer1961\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59767\/59767-190495.jpg', true, 'Looking northeast to the west elevation of the crown and chamber, image by UrbanToronto Forum contributor jer1961'); return false;\"><span class=\"image-description\">Looking northeast to the west elevation of the crown and chamber, image by UrbanToronto Forum contributor jer1961<\/span><\/p>\n<p dir=\"ltr\">Facing southwest this month, the image captures the intricate geometry of the steel cage, including diagonal cross-bracing. A beam projects outward on the north side from the central chamber to the extension of a megacolumn, with more to follow.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59767\/59767-190492.jpg\" data-entity-uuid=\"insert-display_default-5e214206-a695-4b2e-8715-d0dbdb88b620\" data-entity-type=\"file\" alt=\"One Bloor West, Toronto, designed by Foster + Partners and Core Architects, developed by Tridel\" title=\"An eye-level view of the crown steel assembly, looking southwest, image by UrbanToronto Forum contributor hawc\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59767\/59767-190492.jpg', true, 'An eye-level view of the crown steel assembly, looking southwest, image by UrbanToronto Forum contributor hawc'); return false;\"><span class=\"image-description\">An eye-level view of the crown steel assembly, looking southwest, image by UrbanToronto Forum contributor hawc<\/span><\/p>\n<p dir=\"ltr\">Looking north most recently, the crown structure has advanced with new steel trusses linking the TMD chamber to the megacolumn extensions. Just above the uppermost slab, meanwhile, steel assemblies extend out to the megacolumns where penthouse suites will boast upper level access to corner terraces. Meanwhile, the weather-protecting Rail Climbing System (RCS) seen below for cladding installation has risen again, with the east RCS now stationed at the 72nd floor.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59767\/59767-190493.jpeg\" data-entity-uuid=\"insert-display_default-0cc74e49-1784-4f67-ab7d-275d10f9dd2f\" data-entity-type=\"file\" alt=\"One Bloor West, Toronto, designed by Foster + Partners and Core Architects, developed by Tridel\" title=\"Megacolumn extensions and crown steel connections progressing above the roofline, image by UrbanToronto Forum contributor mburrrrr\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59767\/59767-190493.jpeg', true, 'Megacolumn extensions and crown steel connections progressing above the roofline, image by UrbanToronto Forum contributor mburrrrr'); return false;\"><span class=\"image-description\">Megacolumn extensions and crown steel connections progressing above the roofline, image by UrbanToronto Forum contributor mburrrrr<\/span><\/p>\n<p dir=\"ltr\">When complete, One Bloor West will stand 308.6m tall. With <a rel=\"nofollow noopener\" href=\"https:\/\/renx.ca\/tridel-cancel-presales-toronto-one-bloor-west-2026-relaunch\" target=\"_blank\">Tridel moving to cancel presales<\/a>, the developer is opting for larger units, with the most recent proposal calling for 411 suites, down from 476 previously, alongside 139 hotel rooms.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59767\/59767-190490.jpeg\" data-entity-uuid=\"insert-display_default-04dcd889-29f3-48c6-850e-24e8607cf413\" data-entity-type=\"file\" alt=\"One Bloor West, Toronto, designed by Foster + Partners and Core Architects, developed by Tridel\" title=\"Looking south to One Bloor West, designed by Foster + Partners and Core Architects, developed by Tridel\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59767\/59767-190490.jpeg', true, 'Looking south to One Bloor West, designed by Foster + Partners and Core Architects, developed by Tridel'); return false;\"><span class=\"image-description\">Looking south to One Bloor West, designed by Foster + Partners and Core Architects, developed by Tridel<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/ah-tuned-mass-dampers.44586\" target=\"_blank\">A&amp;H Tuned Mass Dampers<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/aercoustics-engineering-ltd.44962\" target=\"_blank\">Aercoustics Engineering Ltd<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bousfields.7652\" target=\"_blank\">Bousfields<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/core-architects.7969\" target=\"_blank\">Core Architects<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/doka-canada-ltdltee.43947\" target=\"_blank\">Doka Canada Ltd.\/Ltee<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/egis.32488\" target=\"_blank\">Egis<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/kramer-design-associates-limited.22923\" target=\"_blank\">Kramer Design Associates Limited<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/live-patrol-inc.30547\" target=\"_blank\">Live Patrol Inc.<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/mcw-consultants-ltd.44320\" target=\"_blank\">MCW Consultants Ltd<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/motioneering.54223\" target=\"_blank\">Motioneering<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/neezo-studios.39122\" target=\"_blank\">NEEZO Studios<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rebar-enterprises-inc.44797\" target=\"_blank\">Rebar Enterprises Inc<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rjc-engineers.14107\" target=\"_blank\">RJC Engineers<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rwdi-climate-and-performance-engineering.43563\" target=\"_blank\">RWDI Climate and Performance Engineering<\/a><\/td>\n<\/tr>\n<\/table>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/11\/one-bloor-wests-crown-rising-form-tuned-mass-damper-enclosure.59767\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The 85-storey \u2018supertall\u2019 One Bloor West continues to rise above Yonge and Bloor in Yorkville. Designed by Foster + &#8230; <a title=\"One Bloor West&#8217;s Crown Rising to Form Tuned Mass Damper Enclosure\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/one-bloor-wests-crown-rising-to-form-tuned-mass-damper-enclosure\/\" aria-label=\"Read more about One Bloor West&#8217;s Crown Rising to Form Tuned Mass Damper Enclosure\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-33122","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33122"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33122\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}