{"id":33129,"date":"2025-11-07T11:15:17","date_gmt":"2025-11-07T19:15:17","guid":{"rendered":"https:\/\/essential.construction\/news\/contractors-courted-for-1-7bn-london-dlr-extension-job\/"},"modified":"2025-11-07T11:15:17","modified_gmt":"2025-11-07T19:15:17","slug":"contractors-courted-for-1-7bn-london-dlr-extension-job","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/contractors-courted-for-1-7bn-london-dlr-extension-job\/","title":{"rendered":"Contractors courted for \u00a31.7bn London DLR extension job"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The 3km line will branch off from Gallions Reach in the Royal Dock area and run on a viaduct through Beckton Riverside before diving into a 1.5km twin-bore tunnel under the Thames to reach a new elevated station in Thamesmead town centre.<\/p>\n<div id=\"attachment_503173\" class=\"wp-caption alignnone\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/thamesmead-waterside-dlr-station-2.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-503173 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/thamesmead-waterside-dlr-station-2.jpg\" alt=\"-\" width=\"1498\" height=\"998\"><\/a><\/p>\n<p class=\"wp-caption-text\">Thamesmead Waterside masterplan<\/p>\n<\/div>\n<p>Two new stations are planned. One will sit at the heart of the Beckton Riverside development, the other at Thamesmead Waterfront on Peabody\u2019s 100-hectare regeneration site.<\/p>\n<p>The scheme is expected to support 30,000 new homes and deliver a \u00a315.6bn boost to the London economy.<\/p>\n<p>TfL is inviting contractors, designers and suppliers to help shape the delivery model for the project.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/dlr-extension-to-thamesmead-and-beckton-riverside-700x438-1.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-475950\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/dlr-extension-to-thamesmead-and-beckton-riverside-700x438-1.jpg\" alt=\"-\" width=\"700\" height=\"438\"><\/a><\/p>\n<p>Firms will be asked for feedback on buildability, phasing and early contractor involvement before the formal tendering process begins next year.<\/p>\n<p>The London transport project is still subject to full Treasury approval, with hopes that the Chancellor will formally back the scheme in the forthcoming Autumn budget.<\/p>\n<div class=\"break-out-box\">\n<h3>Supplier engagement day<\/h3>\n<hr>\n<p>An in-person Supplier Industry Day will take place on 2 December 2025 at 1 Park Crescent, London W1B 1SH. Registration is through TfL\u2019s SAP Ariba e-tendering portal and must be completed by 25 November. Each company can send up to three representatives.<\/p>\n<p>After the event, TfL will issue a Market Sounding Questionnaire on 5 December, with responses due by 31 January 2026.<\/p>\n<\/div>\n<p>The full procurement is expected to launch in June 2026, followed by contract award in March 2027. Construction is planned to start in 2028 and finish by 2033.<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2025\/11\/07\/contractors-courted-for-1-7bn-london-dlr-extension-job\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The 3km line will branch off from Gallions Reach in the Royal Dock area and run on a viaduct &#8230; <a title=\"Contractors courted for \u00a31.7bn London DLR extension job\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/contractors-courted-for-1-7bn-london-dlr-extension-job\/\" aria-label=\"Read more about Contractors courted for \u00a31.7bn London DLR extension job\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-33129","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33129"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33129\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}