{"id":33271,"date":"2025-11-17T11:37:19","date_gmt":"2025-11-17T19:37:19","guid":{"rendered":"https:\/\/essential.construction\/news\/residential-towers-replace-data-centre-plan-at-front-and-parliament\/"},"modified":"2025-11-17T11:37:19","modified_gmt":"2025-11-17T19:37:19","slug":"residential-towers-replace-data-centre-plan-at-front-and-parliament","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/residential-towers-replace-data-centre-plan-at-front-and-parliament\/","title":{"rendered":"Residential Towers Replace Data Centre Plan at Front and Parliament"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>New plans are in the works for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/281-front-street-east.59836\" target=\"_blank\">281 through 301 Front Street East<\/a>, envisioning a pair of mixed-use residential towers rather than the <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2020\/07\/data-centre-expansion-proposed-parliament-and-front.42718\" target=\"_blank\">previously planned data-centre expansion<\/a>. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/diamond-schmitt-architects.7975\" target=\"_blank\">Diamond Schmitt Architects<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/brl-realty-bresler.7654\" target=\"_blank\">BRL Realty<\/a>, the proposal within walking distance of the future <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/ontario-line-corktown-station.47571\" target=\"_blank\">Corktown station<\/a> on <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/ontario-line-3.47842\" target=\"_blank\">Ontario Line 3<\/a>, introduces 44- and 46-storey towers in an of central Toronto area zoned Reinvestment Area, permitting residential use.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191049.jpg\" data-entity-uuid=\"insert-display_default-31fe6896-5d81-4e22-bb78-6210ca7edc13\" data-entity-type=\"file\" alt=\"281 Front Street, Toronto, designed by Diamond Schmitt for BRL Realty Limited \" title=\"Looking southeast to 281 Front Street, designed by Diamond Schmitt for BRL Realty Limited \" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191049.jpg', true, 'Looking southeast to 281 Front Street, designed by Diamond Schmitt for BRL Realty Limited '); return false;\"><span class=\"image-description\">Looking southeast to 281 Front Street, designed by Diamond Schmitt for BRL Realty Limited <\/span><\/p>\n<p dir=\"ltr\">On the southeast corner of Front and Parliament, the site is at the western edge of Corktown, and sits directly north of the TR2 data centre, a five-storey Equinix facility completed in 2016. The property was transferred through a land swap intended to consolidate First Parliament holdings to the west, a process later overtaken by the Province\u2019s expropriation for Corktown station. Today, the parcel remains tied to the former data-centre program. The previous proposal for the site was for another four-storey\/38.5m data centre, in that case designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/wzmh-architects\" target=\"_blank\">WZMH Architects<\/a> and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/arup\" target=\"_blank\">Arup<\/a> for Equinix, planned before a new subway station was to be built virtually across the street.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191055.jpeg\" data-entity-uuid=\"insert-display_default-c15c8f71-b75b-456b-9d99-4081d415fb0a\" data-entity-type=\"file\" alt=\"Previous plan, Downtown Data Centre, Toronto, designed by WZMH Architects for Equinix Inc and Arup\" title=\"Looking east to the previously planned data centre building, image via submission to City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191055.jpeg', true, 'Looking east to the previously planned data centre building, image via submission to City of Toronto'); return false;\"><span class=\"image-description\">Looking east to the previously planned data centre building, image via submission to City of Toronto<\/span><\/p>\n<p dir=\"ltr\">The block has a long industrial history as part of the city&#8217;s first industrial area. While industries mainly relocated to larger properties further from the original settlement site, some patchy commercial redevelopment occurred over the twentieth century, in recent years sites have been transforming to mixed-use development with multi-family residential leading the land use.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191052.jpg\" data-entity-uuid=\"insert-display_default-9f4b1992-436f-4af0-9969-b87c5375c2dc\" data-entity-type=\"file\" alt=\"Axonometric view, 281 Front Street West, Toronto\" title=\"An axonometric view of the current site, image via BRL Realty Limited\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191052.jpg', true, 'An axonometric view of the current site, image via BRL Realty Limited'); return false;\"><span class=\"image-description\">An axonometric view of the current site, image via BRL Realty Limited<\/span><\/p>\n<p dir=\"ltr\">The new plans&#8217; residential towers of 44 and 46 storeys would stand 145.5m and 152m above a shared U-shaped, four-storey podium. The development would boast 64,975m\u00b2 of Gross Floor Area, including 64,325m\u00b2 of residential area and 650m\u00b2 of commercial space, yielding a Floor Space Index of 16.83 times coverage of the 3,861m\u00b2 lot. This represents a major increase over the former 13,220m\u00b2 data-centre program.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191050.jpg\" data-entity-uuid=\"insert-display_default-b96d3bc9-0b12-4399-adc6-47f8ca59774d\" data-entity-type=\"file\" alt=\"281 Front Street, Toronto, designed by Diamond Schmitt for BRL Realty Limited \" title=\"Looking west to 281 Front Street, designed by Diamond Schmitt for BRL Realty Limited \" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191050.jpg', true, 'Looking west to 281 Front Street, designed by Diamond Schmitt for BRL Realty Limited '); return false;\"><span class=\"image-description\">Looking west to 281 Front Street, designed by Diamond Schmitt for BRL Realty Limited <\/span><\/p>\n<p dir=\"ltr\">Amenity spaces would be concentrated on the fifth floor. At grade, the plan incorporates a 526m\u00b2 POPS (Privately-Owned Publicly-accessible Space) and a mid-block courtyard, either directly on the ground plane or above a structured parking deck, depending on the final garage configuration. The landscape approach would emphasize stormwater capture through planters, green roofs, and underground cisterns, with stored runoff reused for irrigation. These measures accompany full brownfield remediation.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191048.jpg\" data-entity-uuid=\"insert-display_default-6543595e-83a8-4b02-b059-e5c205bc1bc4\" data-entity-type=\"file\" alt=\"281 Front Street, Toronto, designed by Diamond Schmitt for BRL Realty Limited \" title=\"A high-angle view looking west to 281 Front Street, designed by Diamond Schmitt for BRL Realty Limited \" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191048.jpg', true, 'A high-angle view looking west to 281 Front Street, designed by Diamond Schmitt for BRL Realty Limited '); return false;\"><span class=\"image-description\">A high-angle view looking west to 281 Front Street, designed by Diamond Schmitt for BRL Realty Limited <\/span><\/p>\n<p dir=\"ltr\">The new plan introduces 898 residential units in total. Each tower would be served by four elevators, or roughly one cab for every 112 units across the project, requiring high speed motors for acceptable service promptness. Parking is planned for 259 vehicles, with the option of up to four underground levels; above-grade parking remains under review but would reduce space available for the courtyard. Bicycle facilities entail 990 spaces.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191051.jpg\" data-entity-uuid=\"insert-display_default-1fbec4c6-3d02-4330-8704-6def4ca39829\" data-entity-type=\"file\" alt=\"Ground floor plan, 281 Front Street, Toronto, designed by Diamond Schmitt for BRL Realty Limited \" title=\"Ground floor plan, designed by Diamond Schmitt for BRL Realty Limited \" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191051.jpg', true, 'Ground floor plan, designed by Diamond Schmitt for BRL Realty Limited '); return false;\"><span class=\"image-description\">Ground floor plan, designed by Diamond Schmitt for BRL Realty Limited <\/span><\/p>\n<p dir=\"ltr\">The site is about 200m from the future Corktown station, a walk of roughly three minutes. Existing TTC service along Parliament and King provides additional north\u2013south and east\u2013west connections, while the surrounding West Don Lands and Canary District offer an established network of cycling lanes and multi-use paths.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191054.jpg\" data-entity-uuid=\"insert-display_default-91d916e8-f094-4cfd-b443-b532577c6b59\" data-entity-type=\"file\" alt=\"Aerial view, 281 Front Street West, Toronto\" title=\"An aerial view of the site and surrounding area, image via BRL Realty Limited\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59846\/59846-191054.jpg', true, 'An aerial view of the site and surrounding area, image via BRL Realty Limited'); return false;\"><span class=\"image-description\">An aerial view of the site and surrounding area, image via BRL Realty Limited<\/span><\/p>\n<p dir=\"ltr\">The proposal lands within a rapidly intensifying pocket of Corktown. To the east, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/cherry-place.30071\" target=\"_blank\">Cherry Place<\/a> and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/cherry-house-canary-landing.39101\" target=\"_blank\">Cherry House at Canary Landing<\/a> rise to 13 storeys, with a <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/curio-hilton-distillery-district.4185\" target=\"_blank\">Curio by Hilton<\/a> hotel slated for 31 storeys. To the south, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/goode-condos.28417\" target=\"_blank\">The Goode Condos<\/a> rises 33 storeys and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/no-31-condos.21826\" target=\"_blank\">No. 31 Condos<\/a> is heading for 46 storeys, alongside a 49-storey unstarted proposal at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/31r-parliament-street.10289\" target=\"_blank\">31R Parliament<\/a>. West of the site, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/king-east-centre.160\" target=\"_blank\">King East Centre<\/a> plans 39 storeys, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/296-king-east.46653\" target=\"_blank\">296 King East<\/a> would reach 46 storeys, and the Corktown Transit Oriented Community plans towers from 22 to 58 storeys across its <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/corktown-transit-oriented-community-north-site.55446\" target=\"_blank\">North<\/a> and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/corktown-transit-oriented-community-south-site.55447\" target=\"_blank\">South<\/a> blocks.<\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/11\/residential-towers-replace-data-centre-plan-front-and-parliament.59846\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] New plans are in the works for 281 through 301 Front Street East, envisioning a pair of mixed-use residential &#8230; <a title=\"Residential Towers Replace Data Centre Plan at Front and Parliament\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/residential-towers-replace-data-centre-plan-at-front-and-parliament\/\" aria-label=\"Read more about Residential Towers Replace Data Centre Plan at Front and Parliament\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-33271","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33271","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33271"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33271\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}