{"id":33365,"date":"2025-11-24T23:55:14","date_gmt":"2025-11-25T07:55:14","guid":{"rendered":"https:\/\/essential.construction\/news\/pinnacle-international-celebrates-as-skytower-crosses-100-storey-threshold\/"},"modified":"2025-11-24T23:55:14","modified_gmt":"2025-11-25T07:55:14","slug":"pinnacle-international-celebrates-as-skytower-crosses-100-storey-threshold","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/pinnacle-international-celebrates-as-skytower-crosses-100-storey-threshold\/","title":{"rendered":"Pinnacle International Celebrates as SkyTower Crosses 100 Storey Threshold"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<td class=\"layout-content\">\n<div class=\"content\" style=\"&#9;visibility: hidden;\" id=\"content\">\n<div class=\"article-top\">\n<div class=\"content-info\"><span class=\"article-category\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/development\" target=\"_blank\">DEVELOPMENT<\/a><\/span>\u00a0<span class=\"article-subcategory\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/!\/construction\" target=\"_blank\">CONSTRUCTION<\/a><\/span><br \/><span id=\"article_info\">November 24, 2025 <span class=\"article-author\">by Anthony Teles, Craig White<\/span><\/span>\u00a0\u00a0<span class=\"content-views\"><img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/views.png?14728329483\" alt=\"-\">\u00a0612\u00a0<\/span><\/div>\n<p><span id=\"article_title\">Pinnacle International Celebrates as SkyTower Crosses 100 Storey Threshold<\/span><\/p>\n<\/div>\n<div class=\"article-content\" id=\"article_content\">\n<div class=\"article-body\" id=\"article_body\">\n<p>SkyTower at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/pinnacle-one-yonge.6918\" target=\"_blank\">Pinnacle One Yonge<\/a> has officially become the first building in Canada to reach 100 storeys, a milestone marked on Friday with a construction tour that UrbanToronto attended as part of the celebration. Rising within the 4.4-million ft\u00b2 mixed-use Pinnacle One Yonge community at the foot of Yonge Street, the 106-storey tower is designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/hariri-pontarini-architects.8001\" target=\"_blank\">Hariri Pontarini Architects<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/pinnacle-international.7793\" target=\"_blank\">Pinnacle International<\/a>. The tower surpassed 300m to reach &#8216;supertall&#8217; status <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2025\/11\/skytower-pinnacle-one-yonge-reaches-300m-joining-canadas-supertall-club.59780\" target=\"_blank\">earlier this month<\/a>.<\/p>\n<p dir=\"ltr\">A north-facing drone view captures SkyTower pushing past the 100-storey mark, now standing roughly 311.35m and overtaking <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/one.5048\" target=\"_blank\">One Bloor West<\/a> (also visible below, piercing the horizon, in the centre, back). Curtainwall installation has climbed to about the 79th floor, with balcony glazing visible one level below. The construction hoist, recently extended to the floors in the mid-80s, remains fixed to the tower\u2019s east face.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191289.jpg\" data-entity-uuid=\"insert-display_default-a0a671fc-edfb-4517-9a56-f53c724ca028\" data-entity-type=\"file\" alt=\"Pinnacle One Yonge, Toronto, designed by Hariri Pontarini Architects for Pinnacle International\" title=\"A drone view looking north to glazing progress, image by UrbanToronto Forum contributor kotsy\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191289.jpg', true, 'A drone view looking north to glazing progress, image by UrbanToronto Forum contributor kotsy'); return false;\"><span class=\"image-description\">A drone view looking north to glazing progress, image by UrbanToronto Forum contributor kotsy<\/span><\/p>\n<p dir=\"ltr\">At grade, the tour began with the construction hoist that took attendees to the 84th floor. In behind, crew members are working on a boom lift under the steel-frame canopy that spans between the podium volumes. In front, we see debris bins and bundled components on a flatbed waiting for distribution up the tower.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191290.jpeg\" data-entity-uuid=\"insert-display_default-eafef4d9-6ef3-4dbc-ba07-6202180e1628\" data-entity-type=\"file\" alt=\"Pinnacle One Yonge, Toronto, designed by Hariri Pontarini Architects for Pinnacle International\" title=\"Ground-level activity near the construction hoist, image by Craig White\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191290.jpeg', true, 'Ground-level activity near the construction hoist, image by Craig White'); return false;\"><span class=\"image-description\">Ground-level activity near the construction hoist, image by Craig White<\/span><\/p>\n<p dir=\"ltr\">After climbing concrete stairs to the 100th floor, and then temporary steel stairs to the top of the elevator core form, (roughly the 101st floor), we see the construction deck above the floor in progress. Prefabricated rebar cages are staged along the timber decking. The red concrete boom pump arcs overhead. Surrounding the platform, temporary fencing and work staging enclose materials and protect crews.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191291.jpeg\" data-entity-uuid=\"insert-display_default-cc310407-bfe6-43fd-9358-fb31abbc92e4\" data-entity-type=\"file\" alt=\"Pinnacle One Yonge, Toronto, designed by Hariri Pontarini Architects for Pinnacle International\" title=\"Upper-deck staging, rebar cages, and concrete boom pump viewed from the top of the elevator core form, image by Craig White\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191291.jpeg', true, 'Upper-deck staging, rebar cages, and concrete boom pump viewed from the top of the elevator core form, image by Craig White'); return false;\"><span class=\"image-description\">Upper-deck staging, rebar cages, and concrete boom pump viewed from the top of the elevator core form, image by Craig White<\/span><\/p>\n<p dir=\"ltr\">Looking south from the top of the elevator core form, the tower\u2019s twelve-sided geometry becomes clearer in the curvature of the perimeter formwork, where red safety screens trace the chamfered edges. The slab below is being prepared for the next concrete pour, with rebar and conduit is laid across temporary plywood decking. More rebar extends upwards where columns and walls will be formed to take the building several more storeys higher.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191292.jpeg\" data-entity-uuid=\"insert-display_default-9f22deda-2712-4bc9-91c9-6bef715f9ffd\" data-entity-type=\"file\" alt=\"Pinnacle One Yonge, Toronto, designed by Hariri Pontarini Architects for Pinnacle International\" title=\"South-facing view showing perimeter formwork, image by Craig White\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191292.jpeg', true, 'South-facing view showing perimeter formwork, image by Craig White'); return false;\"><span class=\"image-description\">South-facing view showing perimeter formwork, image by Craig White<\/span><\/p>\n<p dir=\"ltr\">A westward view captures the slab pour underway as the concrete boom pump feeds fresh concrete directly onto the rebar mat for the next floor-plate. Crews guide the hose across the surface to place the mix.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191294.jpeg\" data-entity-uuid=\"insert-display_default-a681182a-a041-4bb4-aa95-a99e556a8cde\" data-entity-type=\"file\" alt=\"Pinnacle One Yonge, Toronto, designed by Hariri Pontarini Architects for Pinnacle International\" title=\"Concrete slab pour underway on upper levels, image by Craig White\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191294.jpeg', true, 'Concrete slab pour underway on upper levels, image by Craig White'); return false;\"><span class=\"image-description\">Concrete slab pour underway on upper levels, image by Craig White<\/span><\/p>\n<p dir=\"ltr\">Crews on the uppermost working deck guide a crane-hoisted concrete bucket into position, coordinating through hand signals as the rigging assembly swings above the forming tables. Below, we see the recently poured concrete just beginning to cure.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191295.jpeg\" data-entity-uuid=\"insert-display_default-4f6417d6-24da-4e2b-88d9-061eb4581c20\" data-entity-type=\"file\" alt=\"Pinnacle One Yonge, Toronto, designed by Hariri Pontarini Architects for Pinnacle International\" title=\"Crews guiding a crane-hoisted concrete bucket, image by Craig White\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191295.jpeg', true, 'Crews guiding a crane-hoisted concrete bucket, image by Craig White'); return false;\"><span class=\"image-description\">Crews guiding a crane-hoisted concrete bucket, image by Craig White<\/span><\/p>\n<p dir=\"ltr\">From the north end of the upper deck, the forming system for SkyTower\u2019s post-tensioned shear walls is visible, with red steel beams and brackets tying the wall forms into the freshly poured slab. Vertical rebar cages rise at each wall line, waiting for the next lift of concrete that will continue the tower\u2019s high-density, wind-resistant core. In the centre of the image, a crew member guides a power trowel across freshly placed concrete, smoothing out the mix for an even surface as the concrete firms up during the curing process.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191296.jpeg\" data-entity-uuid=\"insert-display_default-20e06d4d-5702-4eec-bc9d-4213ab1baf60\" data-entity-type=\"file\" alt=\"Pinnacle One Yonge, Toronto, designed by Hariri Pontarini Architects for Pinnacle International\" title=\"Post-tensioned shear wall formwork and vertical rebar at the north end of the upper deck, image by Craig White\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191296.jpeg', true, 'Post-tensioned shear wall formwork and vertical rebar at the north end of the upper deck, image by Craig White'); return false;\"><span class=\"image-description\">Post-tensioned shear wall formwork and vertical rebar at the north end of the upper deck, image by Craig White<\/span><\/p>\n<p dir=\"ltr\">As crew members worked a floor below, Pinnacle International team members from across Canada gathered to celebrate the 100th storey milestone, the first time any building in the country has claimed triple digits.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191300.jpeg\" data-entity-uuid=\"insert-display_default-3ab1372b-cb71-4a57-baa2-687485ca2ae6\" data-entity-type=\"file\" alt=\"Pinnacle International team members from across Canada joined in the celebrations, SkyTower, Toronto\" title=\"Pinnacle International team members from across Canada joined in the celebrations, image by Craig White\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191300.jpeg', true, 'Pinnacle International team members from across Canada joined in the celebrations, image by Craig White'); return false;\"><span class=\"image-description\">Pinnacle International team members from across Canada joined in the celebrations, image by Craig White<\/span><\/p>\n<p dir=\"ltr\">In the gold helmet, below, Michael De Cotiis, President and CEO of Vancouver-based Pinnacle International, led the celebrations of the accomplishment.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191299.jpeg\" data-entity-uuid=\"insert-display_default-7874d0bb-b864-4472-8dfe-e8e3c27699b0\" data-entity-type=\"file\" alt=\"Michael De Cotiis, President and CEO of Pinnacle International, waves to the crowd assembled to celebrate 100 storeys, SkyTower, Toronto,\" title=\"Michael De Cotiis, President and CEO of Pinnacle International, waves to the crowd assembled to celebrate the milestone, image by Craig White\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191299.jpeg', true, 'Michael De Cotiis, President and CEO of Pinnacle International, waves to the crowd assembled to celebrate the milestone, image by Craig White'); return false;\"><span class=\"image-description\">Michael De Cotiis, President and CEO of Pinnacle International, waves to the crowd assembled to celebrate the milestone, image by Craig White<\/span><\/p>\n<p dir=\"ltr\">Over the remaining levels of the building, there are five more residential floors to form, including the 105th level penthouse, a whole-floor unit which is now on the market for $30 million. Above it, Pinnacle has just announced a 106th floor destination restaurant, with no further details yet, other than it will one of the highest dining experiences in the country along with 360 in the CN Tower. The restaurant will sit just below the mechanical penthouse and tuned mass damper levels that will bring the building to over 351m in height.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191293.jpeg\" data-entity-uuid=\"insert-display_default-4175f3b1-a75e-47ba-9e9e-7fd5c841f593\" data-entity-type=\"file\" alt=\"Pinnacle One Yonge, Toronto, designed by Hariri Pontarini Architects for Pinnacle International\" title=\"Ground-level glazing installation underway along the west elevation of the podium, image by UrbanToronto Forum contributor ImmenselyMental\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191293.jpeg', true, 'Ground-level glazing installation underway along the west elevation of the podium, image by UrbanToronto Forum contributor ImmenselyMental'); return false;\"><span class=\"image-description\">Ground-level glazing installation underway along the west elevation of the podium, image by UrbanToronto Forum contributor ImmenselyMental<\/span><\/p>\n<p dir=\"ltr\">Back at grade, a Le M\u00e9ridien Hotel by Marriott with its lobby, meeting, and ballroom spaces will occupy much of the ground and second floors. There will also be retail at grade. Glazing installation has started on the ground level, with the podium levels otherwise sealed in above. Amenities and the 223 hotel suites will generally continue on the dozen floors above, before the condo suites take over.\u00a0<\/p>\n<p dir=\"ltr\">Topping off is targeted for early 2026, at which time SkyTower will stand 351.85m tall. The hotel is expected to open before Spring next year. Occupancy of the first of the 958 residential suites is expected in May, 2026.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191297.jpg\" data-entity-uuid=\"insert-display_default-f98f1b6b-7279-410b-8687-6df96b9549f0\" data-entity-type=\"file\" alt=\"Pinnacle One Yonge, Toronto, designed by Hariri Pontarini Architects for Pinnacle International\" title=\"Approved design of Pinnacle One Yonge, designed by Hariri Pontarini Architects for Pinnacle International\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/11\/59915\/59915-191297.jpg', true, 'Approved design of Pinnacle One Yonge, designed by Hariri Pontarini Architects for Pinnacle International'); return false;\"><span class=\"image-description\">Approved design of Pinnacle One Yonge, designed by Hariri Pontarini Architects for Pinnacle International<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/ah-tuned-mass-dampers.44586\" target=\"_blank\">A&amp;H Tuned Mass Dampers<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bousfields.7652\" target=\"_blank\">Bousfields<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bullseye-precision-glazing-group.59880\" target=\"_blank\">BullsEye Precision Glazing Group<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bvglazing-systems.31797\" target=\"_blank\">BVGlazing Systems<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/doka-canada-ltdltee.43947\" target=\"_blank\">Doka Canada Ltd.\/Ltee<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/egis.32488\" target=\"_blank\">Egis<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/gradient-wind-engineers-scientists.43829\" target=\"_blank\">Gradient Wind Engineers &amp; Scientists<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/grounded-engineering-inc.40682\" target=\"_blank\">Grounded Engineering Inc.<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/hariri-pontarini-architects.8001\" target=\"_blank\">Hariri Pontarini Architects<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/jablonsky-ast-and-partners.35673\" target=\"_blank\">Jablonsky, Ast and Partners<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/motioneering.54223\" target=\"_blank\">Motioneering<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/new-release-condo.54777\" target=\"_blank\">New Release Condo<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/peter-mccann-architectural-models-inc.39635\" target=\"_blank\">Peter McCann Architectural Models Inc.<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rwdi-climate-and-performance-engineering.43563\" target=\"_blank\">RWDI Climate and Performance Engineering<\/a><\/td>\n<\/tr>\n<\/table>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<\/div>\n<div class=\"articles\" id=\"articles\">\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/more-content.png?14728329483\" onclick=\"loadArticles();\" alt=\"-\"><\/p><\/div>\n<\/div>\n<\/td>\n<td class=\"trending-column\" style=\"display: none;\" id=\"trending_block\"\/>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/11\/pinnacle-international-celebrates-skytower-crosses-100-storey-threshold.59915\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] DEVELOPMENT\u00a0CONSTRUCTIONNovember 24, 2025 by Anthony Teles, Craig White\u00a0\u00a0\u00a0612\u00a0 Pinnacle International Celebrates as SkyTower Crosses 100 Storey Threshold SkyTower at &#8230; <a title=\"Pinnacle International Celebrates as SkyTower Crosses 100 Storey Threshold\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/pinnacle-international-celebrates-as-skytower-crosses-100-storey-threshold\/\" aria-label=\"Read more about Pinnacle International Celebrates as SkyTower Crosses 100 Storey Threshold\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-33365","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33365","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33365"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33365\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33365"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33365"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33365"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}