{"id":33459,"date":"2025-12-02T00:07:52","date_gmt":"2025-12-02T08:07:52","guid":{"rendered":"https:\/\/essential.construction\/news\/hybrid-steel-geothermal-mid-rise-tops-off-in-cabbagetown-south\/"},"modified":"2025-12-02T00:07:52","modified_gmt":"2025-12-02T08:07:52","slug":"hybrid-steel-geothermal-mid-rise-tops-off-in-cabbagetown-south","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/hybrid-steel-geothermal-mid-rise-tops-off-in-cabbagetown-south\/","title":{"rendered":"Hybrid-Steel, Geothermal Mid-Rise Tops Off in Cabbagetown South"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Construction has topped off at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/252-parliament-street.43199\" target=\"_blank\">252 Parliament Street<\/a>, a 9-storey, mixed-use residential rental building designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/studio-jci.19451\" target=\"_blank\">Studio JCI<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/core-development-group.22604\" target=\"_blank\">Core Development Group<\/a> in Toronto\u2019s Cabbagetown South neighbourhood. Rising on a hybrid steel structure, the building also incorporates a geothermal heating and cooling system. The site is a short walk from the future <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/ontario-line-3.47842\" target=\"_blank\">Ontario Line 3<\/a>\u2019s <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/ontario-line-moss-park-station.47570\" target=\"_blank\">Moss Park station<\/a>.<\/p>\n<p dir=\"ltr\">Looking southeast across Poulett Street in January, 2025, the west elevation showed the building at two full floors completed, with the ground floor in reinforced concrete and cold-formed steel (CFS) wall panels, then being installed as the third level took shape along the north side. Construction was transitioning from the concrete base, comprising the P1 level, foundation walls, and ground-floor slab, to the hybrid steel and CFS framing system. The crane had been installed in June, 2024.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191490.jpeg\" data-entity-uuid=\"insert-display_default-f6f9a2bf-b48a-4cb5-960f-202a6e4d763b\" data-entity-type=\"file\" alt=\"252 Parliament Street, Toronto, designed by Studio JCI for Core Development Group\" title=\"Looking southeast from Poulett Street to the west elevation, image by UrbanToronto Forum contributor rdaner\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191490.jpeg', true, 'Looking southeast from Poulett Street to the west elevation, image by UrbanToronto Forum contributor rdaner'); return false;\"><span class=\"image-description\">Looking southeast from Poulett Street to the west elevation, image by UrbanToronto Forum contributor rdaner<\/span><\/p>\n<p dir=\"ltr\">Seen from across Parliament Street in March, 2025, the east elevation had reached five storeys, with the sixth floor behind temporary fencing. The facade showed black-framed glazing with a mix of narrow vertical modules, wider punched openings, and louvres installed across the second and third levels. Orange tarp lines the inside of the sixth floor.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191491.jpeg\" data-entity-uuid=\"insert-display_default-1bcb2ffe-870b-4333-adb7-bb507892bcbe\" data-entity-type=\"file\" alt=\"252 Parliament Street, Toronto, designed by Studio JCI for Core Development Group\" title=\"East elevation fronting Parliament Street, image by UrbanToronto Forum contributor rdaner\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191491.jpeg', true, 'East elevation fronting Parliament Street, image by UrbanToronto Forum contributor rdaner'); return false;\"><span class=\"image-description\">East elevation fronting Parliament Street, image by UrbanToronto Forum contributor rdaner<\/span><\/p>\n<p dir=\"ltr\">Looking south along the east elevation in June, 2025, white GlasRoc weatherproofing is installed across the first two floors, and yellow DensGlass sheathing defines the upper residential levels. Ground-floor openings remain unglazed, framed by steel lintels and projecting brackets that will support signage or small canopies along the retail frontage and residential entrance. A temporary wooden bridge spans the unfinished frontage to maintain site access while streetscape and landscape work await their future build-out.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191492.jpeg\" data-entity-uuid=\"insert-display_default-47207bbf-3fa7-46b8-a12a-71705b764ef2\" data-entity-type=\"file\" alt=\"252 Parliament Street, Toronto, designed by Studio JCI for Core Development Group\" title=\"Close-up of the white and yellow weatherproofing materials applied to the structure, image by UrbanToronto Forum contributor skycandy\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191492.jpeg', true, 'Close-up of the white and yellow weatherproofing materials applied to the structure, image by UrbanToronto Forum contributor skycandy'); return false;\"><span class=\"image-description\">Close-up of the white and yellow weatherproofing materials applied to the structure, image by UrbanToronto Forum contributor skycandy<\/span><\/p>\n<p dir=\"ltr\">Looking northwest, still in June 2025, the building had reached eight storeys, with the crane positioned near the south end of the site between the east and west arms along the south elevation. The Parliament Street frontage shows step-backs at the fourth, seventh, and eighth floors. Glazing was largely in place up to the sixth storey. Temporary wood fencing and perimeter guards outline active work at the top of the building.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191493.jpeg\" data-entity-uuid=\"insert-display_default-2aa91109-0ec8-4fd9-aede-daa5c32dce4c\" data-entity-type=\"file\" alt=\"252 Parliament Street, Toronto, designed by Studio JCI for Core Development Group\" title=\"Looking northwest to glazing installation progress, with the structure standing at eight storeys, image by UrbanToronto Forum contributor rdaner\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191493.jpeg', true, 'Looking northwest to glazing installation progress, with the structure standing at eight storeys, image by UrbanToronto Forum contributor rdaner'); return false;\"><span class=\"image-description\">Looking northwest to glazing installation progress, with the structure standing at eight storeys, image by UrbanToronto Forum contributor rdaner<\/span><\/p>\n<p dir=\"ltr\">With the crane having been removed in September, 2025, a mast-mounted construction hoist now anchors the southwest corner. The building stands topped off, its nine residential storeys and mechanical penthouse visible through the stepped massing introduced at the upper levels. The top three levels, including the mechanical penthouse, display an additional layer of waterproofing sealing the moisture-resistant sheathing.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191494.jpg\" data-entity-uuid=\"insert-display_default-c3e82999-7f16-4b00-a992-d75132f2a30d\" data-entity-type=\"file\" alt=\"252 Parliament Street, Toronto, designed by Studio JCI for Core Development Group\" title=\"A distant view looking northwest to the topped off mid-rise with crane dismantled, image by UrbanToronto Forum contributor GameOnBrad\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191494.jpg', true, 'A distant view looking northwest to the topped off mid-rise with crane dismantled, image by UrbanToronto Forum contributor GameOnBrad'); return false;\"><span class=\"image-description\">A distant view looking northwest to the topped off mid-rise with crane dismantled, image by UrbanToronto Forum contributor GameOnBrad<\/span><\/p>\n<p dir=\"ltr\">Looking southwest from across Parliament Street, a light precast cladding system covers a continuous membrane that seals the GlasRoc and DensGlass weatherproofing underneath. East and west arms frame a recessed central bay fitted with black-framed glazing. Lighter precast cladding is still to be installed on the lower six floors fronting Parliament Street, to be contrasted by a darker precast treatment for the upper floors.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191495.jpeg\" data-entity-uuid=\"insert-display_default-942744e4-d786-4932-9d30-852fb5cb0b36\" data-entity-type=\"file\" alt=\"252 Parliament Street, Toronto, designed by Studio JCI for Core Development Group\" title=\"Looking southwest to the north elevation, image by UrbanToronto Forum contributor Rascacielo\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191495.jpeg', true, 'Looking southwest to the north elevation, image by UrbanToronto Forum contributor Rascacielo'); return false;\"><span class=\"image-description\">Looking southwest to the north elevation, image by UrbanToronto Forum contributor Rascacielo<\/span><\/p>\n<p dir=\"ltr\">At completion, the building will stand 28.7m tall and contain 80 market-rate rental units.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191496.jpeg\" data-entity-uuid=\"insert-display_default-744f10c8-0667-4d9f-892d-52dc3f3854cd\" data-entity-type=\"file\" alt=\"252 Parliament Street, Toronto, designed by Studio JCI for Core Development Group\" title=\"Looking west to 252 Parliament Street, designed by Studio JCI for Core Development Group\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59957\/59957-191496.jpeg', true, 'Looking west to 252 Parliament Street, designed by Studio JCI for Core Development Group'); return false;\"><span class=\"image-description\">Looking west to 252 Parliament Street, designed by Studio JCI for Core Development Group<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/12\/hybrid-steel-geothermal-mid-rise-tops-cabbagetown-south.59957\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Construction has topped off at 252 Parliament Street, a 9-storey, mixed-use residential rental building designed by Studio JCI for &#8230; <a title=\"Hybrid-Steel, Geothermal Mid-Rise Tops Off in Cabbagetown South\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/hybrid-steel-geothermal-mid-rise-tops-off-in-cabbagetown-south\/\" aria-label=\"Read more about Hybrid-Steel, Geothermal Mid-Rise Tops Off in Cabbagetown South\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-33459","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33459"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33459\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}