{"id":33468,"date":"2025-12-02T12:08:26","date_gmt":"2025-12-02T20:08:26","guid":{"rendered":"https:\/\/essential.construction\/news\/canderel-and-kingsetts-908-st-clair-west-tops-off\/"},"modified":"2025-12-02T12:08:26","modified_gmt":"2025-12-02T20:08:26","slug":"canderel-and-kingsetts-908-st-clair-west-tops-off","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/canderel-and-kingsetts-908-st-clair-west-tops-off\/","title":{"rendered":"Canderel and KingSett\u2019s 908 St Clair West Tops Off"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/908-st-clair-west.27025\" target=\"_blank\">908 St Clair West<\/a> has topped off in Toronto\u2019s St Clair West Village. The 12-storey mixed-use condominium, designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/tact-architecture.8066\" target=\"_blank\">TACT Architecture<\/a> with <a rel=\"nofollow noopener\" roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/cumulus-architects-inc.25445\" target=\"_blank\">Cumulus Architects<\/a> as Architect of Record for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/canderel-residential.7667\" target=\"_blank\">Canderel Residential<\/a> and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/kingsett-capital.7751\" target=\"_blank\">KingSett Capital<\/a>, rises on the northwest corner of St Clair Avenue West and Alberta Avenue. The project has advanced steadily since UrbanToronto\u2019s last update in <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2023\/07\/catching-latest-construction-starts-across-gtha.53157\" target=\"_blank\">July, 2023<\/a>, shortly after the ground breaking.<\/p>\n<p dir=\"ltr\">In January, 2025, excavation for the two-level garage was complete, with the crane having been installed in December, 2024. Decking for the P1 slab was taking shape around the crane base, supported by shoring posts, while newly poured perimeter walls and interior columns were rising. Near the northwest corner, the caisson wall is fully exposed, supported by a pair of canted steel rakers. Construction crews and excavators operate at the base of the excavation.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191512.jpg\" data-entity-uuid=\"insert-display_default-8f3affad-213d-41fc-b03f-d9b235ff6857\" data-entity-type=\"file\" alt=\"908 St Clair West, Toronto, designed by TACT Architecture for Canderel Residential and KingSett Capital\" title=\"Looking west to the excavation and caisson wall next to the tower crane, image by UrbanToronto Forum contributor AlbertC\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191512.jpg', true, 'Looking west to the excavation and caisson wall next to the tower crane, image by UrbanToronto Forum contributor AlbertC'); return false;\"><span class=\"image-description\">Looking west to the excavation and caisson wall next to the tower crane, image by UrbanToronto Forum contributor AlbertC<\/span><\/p>\n<p dir=\"ltr\">Looking northwest in April, 2025, the project had reached grade with the ground-floor slab formed and crews preparing for first-storey walls with rebar cages and formwork. The crane hoists a concrete bucket near a heavily reinforced shear-wall, where workers on a scissor lift attend to conduit and steel. Workers are spread across the grade slab, with a flatbed loaded with rebar and a concrete mixer truck staged along Alberta Avenue.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191510.jpg\" data-entity-uuid=\"insert-display_default-931b7e20-cf3d-4a45-992b-ec07ec0868a0\" data-entity-type=\"file\" alt=\"908 St Clair West, Toronto, designed by TACT Architecture for Canderel Residential and KingSett Capital\" title=\"Ground-floor forming and the tower crane hoisting a concrete bucket, looking north, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191510.jpg', true, 'Ground-floor forming and the tower crane hoisting a concrete bucket, looking north, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Ground-floor forming and the tower crane hoisting a concrete bucket, looking north, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">From Alberta Avenue in May, 2025, the podium was advancing with the taller ground-floor volume fully formed along St Clair and the ground-floor mezzanine taking shape for the future live-work units to the north. Formwork panels are installed for the next level, alongside cured concrete columns on the right, marking the northward projection of the four-storey podium massing that will frame Alberta Avenue.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191513.jpg\" data-entity-uuid=\"insert-display_default-9fe48849-3cf2-453e-8d7f-ac55f4700819\" data-entity-type=\"file\" alt=\"908 St Clair West, Toronto, designed by TACT Architecture for Canderel Residential and KingSett Capital\" title=\"Podium and live-work units progressing along Alberta Avenue, looking southwest, image by UrbanToronto Forum contributor AlbertC\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191513.jpg', true, 'Podium and live-work units progressing along Alberta Avenue, looking southwest, image by UrbanToronto Forum contributor AlbertC'); return false;\"><span class=\"image-description\">Podium and live-work units progressing along Alberta Avenue, looking southwest, image by UrbanToronto Forum contributor AlbertC<\/span><\/p>\n<p dir=\"ltr\">By August, 2025, the structure had climbed to seven storeys, with formwork and decking advancing for the eighth-floor slab. A clear step-back is visible at the sixth level, where parapet walls mark the transition to the upper floors. Along the St Clair West frontage, the projecting seventh-floor balcony slab is poured. Each level is braced by rows of shoring posts, while branded hoarding lines the sidewalk beneath the scaffolded pedestrian canopy.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191511.jpeg\" data-entity-uuid=\"insert-display_default-7449d6f0-70d7-44bf-8d3d-ef8732dce0ba\" data-entity-type=\"file\" alt=\"908 St Clair West, Toronto, designed by TACT Architecture for Canderel Residential and KingSett Capital\" title=\"South elevation fronting St Clair Avenue West, image by UrbanToronto Forum contributor ProjectEnd\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191511.jpeg', true, 'South elevation fronting St Clair Avenue West, image by UrbanToronto Forum contributor ProjectEnd'); return false;\"><span class=\"image-description\">South elevation fronting St Clair Avenue West, image by UrbanToronto Forum contributor ProjectEnd<\/span><\/p>\n<p dir=\"ltr\">This month, looking northwest from St Clair and Alberta avenues, the structure has now topped off. Precast brick-look cladding in grey tones is largely in place from the second to seventh levels, framing punched-window openings fitted with the project\u2019s black-mullioned glazing system and louvres up to the fourth floor. Vertical runs of exposed yellow weatherproofing signal upcoming installation of dark spandrel panels along the St Clair frontage, while completed balcony edges on the seventh floor contrast with the concrete projection at the ninth. To the east, the construction hoist rises beside the crane, and along Alberta Avenue, a blue telescopic boom lift reaches between the third and fourth floors.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191515.jpeg\" data-entity-uuid=\"insert-display_default-a020afc5-07b8-49eb-bdeb-8f1f2d88a90e\" data-entity-type=\"file\" alt=\"908 St Clair West, Toronto, designed by TACT Architecture for Canderel Residential and KingSett Capital\" title=\"Looking northwest from St Clair and Alberta avenues to the topped off structure and ongoing cladding installation, image by UrbanToronto Forum contributor ProjectEnd\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191515.jpeg', true, 'Looking northwest from St Clair and Alberta avenues to the topped off structure and ongoing cladding installation, image by UrbanToronto Forum contributor ProjectEnd'); return false;\"><span class=\"image-description\">Looking northwest from St Clair and Alberta avenues to the topped off structure and ongoing cladding installation, image by UrbanToronto Forum contributor ProjectEnd<\/span><\/p>\n<p dir=\"ltr\">908 St Clair West now rises to 44.8m and will deliver 173 condominium units when complete.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191509.jpeg\" data-entity-uuid=\"insert-display_default-61d9d338-1f20-45c6-bb97-14f8613649dc\" data-entity-type=\"file\" alt=\"908 St Clair West, Toronto, designed by TACT Architecture for Canderel Residential and KingSett Capital\" title=\"Looking northwest to 908 St Clair West, designed by TACT Architecture for Canderel Residential and KingSett Capital\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/59964\/59964-191509.jpeg', true, 'Looking northwest to 908 St Clair West, designed by TACT Architecture for Canderel Residential and KingSett Capital'); return false;\"><span class=\"image-description\">Looking northwest to 908 St Clair West, designed by TACT Architecture for Canderel Residential and KingSett Capital<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/12\/canderel-and-kingsetts-908-st-clair-west-tops.59964\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] 908 St Clair West has topped off in Toronto\u2019s St Clair West Village. The 12-storey mixed-use condominium, designed by &#8230; <a title=\"Canderel and KingSett\u2019s 908 St Clair West Tops Off\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/canderel-and-kingsetts-908-st-clair-west-tops-off\/\" aria-label=\"Read more about Canderel and KingSett\u2019s 908 St Clair West Tops Off\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-33468","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33468","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33468"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33468\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33468"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33468"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33468"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}