{"id":33499,"date":"2025-12-04T23:55:17","date_gmt":"2025-12-05T07:55:17","guid":{"rendered":"https:\/\/essential.construction\/news\/toronto-breaks-ground-on-massive-co-op-housing-development\/"},"modified":"2025-12-04T23:55:17","modified_gmt":"2025-12-05T07:55:17","slug":"toronto-breaks-ground-on-massive-co-op-housing-development","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/toronto-breaks-ground-on-massive-co-op-housing-development\/","title":{"rendered":"Toronto breaks ground on massive co-op housing development"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>TORONTO \u2014 Canada\u2019s largest co-op housing development in a generation has broken ground.<\/p>\n<p><a rel=\"noopener nofollow\" href=\"https:\/\/projects.constructconnect.com\/details\/5059200-eglinton-avenue-mixed-use-development&amp;find_loc=ON-M1K-2P7\" target=\"_blank\">Kennedy Green<\/a>, as it has been coined, is located on city-owned land adjacent to the Kennedy GO and TTC Station and will deliver a total of 612 new homes including affordable and market rent-controlled co-operative homes.<\/p>\n<p>At 2444 Eglinton Ave. E., it will be built on a former commuter parking lot through a partnership between the city, CreateTO and the Co-operative Housing Federation of Toronto. Civic Developments and its partners are providing development management services, a release reads.<\/p>\n<p>Kennedy Green will consist of two co-op buildings with a mix of studios, one-bedroom, two-bedroom and three-bedroom apartments. The project\u2019s application for rezoning was approved in 69 days.<\/p>\n<p>The \u201call-Canadian design team\u201d behind the development includes Vancouver-based Henriquez Partners Architects and Montreal-based landscape architects CCxA.<\/p>\n<p>With a geothermal energy system, the building will support the city\u2019s climate action objectives and achieve Toronto Green Standard Version 4, Tier 2.<\/p>\n<p>The project is also being delivered under the One Planet Living Framework \u2013 a first for Toronto \u2013 to promote sustainable living. The site will also offer 474 square metres of community space as well as 332 square metres of retail space.<\/p>\n<p>Funding for the project is being provided by the federal government, through the Co-operative Housing Development Program and by the city.<\/p>\n<p>This site is one of almost 100 city-owned sites that are either housing-ready or may be unlocked for new housing.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/projects\/2025\/12\/toronto-breaks-ground-on-massive-co-op-housing-development\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] TORONTO \u2014 Canada\u2019s largest co-op housing development in a generation has broken ground. Kennedy Green, as it has been &#8230; <a title=\"Toronto breaks ground on massive co-op housing development\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/toronto-breaks-ground-on-massive-co-op-housing-development\/\" aria-label=\"Read more about Toronto breaks ground on massive co-op housing development\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-33499","post","type-post","status-publish","format-standard","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33499","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33499"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33499\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33499"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33499"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33499"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}