{"id":33547,"date":"2025-12-09T12:22:27","date_gmt":"2025-12-09T20:22:27","guid":{"rendered":"https:\/\/essential.construction\/news\/resubmission-seeks-49-storeys-for-upcoming-concord-park-place-phase\/"},"modified":"2025-12-09T12:22:27","modified_gmt":"2025-12-09T20:22:27","slug":"resubmission-seeks-49-storeys-for-upcoming-concord-park-place-phase","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/resubmission-seeks-49-storeys-for-upcoming-concord-park-place-phase\/","title":{"rendered":"Resubmission Seeks 49 Storeys for Upcoming Concord Park Place Phase"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<td class=\"layout-content\">\n<div class=\"content\" style=\"&#9;visibility: hidden;\" id=\"content\">\n<div class=\"article-top\">\n<div class=\"content-info\"><span class=\"article-category\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/development\" target=\"_blank\">DEVELOPMENT<\/a><\/span>\u00a0<span class=\"article-subcategory\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/!\/planning\" target=\"_blank\">PLANNING<\/a><\/span><br \/><span id=\"article_info\">December 09, 2025 <span class=\"article-author\">by Anthony Teles<\/span><\/span>\u00a0\u00a0<span class=\"content-views\"><img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/views.png?14728329483\" alt=\"-\">\u00a0464\u00a0<\/span><\/div>\n<p><span id=\"article_title\">Resubmission Seeks 49 Storeys for Upcoming Concord Park Place Phase<\/span><\/p>\n<\/div>\n<div class=\"article-content\" id=\"article_content\">\n<div class=\"article-body\" id=\"article_body\">\n<p>A dual-tower proposal for an upcoming phase at Concord Park Place has been revised with a major height and density boost, as <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/concord-adex.7686\" target=\"_blank\">Concord Adex<\/a> returns to the City of Toronto with a resubmission that lifts the top height to 49 storeys. The update reshapes what is known as <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/concord-park-place-block-7.40760\" target=\"_blank\">Block 7<\/a>, a Sheppard Avenue-fronting parcel of the masterplanned community in North York, just to the east of Bessarion station on Sheppard Line 4.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191745.jpg\" data-entity-uuid=\"insert-display_default-42cbb591-5364-400b-bff6-85e0302c30f9\" data-entity-type=\"file\" alt=\"Concord Park Place Block 7, Toronto, designed by DIALOG for Concord Adex\" title=\"Looking southwest to Concord Park Place Block 7, designed by DIALOG for Concord Adex\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191745.jpg', true, 'Looking southwest to Concord Park Place Block 7, designed by DIALOG for Concord Adex'); return false;\"><span class=\"image-description\">Looking southwest to Concord Park Place Block 7, designed by DIALOG for Concord Adex<\/span><\/p>\n<p dir=\"ltr\">The site on the south side of Sheppard Avenue East between Ethennonnhawahstihnen&#8217; Lane and Billes Heights currently houses the presentation centre that Concord Adex has used to sell units in all of their recently built condo buildings here. Immediately south of the presentation is Block 9, where another two towers are planned facing Ethennonnhawahstihnen&#8217; Park in the centre of Concord Park Place. To the immediate west, the City of Toronto&#8217;s Ethennonnhawahstihnen&#8217; Community Centre supports many sports and recreational activities, and has a Toronto Public Library branch. The Wendat word is pronounced Etta-nonna-wasti-nuh, and means &#8220;where they had a good, beautiful life.&#8221;<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191751.jpg\" data-entity-uuid=\"insert-display_default-6ad0fe31-0b4b-454e-b036-6fbe0656be44\" data-entity-type=\"file\" alt=\"Current site, 1001 Sheppard Avenue East, Toronto, Google Maps\" title=\"Looking south to the current site, images retrieved from Google Maps\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191751.jpg', true, 'Looking south to the current site, images retrieved from Google Maps'); return false;\"><span class=\"image-description\">Looking south to the current site, images retrieved from Google Maps<\/span><\/p>\n<p dir=\"ltr\">Concord Park Place was previously the site of a vast Canadian Tire warehouse before that operation moved to Brampton. West and north of the site is Bayview Village, a neighbourhood transitioning from its low-rise interior streets to a growing band of mid- and high-rise buildings along Sheppard Avenue East. Highway 401 runs along Concord Park Place&#8217;s southern edge, and the Richmond Hill GO Train line along its eastern edge.<\/p>\n<p dir=\"ltr\">Plans for Block 7 have undergone several iterations since Concord acquired the former Canadian Tire lands. The block was initially zoned in 2013 to permit 270 units and 25,562m\u00b2 of residential and retail space, forming the basis for a 2020 concept that introduced <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2020\/01\/mid-rise-condo-proposed-sheppard-avenue-concord-park-place.40759\" target=\"_blank\">eight-storey mid-rises<\/a> joined by a six-storey podium, with 25,562m\u00b2 of Gross Floor Area (GFA), including 2,395m\u00b2 of retail and 264 residential units.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191744.jpeg\" data-entity-uuid=\"insert-display_default-1c352780-fa25-4647-b9db-c39060282b6d\" data-entity-type=\"file\" alt=\"Initial mid-rise proposal, Concord Park Place Block 7, Toronto, designed by DIALOG for Concord Adex\" title=\"Looking east to the initial mid-rise proposal, designed by DIALOG for Concord Adex\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191744.jpeg', true, 'Looking east to the initial mid-rise proposal, designed by DIALOG for Concord Adex'); return false;\"><span class=\"image-description\">Looking east to the initial mid-rise proposal, designed by DIALOG for Concord Adex<\/span><\/p>\n<p dir=\"ltr\">A 2023 resubmission replaced that with a pair of 28- and 36-storey towers, which topped out at 91.9m and 115.8m. There would have been 53,723m\u00b2 of residential space for 800 units, a total GFA of 56,108m\u00b2, and a Floor Space Index (FSI) of 8.51 times coverage of the 6,592m\u00b2 block.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191746.jpg\" data-entity-uuid=\"insert-display_default-b476c286-c828-4a04-bcc3-80a023c82bf3\" data-entity-type=\"file\" alt=\"Previous plan, Concord Park Place Block 7, Toronto, designed by DIALOG for Concord Adex\" title=\"Looking southwest to the previous plan, designed by DIALOG for Concord Adex\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191746.jpg', true, 'Looking southwest to the previous plan, designed by DIALOG for Concord Adex'); return false;\"><span class=\"image-description\">Looking southwest to the previous plan, designed by DIALOG for Concord Adex<\/span><\/p>\n<p dir=\"ltr\">The current filing represents the second resubmission of the Official Plan and Zoning By-law Amendment applications. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/dialog.23077\" target=\"_blank\">DIALOG<\/a>, the new plan&#8217;s towers rise to 46 and 49 storeys, or 153.6m and 162.75m, anchored by a six-storey podium. Residential space climbs to 77,424m\u00b2, and total GFA to 79,573m\u00b2, the FSI rising to 12.18. Retail space has been reduced slightly to 2,149m\u00b2. The housing program grows to 1,184 units, its new mix expanding the percentage of two- and three-bedroom layouts.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191747.jpg\" data-entity-uuid=\"insert-display_default-aebbc539-29dd-4905-ae33-8755df0dba24\" data-entity-type=\"file\" alt=\"Site plan, Concord Park Place Block 7, Toronto, designed by DIALOG for Concord Adex\" title=\"Site plan, designed by DIALOG for Concord Adex\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191747.jpg', true, 'Site plan, designed by DIALOG for Concord Adex'); return false;\"><span class=\"image-description\">Site plan, designed by DIALOG for Concord Adex<\/span><\/p>\n<p dir=\"ltr\">Indoor amenities would total 1,572m\u00b2, up from 1,200m\u00b2, while outdoor amenities would total 1,785m\u00b2, reduced from 1,937m\u00b2. Each tower would contain four elevators, yielding one cab per 148 units, indicating high-speed motors would be required for adequate service, with strains to the system whenever an elevator was out of service.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191748.jpg\" data-entity-uuid=\"insert-display_default-8953d42a-501e-4199-9b24-bc36bfc4be3d\" data-entity-type=\"file\" alt=\"Ground floor plan, Concord Park Place Block 7, Toronto, designed by DIALOG for Concord Adex\" title=\"Ground floor plan, designed by DIALOG for Concord Adex\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191748.jpg', true, 'Ground floor plan, designed by DIALOG for Concord Adex'); return false;\"><span class=\"image-description\">Ground floor plan, designed by DIALOG for Concord Adex<\/span><\/p>\n<p dir=\"ltr\">Below grade, the garage would now extend to four levels, compared to three previously. Parking supply increases from 453 to 605 spaces, consisting of 412 resident stalls, 193 non-residential spaces, and one car-share stall. Bicycle parking grows from 610 to 947 spaces, broken down into 823 long-term residential spaces, 108 short-term spaces, and 16 spaces serving the retail component.<\/p>\n<p dir=\"ltr\">The site is directly beside the main entrance to Bessarion station. The Sheppard 85 bus stops at the corner of Sheppard and Billes Heights. Leslie Station lies about 650m to the east, while the entrance to Oriole GO station is approximately 850m to the southeast. Metrolinx plans to relocate Oriole GO northwards to just beside of Leslie station, and is also undergoing a study for the Sheppard Line 4 Subway Extension, which would improve east\u2013west connectivity across North York and into Scarborough. Cycle lanes are located on Esther Shiner Boulevard to the south, connecting to the nearby Don River trails.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191750.jpg\" data-entity-uuid=\"insert-display_default-0db3d1cc-c36f-4422-8dea-8947c48d3493\" data-entity-type=\"file\" alt=\"Aerial view, Concord Park Place Block 7, Toronto\" title=\"An aerial view of the site and surrounding area, image from submission to City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191750.jpg', true, 'An aerial view of the site and surrounding area, image from submission to City of Toronto'); return false;\"><span class=\"image-description\">An aerial view of the site and surrounding area, image from submission to City of Toronto<\/span><\/p>\n<p dir=\"ltr\">\u00a0<\/p>\n<p dir=\"ltr\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/concord-park-place-block-9.55644\" target=\"_blank\">Block 9<\/a> immediately to the south of Block 7 is proposed at 39 and 44 storeys. To its east, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/kings-landing-concord-park-place.34352\" target=\"_blank\">King\u2019s Landing at Concord Park Place<\/a> with three towers between 19 and 31 storeys is currently wrapping up the construction process. Further east, development of the community continues with proposals at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/1125-sheppard-avenue-east.55642\" target=\"_blank\">1125 Sheppard East<\/a> for 48 and 52 storeys, and at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/1181-sheppard-avenue-east.40537\" target=\"_blank\">1181 Sheppard East<\/a> for 32 and 38 storeys. Beyond Concord Park Place, a build-out of mid- and high-rise density is occurring gradually along Sheppard Avenue East. West of the site, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/680-sheppard-east.39928\" target=\"_blank\">680 Sheppard East<\/a> would introduce 12- and 22-storey buildings, alongside a 30-storey tower at <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/635-sheppard-east.46084\" target=\"_blank\">635 Sheppard East<\/a> and the two-tower <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/burbank-heights.49945\" target=\"_blank\">Burbank Heights<\/a> plan at 28 and 32 storeys.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191749.jpg\" data-entity-uuid=\"insert-display_default-fc12a81c-ac53-4a66-88e5-2c5f2296dacd\" data-entity-type=\"file\" alt=\"Concord Park Place Master Plan, Toronto, Concord Adex\" title=\"Concord Park Place Master Plan, image from submission to City of Toronto\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60003\/60003-191749.jpg', true, 'Concord Park Place Master Plan, image from submission to City of Toronto'); return false;\"><span class=\"image-description\">Concord Park Place Master Plan, image from submission to City of Toronto<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<\/div>\n<div class=\"articles\" id=\"articles\">\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/more-content.png?14728329483\" onclick=\"loadArticles();\" alt=\"-\"><\/p><\/div>\n<\/div>\n<\/td>\n<td class=\"trending-column\" style=\"display: none;\" id=\"trending_block\"\/>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/12\/resubmission-seeks-49-storeys-upcoming-concord-park-place-phase.60003\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] DEVELOPMENT\u00a0PLANNINGDecember 09, 2025 by Anthony Teles\u00a0\u00a0\u00a0464\u00a0 Resubmission Seeks 49 Storeys for Upcoming Concord Park Place Phase A dual-tower proposal &#8230; <a title=\"Resubmission Seeks 49 Storeys for Upcoming Concord Park Place Phase\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/resubmission-seeks-49-storeys-for-upcoming-concord-park-place-phase\/\" aria-label=\"Read more about Resubmission Seeks 49 Storeys for Upcoming Concord Park Place Phase\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-33547","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33547","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33547"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33547\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33547"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33547"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33547"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}