{"id":33659,"date":"2025-12-18T00:39:34","date_gmt":"2025-12-18T08:39:34","guid":{"rendered":"https:\/\/essential.construction\/news\/cladding-progresses-at-400-king-west-in-the-entertainment-district\/"},"modified":"2025-12-18T00:39:34","modified_gmt":"2025-12-18T08:39:34","slug":"cladding-progresses-at-400-king-west-in-the-entertainment-district","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/cladding-progresses-at-400-king-west-in-the-entertainment-district\/","title":{"rendered":"Cladding Progresses at 400 King West in the Entertainment District"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Since UrbanToronto\u2019s last update in <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2025\/08\/400-king-west-tops-cladding-advancing.59293\" target=\"_blank\">August, 2025<\/a>, when <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/400-king-west.27748\" target=\"_blank\">400 King West<\/a> was topping off, cladding installation has advanced across the building envelope. Rising 49 storeys at the intersection of King Street West and Charlotte Street in Toronto\u2019s Entertainment District, the mixed-use condo tower is designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bdp-quadrangle.8043\" target=\"_blank\">BDP Quadrangle<\/a> for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/plaza.7794\" target=\"_blank\">Plaza<\/a>.<\/p>\n<p dir=\"ltr\">In September, 2025, this close-up captures the thicker roof slab along the south elevation formed below what may be an elevator overrun, not included in the building&#8217;s plans nor renderings at the time of approval. Unlike other condo towers in Toronto, the three uppermost floors here have a mixture of single and triple-storey penthouse units, the upper two storeys having some space dedicated to HVAC equipment.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192185.jpg\" data-entity-uuid=\"insert-display_default-78181a36-af06-48fc-863d-9e0a13bb7ce4\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"A close-up view of the rooftop slab along the south elevation, image by UrbanToronto Forum contributor AHK, image by UrbanToronto Forum contributor AHK\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192185.jpg', true, 'A close-up view of the rooftop slab along the south elevation, image by UrbanToronto Forum contributor AHK, image by UrbanToronto Forum contributor AHK'); return false;\"><span class=\"image-description\">A close-up view of the rooftop slab along the south elevation, image by UrbanToronto Forum contributor AHK, image by UrbanToronto Forum contributor AHK<\/span><\/p>\n<p dir=\"ltr\">Looking west from King Street, a strip of rectangular paint swatches has been applied to the exposed concrete wall along the east elevation behind the Shoppers Drug Mart. The samples test a range of tones directly on the concrete wall, illustrating finish selection being evaluated under real-world lighting before choosing one for full application. Above, white precast concrete fins rise to the 39th floor on the east elevation. The window wall system is installed to the 31st floor on the east side, with dark mullions, black spandrel panels, and louvres.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192187.jpg\" data-entity-uuid=\"insert-display_default-38b9351a-27d9-4675-9be1-050ac5529c80\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"Looking west to podium paint swatches for the concrete wall on the east elevation, image by UrbanToronto Forum contributor AHK\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192187.jpg', true, 'Looking west to podium paint swatches for the concrete wall on the east elevation, image by UrbanToronto Forum contributor AHK'); return false;\"><span class=\"image-description\">Looking west to podium paint swatches for the concrete wall on the east elevation, image by UrbanToronto Forum contributor AHK<\/span><\/p>\n<p dir=\"ltr\">One month later, this view confirms completion of the podium finish selection, with the exposed concrete wall now coated in a lighter reddish-brown tone that aligns with the brick cladding installed above and along the south elevation. The tower\u2019s white panels extend to the 45th floor, while the window wall system has climbed to the 35th floor.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192183.jpg\" data-entity-uuid=\"insert-display_default-32bc8fa3-4bd3-4069-9536-4b394ee21a60\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"Completed podium painting and progressing cladding for the tower, looking northwest, image by UrbanToronto Forum contributor Riseth\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192183.jpg', true, 'Completed podium painting and progressing cladding for the tower, looking northwest, image by UrbanToronto Forum contributor Riseth'); return false;\"><span class=\"image-description\">Completed podium painting and progressing cladding for the tower, looking northwest, image by UrbanToronto Forum contributor Riseth<\/span><\/p>\n<p dir=\"ltr\">Meanwhile, progress continues along the west elevation, where areas of previously exposed green weatherproofing at the podium have been progressively replaced with finished cladding. Brick-faced precast piers now frame large glazed openings fitted with the dark window wall system, while upper podium levels still reveal sections of bare concrete balcony slabs. At grade, the podium\u2019s retail and residential entrances will be framed with copper-toned metal panelling.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192184.jpeg\" data-entity-uuid=\"insert-display_default-3d16bcd2-fe67-4b7d-a3e0-3b5fefd2f5f8\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"Looking northeast from King Street West to the construction hoist at the southwest corner, image by UrbanToronto Forum contributor ProjectEnd, image by UrbanToronto Forum contributor AHK\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192184.jpeg', true, 'Looking northeast from King Street West to the construction hoist at the southwest corner, image by UrbanToronto Forum contributor ProjectEnd, image by UrbanToronto Forum contributor AHK'); return false;\"><span class=\"image-description\">Looking northeast from King Street West to the construction hoist at the southwest corner, image by UrbanToronto Forum contributor ProjectEnd, image by UrbanToronto Forum contributor AHK<\/span><\/p>\n<p dir=\"ltr\">This distant view in November, 2025 shows the elevator overrun now fully formed in concrete. Along the south elevation, the tower\u2019s white precast rises to three floors shy of the full residential height \u2014 these penthouse floors will boast a special cladding treatment when complete \u2014 while the window wall system is eight storeys below that, interspersed with vertical stacks of projecting concrete balcony slabs.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192182.jpeg\" data-entity-uuid=\"insert-display_default-1aaa6937-7354-472f-9d1b-3f1e5ee7156b\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"Looking northeast to cladding installation on the south elevation, image by UrbanToronto Forum contributor prtk.g\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192182.jpeg', true, 'Looking northeast to cladding installation on the south elevation, image by UrbanToronto Forum contributor prtk.g'); return false;\"><span class=\"image-description\">Looking northeast to cladding installation on the south elevation, image by UrbanToronto Forum contributor prtk.g<\/span><\/p>\n<p dir=\"ltr\">Looking southeast this month, the north elevation shows 400 King West\u2019s bright vertical presence within the skyline, its white precast cladding contrasting with the darker-toned facades of its neighbours. The window wall system is now installed to approximately the 40th floor. Above the 46th floor, vertical strips of white precast mark the termination of the white cladding. The three uppermost levels will offer a distinct crown, articulated with aluminum panel cladding finished in Acrynar russet.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192181.jpg\" data-entity-uuid=\"insert-display_default-1eef8121-3893-46a7-a898-450b9733dd79\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"A distant view looking southeast to cladding progress on the north elevation, image by UrbanToronto Forum contributor tstormers\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192181.jpg', true, 'A distant view looking southeast to cladding progress on the north elevation, image by UrbanToronto Forum contributor tstormers'); return false;\"><span class=\"image-description\">A distant view looking southeast to cladding progress on the north elevation, image by UrbanToronto Forum contributor tstormers<\/span><\/p>\n<p dir=\"ltr\">400 King West stands 164.58m and will deliver 630 condominium units.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192180.jpg\" data-entity-uuid=\"insert-display_default-34bea707-55d5-44b9-8889-9fc9d3445908\" data-entity-type=\"file\" alt=\"400 King West, Toronto, designed by BDP Quadrangle for Plaza\" title=\"A high-angle view looking northeast to 400 King West, designed by BDP Quadrangle for Plaza\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2025\/12\/60075\/60075-192180.jpg', true, 'A high-angle view looking northeast to 400 King West, designed by BDP Quadrangle for Plaza'); return false;\"><span class=\"image-description\">A high-angle view looking northeast to 400 King West, designed by BDP Quadrangle for Plaza<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bdp-quadrangle.8043\" target=\"_blank\">BDP Quadrangle<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bousfields.7652\" target=\"_blank\">Bousfields<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/gradient-wind-engineers-scientists.43829\" target=\"_blank\">Gradient Wind Engineers &amp; Scientists<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/groundwater-environmental-management-services-inc-gems.45990\" target=\"_blank\">Groundwater Environmental Management Services Inc. (GEMS)<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/hgc-noise-vibration-acoustics.44108\" target=\"_blank\">HGC Noise Vibration Acoustics<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/jablonsky-ast-and-partners.35673\" target=\"_blank\">Jablonsky, Ast and Partners<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/janet-rosenberg-studio.8158\" target=\"_blank\">Janet Rosenberg &amp; Studio<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/live-patrol-inc.30547\" target=\"_blank\">Live Patrol Inc.<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/plaza.7794\" target=\"_blank\">Plaza<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rebar-enterprises-inc.44797\" target=\"_blank\">Rebar Enterprises Inc<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/fence-people.48575\" target=\"_blank\">The Fence People<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/u31.8143\" target=\"_blank\">U31<\/a><\/td>\n<\/tr>\n<\/table>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2025\/12\/cladding-progresses-400-king-west-entertainment-district.60075\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Since UrbanToronto\u2019s last update in August, 2025, when 400 King West was topping off, cladding installation has advanced across &#8230; <a title=\"Cladding Progresses at 400 King West in the Entertainment District\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/cladding-progresses-at-400-king-west-in-the-entertainment-district\/\" aria-label=\"Read more about Cladding Progresses at 400 King West in the Entertainment District\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-33659","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33659","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33659"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33659\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33659"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33659"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}