{"id":33844,"date":"2026-01-09T01:22:14","date_gmt":"2026-01-09T09:22:14","guid":{"rendered":"https:\/\/essential.construction\/news\/student-rooms-builder-cancels-london-and-defers-bristol-projects\/"},"modified":"2026-01-09T01:22:14","modified_gmt":"2026-01-09T09:22:14","slug":"student-rooms-builder-cancels-london-and-defers-bristol-projects","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/student-rooms-builder-cancels-london-and-defers-bristol-projects\/","title":{"rendered":"Student rooms builder cancels London and defers Bristol projects"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The country\u2019s biggest student accommodation developer this morning said it had deferred delivery of its 500-bed Freestone Island scheme in Bristol while it explores options to secure \u201cbest value\u201d from the project.<\/p>\n<p>The move releases around \u00a355m of capital that had been earmarked for construction.<\/p>\n<p>The group has also walked away from its flagship \u00a3147m TP Paddington scheme in London, despite securing planning permission on appeal.<\/p>\n<p>It said this morning that the 605-bed project was no longer financially viable against Unite\u2019s return hurdles, with an extended delivery programme compounding the challenges faced by the big project.<\/p>\n<p>Unite said the decision to abandon the project would lead to a \u00a310m exceptional write-off of planning costs.<\/p>\n<p>In a year-end trading update, chief executive Joe Lister said the business was still trading in line with expectations, despite a slower start to the next sales cycle.<\/p>\n<p>\u201cSales progress to date is consistent with our guidance for occupancy of 93\u201396% and rental growth of 2\u20133% for the 2026\/27 academic year,\u201d he said.<\/p>\n<p>\u201cOur conversations with our university partners show continued demand for our high-quality, value-for-money accommodation, notwithstanding a slower start to the 2026\/27 sales cycle.\u201d<\/p>\n<p>Alongside the development pullback, Unite has unveiled a \u00a3100m share buyback, funded initially through reduced off-campus development activity.<\/p>\n<p>Lister said: \u201cConsistent with the revised capital allocation policy, we are today launching a \u00a3100m share buyback programme to return surplus capital to shareholders.<\/p>\n<p>\u201cThis will initially be funded through reduced off-campus development activity, which maintains our high-quality balance sheet.\u201d<\/p>\n<p>He added that the group would continue to invest selectively where risk-adjusted returns stack up, with further surplus capital expected as planned asset disposals progress.<\/p>\n<p>The revised strategy underlines a wider slowdown in new PBSA supply across the UK, with Unite pointing to worsening scheme economics and regulatory drag.<\/p>\n<p>The developer said viable new schemes now require minimum rents of around \u00a3230 per week, while Building Safety Act gateways were adding six to 12 months to delivery programmes.<\/p>\n<div id=\"attachment_504681\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/1754653926592-1200x828-1.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-504681 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/1754653926592-1200x828-1.jpg\" alt=\"-\" width=\"1200\" height=\"828\"><\/a><\/p>\n<p class=\"wp-caption-text\">Freestone Island Temple Meads project was caught up in the Building Safety Regulator logjam for nearly a year.<\/p>\n<\/div>\n<p>Planning activity has also dried up, with 2025 seeing the lowest number of PBSA planning submissions in the past five years.<\/p>\n<p>Industry data from CBRE, Cushman &amp; Wakefield and Unite shows net new supply growth falling sharply, with deliveries in 2026 amounting to just a low-single-digit percentage of existing stock and further easing expected into 2027.<\/p>\n<p>Unite said its focus was now firmly on operational performance and capital discipline, which it believed would support a return to earnings growth from 2027.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/01\/09\/student-rooms-builder-cancels-london-and-defers-bristol-projects\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The country\u2019s biggest student accommodation developer this morning said it had deferred delivery of its 500-bed Freestone Island scheme &#8230; <a title=\"Student rooms builder cancels London and defers Bristol projects\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/student-rooms-builder-cancels-london-and-defers-bristol-projects\/\" aria-label=\"Read more about Student rooms builder cancels London and defers Bristol projects\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-33844","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33844","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33844"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33844\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}