{"id":33896,"date":"2026-01-13T13:35:15","date_gmt":"2026-01-13T21:35:15","guid":{"rendered":"https:\/\/essential.construction\/news\/magellan-centre-seniors-housing-amd-long-term-care-facility-nears-topping-off\/"},"modified":"2026-01-13T13:35:15","modified_gmt":"2026-01-13T21:35:15","slug":"magellan-centre-seniors-housing-amd-long-term-care-facility-nears-topping-off","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/magellan-centre-seniors-housing-amd-long-term-care-facility-nears-topping-off\/","title":{"rendered":"Magellan Centre Seniors Housing amd Long-Term Care Facility Nears Topping Off"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Rising just north of Lansdowne station, the seven-storey <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/magellan-centre.45052\" target=\"_blank\">Magellan Centre<\/a> is approaching topping off in Toronto\u2019s Bloordale area. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/snyder-architects-inc.26766\" target=\"_blank\">Snyder Architects Inc.<\/a> for CreateTO and <a rel=\"nofollow noopener\" href=\"https:\/\/magellancommunitycharities.ca\/\" target=\"_blank\">Magellan Community Charities<\/a>, the seniors centre project is part of a City-led effort to accelerate the delivery of affordable housing through programs that mobilize public land, with a portion of this former TTC carhouse and garage site being leased out to the developers. Located at 640 Lansdowne Avenue, the development combines affordable rental housing with a long-term care facility, delivering deeply needed senior care and housing near transit.<\/p>\n<p dir=\"ltr\">Looking northeast in August, 2025, the absence of below-grade levels allowed slab-on-grade construction to advance quickly. Two cranes, erected in February and March, stand near the north and south ends of the building site, and the structure has risen to one storey, with formwork in place for portions of the second floor. The west side of the site is being used for materials staging, deliveries, and site trailers.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192824.jpg\" data-entity-uuid=\"insert-display_default-745ac31b-5dc8-4e83-a158-b1e0c45555ae\" data-entity-type=\"file\" alt=\"Magellan Centre, Toronto, designed by Snyder Architects Inc for CreateTO and\u00a0Magellan Community Charities\" title=\"Looking northeast to the ground-floor formwork and staging on the west end of the site, image by UrbanToronto Forum contributor A Torontonian Now\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192824.jpg', true, 'Looking northeast to the ground-floor formwork and staging on the west end of the site, image by UrbanToronto Forum contributor A Torontonian Now'); return false;\"><span class=\"image-description\">Looking northeast to the ground-floor formwork and staging on the west end of the site, image by UrbanToronto Forum contributor A Torontonian Now<\/span><\/p>\n<p dir=\"ltr\">Seen from across Paton Road in September, 2025, the structure stands three storeys at the south end, with formwork in place for the fourth-floor slab pour. Concrete columns and shear walls are seen at grade, while further north, rebar and column forms rise for the third floor. The building\u2019s long mass is articulated into two primary volumes at the north and south ends, separated by a recessed central alcove that will accommodate the main entrance.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192829.jpg\" data-entity-uuid=\"insert-display_default-bae3e77a-f9f6-4f34-8299-fd336683f8bd\" data-entity-type=\"file\" alt=\"Magellan Centre, Toronto, designed by Snyder Architects Inc for CreateTO and\u00a0Magellan Community Charities\" title=\"The south elevation fronting Paton Street, image by UrbanToronto Forum contributor HousingNowTO\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192829.jpg', true, 'The south elevation fronting Paton Street, image by UrbanToronto Forum contributor HousingNowTO'); return false;\"><span class=\"image-description\">The south elevation fronting Paton Street, image by UrbanToronto Forum contributor HousingNowTO<\/span><\/p>\n<p dir=\"ltr\">By December, 2025, the north end rose five storeys, next to low-rise commercial and residential buildings. White tarp shields crew on the the uppermost level from the elements.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192825.jpg\" data-entity-uuid=\"insert-display_default-ae475348-3489-47d6-b526-14cd58f65a3d\" data-entity-type=\"file\" alt=\"Magellan Centre, Toronto, designed by Snyder Architects Inc for CreateTO and\u00a0Magellan Community Charities\" title=\"Looking south from Lansdowne Avenue to the structure rising above the adjacent low-rise commercial buildings, image by UrbanToronto Forum contributor AlbertC\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192825.jpg', true, 'Looking south from Lansdowne Avenue to the structure rising above the adjacent low-rise commercial buildings, image by UrbanToronto Forum contributor AlbertC'); return false;\"><span class=\"image-description\">Looking south from Lansdowne Avenue to the structure rising above the adjacent low-rise commercial buildings, image by UrbanToronto Forum contributor AlbertC<\/span><\/p>\n<p dir=\"ltr\">Looking southwest, formwork projects outward for the seventh-floor slab pour. Balconies and step-backs articulate the massing.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192826.jpg\" data-entity-uuid=\"insert-display_default-7222b36d-2b58-4ab7-8d39-4c78fbb0dd71\" data-entity-type=\"file\" alt=\"Magellan Centre, Toronto, designed by Snyder Architects Inc for CreateTO and\u00a0Magellan Community Charities\" title=\"Looking southwest to the seventh-floor slab decking in place, image by UrbanToronto Forum contributor AlbertC\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192826.jpg', true, 'Looking southwest to the seventh-floor slab decking in place, image by UrbanToronto Forum contributor AlbertC'); return false;\"><span class=\"image-description\">Looking southwest to the seventh-floor slab decking in place, image by UrbanToronto Forum contributor AlbertC<\/span><\/p>\n<p dir=\"ltr\">Meanwhile, the south elevation rises to five storeys, with the first walls in place for the sixth floor. Regularly spaced concrete columns define the ground floor, framing an opening for the pedestrian passageway that will run along the south side of the building and connect through the site. Mid-block, the building\u2019s massing steps back to form the recessed entrance alcove.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192827.jpg\" data-entity-uuid=\"insert-display_default-394d1b8d-1b94-490c-88c9-f2b2b3e0602f\" data-entity-type=\"file\" alt=\"Magellan Centre, Toronto, designed by Snyder Architects Inc for CreateTO and\u00a0Magellan Community Charities\" title=\"Looking northwest to the ground-floor passageway along the south elevation, image by UrbanToronto Forum contributor AlbertC\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192827.jpg', true, 'Looking northwest to the ground-floor passageway along the south elevation, image by UrbanToronto Forum contributor AlbertC'); return false;\"><span class=\"image-description\">Looking northwest to the ground-floor passageway along the south elevation, image by UrbanToronto Forum contributor AlbertC<\/span><\/p>\n<p dir=\"ltr\">Seen this month, concrete forming for the Magellan Centre is nearly finished, with work underway for the mechanical penthouse. On the north elevation, corner notches above the third floor are evident, while formwork above will square off the roof, cantilevering the rooftop slab at the corners.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192828.jpg\" data-entity-uuid=\"insert-display_default-05b502b1-244a-497f-bd7e-7bffb0d9bb9c\" data-entity-type=\"file\" alt=\"Magellan Centre, Toronto, designed by Snyder Architects Inc for CreateTO and\u00a0Magellan Community Charities\" title=\"Decking in place for the rooftop slab, looking southwest, image by UrbanToronto Forum contributor AlbertC\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60174\/60174-192828.jpg', true, 'Decking in place for the rooftop slab, looking southwest, image by UrbanToronto Forum contributor AlbertC'); return false;\"><span class=\"image-description\">Decking in place for the rooftop slab, looking southwest, image by UrbanToronto Forum contributor AlbertC<\/span><\/p>\n<p dir=\"ltr\">The exterior will be finished with a combination of buff and dark brown brick masonry, and off-white and grey-toned aluminum panels. Window wall and glass balcony guards will be complemented by a metal-trimmed canopy at the main entrance, while roof-level sight screens will conceal mechanical equipment.<\/p>\n<p dir=\"ltr\">The Magellan Centre will stand 29.64m and deliver 57 affordable rental housing units for seniors, alongside 256 long-term care beds.<\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bousfields.7652\" target=\"_blank\">Bousfields<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/quasar-consulting-group.44431\" target=\"_blank\">Quasar Consulting Group<\/a><\/td>\n<\/tr>\n<\/table>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2026\/01\/magellan-centre-seniors-housing-amd-long-term-care-facility-nears-topping.60174\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Rising just north of Lansdowne station, the seven-storey Magellan Centre is approaching topping off in Toronto\u2019s Bloordale area. Designed &#8230; <a title=\"Magellan Centre Seniors Housing amd Long-Term Care Facility Nears Topping Off\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/magellan-centre-seniors-housing-amd-long-term-care-facility-nears-topping-off\/\" aria-label=\"Read more about Magellan Centre Seniors Housing amd Long-Term Care Facility Nears Topping Off\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-33896","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33896","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33896"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33896\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33896"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33896"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}