{"id":33979,"date":"2026-01-20T13:49:05","date_gmt":"2026-01-20T21:49:05","guid":{"rendered":"https:\/\/essential.construction\/news\/excavation-continues-at-peter-gilgan-mississauga-hospital\/"},"modified":"2026-01-20T13:49:05","modified_gmt":"2026-01-20T21:49:05","slug":"excavation-continues-at-peter-gilgan-mississauga-hospital","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/excavation-continues-at-peter-gilgan-mississauga-hospital\/","title":{"rendered":"Excavation Continues at Peter Gilgan Mississauga Hospital"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Excavation has been advancing at the <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/peter-gilgan-mississauga-hospital.46844\" target=\"_blank\">Peter Gilgan Mississauga Hospital<\/a> site following the official ground breaking ceremony in <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2025\/06\/60m-gilgan-donation-propels-new-tower-st-josephs-health-centre-work-starts-mississauga.58873\" target=\"_blank\">June, 2025<\/a>, which marked the start of major construction for Ontario\u2019s largest hospital project ever. Rising at 100 Queensway West on the southwest corner of Hurontario Street and Queensway West, the project will deliver a 22-storey acute-care hospital alongside an 8-storey above-grade parking structure. The facility is being developed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/trillium-health-partners.44532\" target=\"_blank\">Trillium Health Partners<\/a> and designed by a multi-firm team of <a rel=\"nofollow noopener\" roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/stantec.8062\" target=\"_blank\">Stantec<\/a><span roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\">, <\/span><a rel=\"nofollow noopener\" roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/adamson-associates-architects.7951\" target=\"_blank\">Adamson Associates Architects<\/a><span roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\">, <\/span><a rel=\"nofollow noopener\" roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/parkin-architects-limited.48873\" target=\"_blank\">Parkin Architects Limited<\/a><span roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\">, and <\/span><a rel=\"nofollow noopener\" roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/jodoin-lamarre-pratte-architectes-inc.59307\" target=\"_blank\">Jodoin Lamarre Pratte Architectes Inc<\/a>.\u00a0<\/p>\n<p dir=\"ltr\">Concerns around cost have featured prominently in public reporting, particularly following the release of findings from Ontario\u2019s Auditor General. Media coverage has cited an all-in project cost of roughly $14 billion, a figure that reflects not only design and construction, but also financing, lifecycle maintenance, hospital outfitting, and long-term operations over 30 years, rather than construction alone, as outlined in the Auditor General\u2019s report.<\/p>\n<p dir=\"ltr\">Construction costs alone are estimated in the range of $7 billion to $8 billion, translating to a very high cost per square foot for the approximately 2.8 million ft\u00b2 facility. The Auditor General highlighted risks associated with the project\u2019s procurement model, noting that the hospital advanced with a single bidder.<\/p>\n<p dir=\"ltr\">So far, work has been limited to ground preparations. In October, 2025, as seen below, excavation was well underway, with a substantial below-grade pit carved out across the northern portion of the site. Multiple shoring rigs indicate active installation of drilled shoring. In the foreground and central staging area, stockpiled materials are organized, while dump trucks and excavators circulate through the site. To the south, a portion of the former surface parking lot remains temporarily intact, accommodating site trailers and parked vehicles.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193119.jpg\" data-entity-uuid=\"insert-display_default-c13537ee-0b69-4755-949a-227e11a022b6\" data-entity-type=\"file\" alt=\"Peter Gilgan Mississauga Hospital, designed by Stantec, Adamson Associates Architects, Parkin Architects Limited, and Jodoin Lamarre Pratte Architectes Inc for Trillium Health Partners\" title=\"An elevated view looking east across the excavation pit to shoring rigs and staged materials, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193119.jpg', true, 'An elevated view looking east across the excavation pit to shoring rigs and staged materials, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">An elevated view looking east across the excavation pit to shoring rigs and staged materials, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">At grade, looking north, perimeter shoring is visible in the form of regularly spaced steel soldier piles installed along the excavation edge. These vertical members have been drilled into pre-bored shafts rather than driven, to limit vibration impacts on nearby buildings and ongoing operations at the existing hospital, just to the west. The exposed pile tops, marked for identification and alignment, define the retained excavation line that will later receive lagging.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193118.jpg\" data-entity-uuid=\"insert-display_default-bf266235-a327-4ab3-8dec-44c5e62b1b60\" data-entity-type=\"file\" alt=\"Peter Gilgan Mississauga Hospital, designed by Stantec, Adamson Associates Architects, Parkin Architects Limited, and Jodoin Lamarre Pratte Architectes Inc for Trillium Health Partners\" title=\"Looking northeast to drilled soldier piles installed along the excavation perimeter, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193118.jpg', true, 'Looking northeast to drilled soldier piles installed along the excavation perimeter, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking northeast to drilled soldier piles installed along the excavation perimeter, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">This November, 2025 image captures temporary road realignments and access reconfiguration adjacent to the existing hospital buildings. Newly paved internal roadways, fresh curb lines, and marked drop-off and service zones are nearing completion, enabling the opening of replacement routes so existing roads can be closed and absorbed into the expanding construction zone. Temporary fencing, jersey barriers, and controlled pedestrian corridors separate live hospital operations from active work areas.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193117.jpg\" data-entity-uuid=\"insert-display_default-26828faa-6359-48fc-a9a9-95f6c2e98d59\" data-entity-type=\"file\" alt=\"Peter Gilgan Mississauga Hospital, designed by Stantec, Adamson Associates Architects, Parkin Architects Limited, and Jodoin Lamarre Pratte Architectes Inc for Trillium Health Partners\" title=\"Looking northwest to the existing hospital and construction on new internal roads and access routes, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193117.jpg', true, 'Looking northwest to the existing hospital and construction on new internal roads and access routes, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking northwest to the existing hospital and construction on new internal roads and access routes, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">This comprehensive drone shot in December, 2025 shows the excavation progress across the full site, with Mississauga City Centre&#8217;s skyline seen on the distant horizon to the northwest. Temporary dirt paths slope into the pit from both the north and south ends. Multiple excavators are seen across the centre of the site. Along the perimeter, orange tarp lines the shoring system, with segmented retention elements particularly visible along the west edge, while the southeast corner at grade remains active with staged materials.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193114.jpeg\" data-entity-uuid=\"insert-display_default-fc7da533-564e-42bb-a1b2-926b567edf14\" data-entity-type=\"file\" alt=\"Peter Gilgan Mississauga Hospital, designed by Stantec, Adamson Associates Architects, Parkin Architects Limited, and Jodoin Lamarre Pratte Architectes Inc for Trillium Health Partners\" title=\"A wide drone view looking north showing the full excavation footprint, image by UrbanToronto Forum contributor Tim MacDonald\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193114.jpeg', true, 'A wide drone view looking north showing the full excavation footprint, image by UrbanToronto Forum contributor Tim MacDonald'); return false;\"><span class=\"image-description\">A wide drone view looking north showing the full excavation footprint, image by UrbanToronto Forum contributor Tim MacDonald<\/span><\/p>\n<p dir=\"ltr\">A few days later, this closer view shows the broad earthen ramp descending from grade at the north end. At grade, we see smaller blue tracked excavators, while larger green and yellow excavators are seen in the pit. Along the right-hand perimeter, a clearly defined row of tiebacks anchors the shoring system.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193115.jpg\" data-entity-uuid=\"insert-display_default-8323d45e-8fc5-4b65-9a9e-392f1355398e\" data-entity-type=\"file\" alt=\"Peter Gilgan Mississauga Hospital, designed by Stantec, Adamson Associates Architects, Parkin Architects Limited, and Jodoin Lamarre Pratte Architectes Inc for Trillium Health Partners\" title=\"Looking northeast to the excavation depth and dirt ramp at the north end, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193115.jpg', true, 'Looking northeast to the excavation depth and dirt ramp at the north end, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking northeast to the excavation depth and dirt ramp at the north end, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">Excavation currently continues across most of the site for the two underground levels. A newly opened internal driveway and drop-off area is now in service, allowing the closure of the former access road to accommodate continued construction of the new hospital. In the southwest corner at grade, we see concrete barriers, staged materials, and temporary site infrastructure.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193116.jpg\" data-entity-uuid=\"insert-display_default-750ce43f-5058-4b0e-9d6e-1e0f24828557\" data-entity-type=\"file\" alt=\"Peter Gilgan Mississauga Hospital, designed by Stantec, Adamson Associates Architects, Parkin Architects Limited, and Jodoin Lamarre Pratte Architectes Inc for Trillium Health Partners\" title=\"Looking north to the new driveway and drop-off area at the west end, image by UrbanToronto Forum contributor drum118\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193116.jpg', true, 'Looking north to the new driveway and drop-off area at the west end, image by UrbanToronto Forum contributor drum118'); return false;\"><span class=\"image-description\">Looking north to the new driveway and drop-off area at the west end, image by UrbanToronto Forum contributor drum118<\/span><\/p>\n<p dir=\"ltr\">Once complete, the new hospital will deliver more than 950 beds.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193113.jpg\" data-entity-uuid=\"insert-display_default-1e46506c-dfa8-4fc8-b180-1d7f3ae1924f\" data-entity-type=\"file\" alt=\"Peter Gilgan Mississauga Hospital, designed by Stantec, Adamson Associates Architects, Parkin Architects Limited, and Jodoin Lamarre Pratte Architectes Inc for Trillium Health Partners\" title=\"Looking northwest to Peter Gilgan Mississauga Hospital, designed by Stantec, Adamson Associates Architects, Parkin Architects Limited, and Jodoin Lamarre Pratte Architectes Inc for Trillium Health Partners\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/01\/60225\/60225-193113.jpg', true, 'Looking northwest to Peter Gilgan Mississauga Hospital, designed by Stantec, Adamson Associates Architects, Parkin Architects Limited, and Jodoin Lamarre Pratte Architectes Inc for Trillium Health Partners'); return false;\"><span class=\"image-description\">Looking northwest to Peter Gilgan Mississauga Hospital, designed by Stantec, Adamson Associates Architects, Parkin Architects Limited, and Jodoin Lamarre Pratte Architectes Inc for Trillium Health Partners<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2026\/01\/excavation-continues-peter-gilgan-mississauga-hospital.60225\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Excavation has been advancing at the Peter Gilgan Mississauga Hospital site following the official ground breaking ceremony in June, &#8230; <a title=\"Excavation Continues at Peter Gilgan Mississauga Hospital\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/excavation-continues-at-peter-gilgan-mississauga-hospital\/\" aria-label=\"Read more about Excavation Continues at Peter Gilgan Mississauga Hospital\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-33979","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33979","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=33979"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/33979\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=33979"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=33979"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=33979"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}