{"id":34041,"date":"2026-01-25T13:55:25","date_gmt":"2026-01-25T21:55:25","guid":{"rendered":"https:\/\/essential.construction\/news\/hs2-final-tunnel-drive-to-euston-starts-next-week\/"},"modified":"2026-01-25T13:55:25","modified_gmt":"2026-01-25T21:55:25","slug":"hs2-final-tunnel-drive-to-euston-starts-next-week","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/hs2-final-tunnel-drive-to-euston-starts-next-week\/","title":{"rendered":"HS2 final tunnel drive to Euston starts next week"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-505044\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>A team from SCS will drive a 4.5-mile twin-bore tunnel linking Old Oak Common to Euston using two tunnel boring machines, Karen and Madeleine. <\/p>\n<p>The first machine, TBM Madeleine, will be launched on the upline next week, with the second machine, TBM Karen, following around a month later on the downline. <\/p>\n<p>Once fully operational, the TBMs are expected to advance at rates of up to 150m a week, reaching depths of up to 50m.<\/p>\n<p>Both machines are due to arrive beneath the Euston approaches in June 2027.<\/p>\n<p>Once the main tunnel drives are complete, the TBMs will be dismantled in the underground cavern beneath Parkway junction and removed in sections by lorry.<\/p>\n<p>Funding is currently in place to complete the tunnels just before Euston, but the final design and funding decision for the stretches of tunnel into a rebuilt Euston station have to be confirmed.<\/p>\n<p>These will be hand-dug with sprayed concrete lining. One tunnel is planned to split into two, creating a three-tunnel configuration.<\/p>\n<p>This layout will provide two tunnels for arriving services and one for departures, allowing flexibility in how trains are routed into Euston platforms. <\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/01\/23\/hs2-final-tunnel-drive-to-euston-starts-next-week\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] A team from SCS will drive a 4.5-mile twin-bore tunnel linking Old Oak Common to Euston using two tunnel &#8230; <a title=\"HS2 final tunnel drive to Euston starts next week\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/hs2-final-tunnel-drive-to-euston-starts-next-week\/\" aria-label=\"Read more about HS2 final tunnel drive to Euston starts next week\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34041","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34041","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34041"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34041\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34041"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34041"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34041"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}