{"id":34047,"date":"2026-01-26T01:56:11","date_gmt":"2026-01-26T09:56:11","guid":{"rendered":"https:\/\/essential.construction\/news\/barratt-redrow-to-start-900-home-london-high-rise-scheme\/"},"modified":"2026-01-26T01:56:11","modified_gmt":"2026-01-26T09:56:11","slug":"barratt-redrow-to-start-900-home-london-high-rise-scheme","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/barratt-redrow-to-start-900-home-london-high-rise-scheme\/","title":{"rendered":"Barratt Redrow to start 900-home London high rise scheme"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-505094\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The agreement paves the way for construction of an opening tranche of 195 rental flats, marking Grainger\u2019s first BTR partnership with a major housebuilder.<\/p>\n<p>The first phase has secured detailed planning consent and Gateway 2 approval from the Building Safety Regulator, clearing the way for work to begin within weeks.<\/p>\n<div id=\"attachment_437303\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2020-07-20-at-07.17.36.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-437303 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2020-07-20-at-07.17.36.png\" alt=\"-\" width=\"1082\" height=\"1228\"><\/a><\/p>\n<p class=\"wp-caption-text\">Detailed high-rise flats plan submitted for plot 3a<\/p>\n<\/div>\n<p>The wider Bollo Lane scheme is being brought forward by a partnership between Barratt Redrow and Transport for London. It will consist of a dozen blocks running along a ribbon site next to tube line tracks at Acton in West London.<\/p>\n<p>The planned second phase will deliver around 450 homes with a third phase delivering around 250 homes.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2020-07-20-at-07.20.15.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-437302\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2020-07-20-at-07.20.15.png\" alt=\"-\" width=\"1204\" height=\"892\"><\/a><\/p>\n<p>Further land to the north in Acton, which could be incorporated into the partnership, could deliver a new facility for the London Transport Museum together with a further 800 homes.<\/p>\n<p>As well as delivering new homes and public realm improvements, both TfL and Barratt Redrow will seek to deliver new educational and job opportunities for those considering a career in the construction industry, including for those who live locally, through apprenticeships and training programmes.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/01\/26\/barrat-redrow-to-start-900-home-bollo-lane-first-phase\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The agreement paves the way for construction of an opening tranche of 195 rental flats, marking Grainger\u2019s first BTR &#8230; <a title=\"Barratt Redrow to start 900-home London high rise scheme\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/barratt-redrow-to-start-900-home-london-high-rise-scheme\/\" aria-label=\"Read more about Barratt Redrow to start 900-home London high rise scheme\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34047","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34047","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34047"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34047\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}