{"id":34082,"date":"2026-01-29T02:02:14","date_gmt":"2026-01-29T10:02:14","guid":{"rendered":"https:\/\/essential.construction\/news\/bk-inks-274m-newcastle-student-campus-rebuild\/"},"modified":"2026-01-29T02:02:14","modified_gmt":"2026-01-29T10:02:14","slug":"bk-inks-274m-newcastle-student-campus-rebuild","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/bk-inks-274m-newcastle-student-campus-rebuild\/","title":{"rendered":"B+K inks \u00a3274m Newcastle student campus rebuild"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>Gateway 2 approval has now been secured from the Building Safety Regulator, clearing the way for the replacement of the ageing 1960s complex with 2,009 new student rooms across a series of two to nine-storey blocks.<\/p>\n<p>It ranks as B+K\u2019s second major student project to achieve Gateway 2 this month following approval of a over 500-bed scheme in Bristol.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/courtyard-castle-leazes-unite-p-planning-docs.jpg\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-505222\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/courtyard-castle-leazes-unite-p-planning-docs.jpg\" alt=\"-\" width=\"1024\" height=\"584\"><\/a><\/p>\n<p>The Norr Architectural-designed Castle Leaze scheme will be delivered in two phases.<\/p>\n<p>Phase one will provide 788 beds ready for the 2028\/29 academic year, with the remaining rooms following in time for the 2029\/30 intake.<\/p>\n<p>B+K began demolition and enabling works in June 2024 and says it has already generated \u00a39.6m of social value through local employment, supply chain spend, community initiatives and training opportunities.<\/p>\n<p>North East and `Scotland regional director Ed Besford said: \u201cCastle Leazes is a landmark redevelopment project and we are delighted to be supporting our long-standing clients Unite Students and Newcastle University.<\/p>\n<p>\u201cOur team worked hard to support the Gateway 2 process and we are pleased to have been given the green light, marking our third approval from the regulator in six months.\u201d<\/p>\n<div id=\"attachment_505215\" class=\"wp-caption aligncenter\"><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-01-28-at-22.20.27.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-505215 size-full\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-01-28-at-22.20.27.png\" alt=\"-\" width=\"1250\" height=\"802\"><\/a><\/p>\n<p class=\"wp-caption-text\">Temple Reach PBSA development<\/p>\n<\/div>\n<p>Two weeks ago the contractor\u2019s Western team secured Gateway 2 sign-off for the 22-storey Temple Reach PBSA development, which it will deliver for developer Cubex.<\/p>\n<p>The 22-storey scheme will provide 531 student rooms alongside 4,300 sq ft of workspace on a former industrial site close to the River Avon, helping link the University of Bristol\u2019s Enterprise Campus with the waterfront.<\/p>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/01\/29\/bk-inks-274m-newcastle-student-campus-rebuild\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Gateway 2 approval has now been secured from the Building Safety Regulator, clearing the way for the replacement of &#8230; <a title=\"B+K inks \u00a3274m Newcastle student campus rebuild\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/bk-inks-274m-newcastle-student-campus-rebuild\/\" aria-label=\"Read more about B+K inks \u00a3274m Newcastle student campus rebuild\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34082","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34082","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34082"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34082\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}