{"id":34112,"date":"2026-01-31T02:06:14","date_gmt":"2026-01-31T10:06:14","guid":{"rendered":"https:\/\/essential.construction\/news\/new-severfield-boss-shuts-modular-arm\/"},"modified":"2026-01-31T02:06:14","modified_gmt":"2026-01-31T10:06:14","slug":"new-severfield-boss-shuts-modular-arm","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/new-severfield-boss-shuts-modular-arm\/","title":{"rendered":"New Severfield boss shuts modular arm"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-505264\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The steelwork giant said its Modular Solutions division based in Sherburn would be discontinued following a board-level assessment of markets, operations and group structure.<\/p>\n<p>Chief executive Paul McNerney said the closure was an early step in reshaping the group\u2019s strategy, with a broader update on growth plans due later this year.<\/p>\n<p>The modular unit generated \u00a324m of revenue and \u00a30.4m of underlying pre-tax profit in the year to March 2025 but has since been hit by a tougher trading backdrop and a slowdown across the wider modular construction market.<\/p>\n<p>Severfield said it had considered a range of strategic options before deciding to pull the plug, describing the operation as non-core to the group\u2019s long-term focus on structural steelwork.<\/p>\n<p>The move does not affect Construction Metal Forming, which will continue as a separate joint venture.<\/p>\n<p>The group said it was working with affected staff and stakeholders to limit the impact of the closure, including through consultation and redeployment where possible.<\/p>\n<p>Severfield said the decision would not change its expectations for FY26 underlying pre-tax profit or net debt. <\/p>\n<p>Modular Solutions will be treated as a discontinued operation and the group does not expect a material cash impact.<\/p>\n<p>The business continues to lean on its core steelwork operations, backed by a diversified \u00a3479m order book as at 1 January 2026.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/01\/30\/new-severfield-boss-shuts-modular-arm\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The steelwork giant said its Modular Solutions division based in Sherburn would be discontinued following a board-level assessment of &#8230; <a title=\"New Severfield boss shuts modular arm\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/new-severfield-boss-shuts-modular-arm\/\" aria-label=\"Read more about New Severfield boss shuts modular arm\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34112","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34112","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34112"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34112\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}