{"id":34143,"date":"2026-02-02T14:25:14","date_gmt":"2026-02-02T22:25:14","guid":{"rendered":"https:\/\/essential.construction\/news\/construction-briefs-jan-2026-data-update-2-2-26-construction-analytics\/"},"modified":"2026-02-02T14:25:15","modified_gmt":"2026-02-02T22:25:15","slug":"construction-briefs-jan-2026-data-update-2-2-26-construction-analytics","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/construction-briefs-jan-2026-data-update-2-2-26-construction-analytics\/","title":{"rendered":"Construction Briefs Jan 2026 Data Update 2-2-26 \u00ab Construction Analytics"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p class=\"wp-block-paragraph\">We are still not where we should be with government data delays caused by the shutdown. Recent releases bring BLS jobs data up to Dec, PPI data through Nov and Construction Spending data through October.  Here\u2019s a collection of tables and plots reflecting some of that data through the end of January.<\/p>\n<p class=\"wp-block-paragraph\">Construction Spending Value Put in Place<br \/>The November 2025 release, originally scheduled for January 2, 2026, and the December 2025 release, originally scheduled for February 2, 2026, for the Monthly Construction Spending report have been rescheduled for release on February 27, 2026.<\/p>\n<figure class=\"wp-block-image size-large\"><\/figure>\n<p class=\"wp-block-paragraph\">There\u2019s is an unusually large decline in residential construction spending in Sept data, almost entirely attributed to renovation work. A closer look at the data shows it may be that Aug and Oct reno data seem out-of-sync and those may be overstated. All 2025 data still open to Jul 1 revision.<\/p>\n<p class=\"wp-block-paragraph\">25 data center projects were canceled in 2025 amidst surging local opposition \u2014 4X as many as in 2024.<\/p>\n<p class=\"wp-block-paragraph\">( Personal opinion \u2013 Data Center growth will be restricted by difficulty to ramp up power generation and transmission. This in turn will slow construction spending growth in this market).<\/p>\n<p class=\"wp-block-paragraph\">Construction Jobs increased 1.1% in 2025. Spending (actual thru Oct) fell 1.5% in 2025. But inflation ate up 4% of spending. So real volume of construction activity fell 5.3%. Therefore, productivity fell 6.4%. <\/p>\n<p class=\"wp-block-paragraph\">Also, if your construction business revenue increased less than 5.3% in 2025, your real business growth fell in 2025.<\/p>\n<p class=\"wp-block-paragraph\">Jobs 2025  Nonres Bldgs +1.6%, Nonbldg +2.4%, Residential -0.6%<\/p>\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"20704\" data-permalink=\"https:\/\/edzarenski.com\/2026\/02\/02\/construction-briefs-jan-2026-data-update-2-2-26\/spending-inflation-index-constant-2019-2027-1-30-26\/\" data-orig-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/spending-inflation-index-constant-2019-2027-1-30-26.jpg\" data-orig-size=\"792,524\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Ed Zarenski&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1769771071&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"Spending Inflation Index Constant 2019-2027  1-30-26\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/spending-inflation-index-constant-2019-2027-1-30-26.jpg?w=300\" data-large-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/spending-inflation-index-constant-2019-2027-1-30-26.jpg?w=500\" width=\"792\" height=\"524\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2026\/02\/spending-inflation-index-constant-2019-2027-1-30-26.jpg\" alt=\"-\" class=\"wp-image-20704\"><\/figure>\n<p class=\"wp-block-paragraph\">Construction Spending \u2013 Volume \u2013 Jobs<\/p>\n<p class=\"wp-block-paragraph\">Construction Jobs avg 2025 increased only 88k from avg 2024. Slowest jobs growth since 2011 (ex 2020). Jobs 2025 up 1.1% over 2024. Jobs have been flat (or +\/- slight) since Feb.<\/p>\n<p class=\"wp-block-paragraph\">Residential jobs down 0.6%, but rsdn spending ytd thru Aug down 3.7% from Q4\u201924. After adjusting for inflation rsdn volume ytd is down 6%.  Nonres Bldgs jobs up 1.6%. Nonres Bldgs volume down 3%.  Nonbldg jobs up 2.4%. Nonbldg volume up 1.5%.<\/p>\n<p class=\"wp-block-paragraph\">Environment for construction jobs looking difficult. Volume of work (spending minus inflation) available is declining all through 2026. Biggest declines by far, Manufacturing and SF Rsdn.<\/p>\n<p class=\"wp-block-paragraph\">Don\u2019t expect construction to add jobs in 2026. While spending may be near flat, inflation data for 2026 has volume projected to fall 3.7%.<\/p>\n<p class=\"wp-block-paragraph\">Construction spending constant $$ (volume) is down 5% compare to start 2025 or same month 2024. We decline ~ 4% in 2026. A 4% drop in volume could be a loss of 300,000 Jobs. Companies usually don\u2019t cut # of jobs indicated by falling business volume. More jobs remain than volume. Productivity ($ pip per job) declines.<\/p>\n<p class=\"wp-block-paragraph\">Volume of work is spending minus inflation. When jobs growth exceeds volume growth, productivity is declining. Volume has been declining for last 2 years and is expected to continue declining in 2026.<\/p>\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"20706\" data-permalink=\"https:\/\/edzarenski.com\/2026\/02\/02\/construction-briefs-jan-2026-data-update-2-2-26\/jobs-vs-volume-vs-spending-jan2020-jan2027-2-1-26\/\" data-orig-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/jobs-vs-volume-vs-spending-jan2020-jan2027-2-1-26.jpg\" data-orig-size=\"845,484\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Ed Zarenski&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1770022439&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"Jobs vs Volume vs Spending Jan2020-Jan2027 2-1-26\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/jobs-vs-volume-vs-spending-jan2020-jan2027-2-1-26.jpg?w=300\" data-large-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/jobs-vs-volume-vs-spending-jan2020-jan2027-2-1-26.jpg?w=500\" width=\"845\" height=\"484\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2026\/02\/jobs-vs-volume-vs-spending-jan2020-jan2027-2-1-26.jpg\" alt=\"-\" class=\"wp-image-20706\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-attachment-id=\"20723\" data-permalink=\"https:\/\/edzarenski.com\/2026\/02\/02\/construction-briefs-jan-2026-data-update-2-2-26\/bci-annual-pct-index-2015-2027-2-2-26\/\" data-orig-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/bci-annual-pct-index-2015-2027-2-2-26.jpg\" data-orig-size=\"849,165\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Ed Zarenski&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1770044208&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"BCI Annual PCT &amp; INDEX 2015-2027 2-2-26\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/bci-annual-pct-index-2015-2027-2-2-26.jpg?w=300\" data-large-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/bci-annual-pct-index-2015-2027-2-2-26.jpg?w=500\" loading=\"lazy\" width=\"849\" height=\"165\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2026\/02\/bci-annual-pct-index-2015-2027-2-2-26.jpg\" alt=\"-\" class=\"wp-image-20723\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-attachment-id=\"20715\" data-permalink=\"https:\/\/edzarenski.com\/2026\/02\/02\/construction-briefs-jan-2026-data-update-2-2-26\/ppi-2025-final-demand-20-25-nov-1-30-26\/\" data-orig-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-2025-final-demand-20-25-nov-1-30-26.jpg\" data-orig-size=\"1072,406\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Ed Zarenski&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1769770183&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"PPI 2025 Final Demand 20-25 NOV 1-30-26\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-2025-final-demand-20-25-nov-1-30-26.jpg?w=300\" data-large-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-2025-final-demand-20-25-nov-1-30-26.jpg?w=500\" loading=\"lazy\" width=\"1024\" height=\"387\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2026\/02\/ppi-2025-final-demand-20-25-nov-1-30-26.jpg\" alt=\"-\" class=\"wp-image-20715\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-attachment-id=\"20714\" data-permalink=\"https:\/\/edzarenski.com\/2026\/02\/02\/construction-briefs-jan-2026-data-update-2-2-26\/ppi-inputs-2020-2025-nov-1-30-26\/\" data-orig-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-inputs-2020-2025-nov-1-30-26.jpg\" data-orig-size=\"1160,654\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Ed Zarenski&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1769770103&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"PPI INPUTS 2020-2025 NOV 1-30-26\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-inputs-2020-2025-nov-1-30-26.jpg?w=300\" data-large-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-inputs-2020-2025-nov-1-30-26.jpg?w=500\" loading=\"lazy\" width=\"1024\" height=\"577\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2026\/02\/ppi-inputs-2020-2025-nov-1-30-26.jpg\" alt=\"-\" class=\"wp-image-20714\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-attachment-id=\"20708\" data-permalink=\"https:\/\/edzarenski.com\/2026\/02\/02\/construction-briefs-jan-2026-data-update-2-2-26\/ppi-inputs-qtrly-2021-2025-1-30-26\/\" data-orig-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-inputs-qtrly-2021-2025-1-30-26.jpg\" data-orig-size=\"1291,367\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Ed Zarenski&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1770037753&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"PPI INPUTS QTRLY 2021-2025 1-30-26\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-inputs-qtrly-2021-2025-1-30-26.jpg?w=300\" data-large-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-inputs-qtrly-2021-2025-1-30-26.jpg?w=500\" loading=\"lazy\" width=\"1024\" height=\"291\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2026\/02\/ppi-inputs-qtrly-2021-2025-1-30-26.jpg\" alt=\"-\" class=\"wp-image-20708\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-attachment-id=\"20709\" data-permalink=\"https:\/\/edzarenski.com\/2026\/02\/02\/construction-briefs-jan-2026-data-update-2-2-26\/ppi-final-demand-qtrly-21-25-1-30-26\/\" data-orig-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-final-demand-qtrly-21-25-1-30-26.jpg\" data-orig-size=\"1236,226\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Ed Zarenski&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1770037942&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"PPI Final Demand QTRLY 21-25 1-30-26\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-final-demand-qtrly-21-25-1-30-26.jpg?w=300\" data-large-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-final-demand-qtrly-21-25-1-30-26.jpg?w=500\" loading=\"lazy\" width=\"1024\" height=\"187\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2026\/02\/ppi-final-demand-qtrly-21-25-1-30-26.jpg\" alt=\"-\" class=\"wp-image-20709\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-attachment-id=\"20711\" data-permalink=\"https:\/\/edzarenski.com\/2026\/02\/02\/construction-briefs-jan-2026-data-update-2-2-26\/ppi-inputs-index-values-2019-2025-1-30-26\/\" data-orig-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-inputs-index-values-2019-2025-1-30-26.jpg\" data-orig-size=\"614,327\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Ed Zarenski&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1770039105&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"PPI INPUTS INDEX VALUES 2019-2025 1-30-26\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-inputs-index-values-2019-2025-1-30-26.jpg?w=300\" data-large-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-inputs-index-values-2019-2025-1-30-26.jpg?w=500\" loading=\"lazy\" width=\"614\" height=\"327\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2026\/02\/ppi-inputs-index-values-2019-2025-1-30-26.jpg\" alt=\"-\" class=\"wp-image-20711\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-attachment-id=\"20712\" data-permalink=\"https:\/\/edzarenski.com\/2026\/02\/02\/construction-briefs-jan-2026-data-update-2-2-26\/ppi-finall-demand-index-values-2019-2025-1-30-26\/\" data-orig-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-finall-demand-index-values-2019-2025-1-30-26.jpg\" data-orig-size=\"612,173\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;Ed Zarenski&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1770039530&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"PPI FINALL DEMAND INDEX VALUES 2019-2025 1-30-26\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-finall-demand-index-values-2019-2025-1-30-26.jpg?w=300\" data-large-file=\"https:\/\/edzarenski.com\/wp-content\/uploads\/2026\/02\/ppi-finall-demand-index-values-2019-2025-1-30-26.jpg?w=500\" loading=\"lazy\" width=\"612\" height=\"173\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2026\/02\/ppi-finall-demand-index-values-2019-2025-1-30-26.jpg\" alt=\"-\" class=\"wp-image-20712\"><\/figure>\n<\/p><\/div>\n<p><script>(function(d, s, id) { var js, fjs = d.getElementsByTagName(s)[0]; if (d.getElementById(id)) return; js = d.createElement(s); js.id = id; js.src=\"https:\/\/connect.facebook.net\/en_US\/sdk.js#xfbml=1&amp;appId=249643311490&version=v2.3\"; fjs.parentNode.insertBefore(js, fjs); }(document, 'script', 'facebook-jssdk'));<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/edzarenski.com\/2026\/02\/02\/construction-briefs-jan-2026-data-update-2-2-26\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] We are still not where we should be with government data delays caused by the shutdown. Recent releases bring &#8230; <a title=\"Construction Briefs Jan 2026 Data Update 2-2-26 \u00ab Construction Analytics\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/construction-briefs-jan-2026-data-update-2-2-26-construction-analytics\/\" aria-label=\"Read more about Construction Briefs Jan 2026 Data Update 2-2-26 \u00ab Construction Analytics\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":34144,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1008],"tags":[1125,345,1126],"class_list":["post-34143","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-analytics","tag-analytics","tag-business","tag-industry-news","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34143","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34143"}],"version-history":[{"count":1,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34143\/revisions"}],"predecessor-version":[{"id":34145,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34143\/revisions\/34145"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/34144"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}