{"id":34169,"date":"2026-02-04T14:15:22","date_gmt":"2026-02-04T22:15:22","guid":{"rendered":"https:\/\/essential.construction\/news\/data-centre-drain-ramps-up-me-labour-costs\/"},"modified":"2026-02-04T14:15:22","modified_gmt":"2026-02-04T22:15:22","slug":"data-centre-drain-ramps-up-me-labour-costs","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/data-centre-drain-ramps-up-me-labour-costs\/","title":{"rendered":"Data centre drain ramps-up M&#038;E labour costs"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>The latest London Main Contractor Survey by consultant AECOM highlighted the issue with a growing number of contractors looking to establish in-house MEP divisions.<\/p>\n<p>The report stated: \u201cThese skilled trades are experiencing acute shortages. This is due in part to the rapid expansion of the data centre sector, which is absorbing a large share of the leading MEP subcontractors.<\/p>\n<p>\u201cThis has left other construction sectors with a much smaller pool of high-quality subcontractors, driving up prices due to competition increases for limited specialist resource.<\/p>\n<p>\u201cSuch is the extent of the problem, some of the contractors we spoke to are building built in-house MEP delivery teams to use on their own schemes.\u201d<\/p>\n<p>The report said the problem swill intensify if the general market picks-up but short-term confidence among contractors in the capital is low.<\/p>\n<p>Brian Smith, head of cost management and commercial, AECOM said: \u201cThis year\u2019s survey shows contractors are balancing the need to secure work with managing risk exposure.<\/p>\n<p>\u201cAs competition intensifies, some are prepared to take on greater risk, such as committing to long programme durations, to win work, while others are prioritising lower-risk opportunities with trusted partners.<\/p>\n<p>\u201cThe challenge for 2026 will be maintaining stability by strengthening the industry\u2019s resilience and labour capacity ahead of what is expected to be a dynamic 2027.\u201d<\/p>\n<p>Looking ahead, the survey respondents have a more confident outlook for the longer term. Tier 1 contractors report healthy order books for 2026, built up of a diverse mix of sectors, rather than a reliance on any single\u00a0market.<\/p>\n<p>Orders in London were above the long-term average in the final quarter of 2025, with growth across all sectors offsetting the year\u2019s overall decline in residential activity.<\/p>\n<p>Evidence points to the London construction market diversifying away from residential projects, shifting focus to commercial, refurbishment, public sector, life sciences, and infrastructure projects\u00a0instead.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/02\/04\/data-centre-drain-ramps-up-me-labour-costs\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The latest London Main Contractor Survey by consultant AECOM highlighted the issue with a growing number of contractors looking &#8230; <a title=\"Data centre drain ramps-up M&#038;E labour costs\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/data-centre-drain-ramps-up-me-labour-costs\/\" aria-label=\"Read more about Data centre drain ramps-up M&#038;E labour costs\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34169","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34169"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34169\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}