{"id":34206,"date":"2026-02-07T02:24:11","date_gmt":"2026-02-07T10:24:11","guid":{"rendered":"https:\/\/essential.construction\/news\/rosehill-tower-in-deer-park-topped-off-as-cladding-nears-completion\/"},"modified":"2026-02-07T02:24:11","modified_gmt":"2026-02-07T10:24:11","slug":"rosehill-tower-in-deer-park-topped-off-as-cladding-nears-completion","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/rosehill-tower-in-deer-park-topped-off-as-cladding-nears-completion\/","title":{"rendered":"Rosehill Tower in Deer Park Topped Off as Cladding Nears Completion"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Rising on the south side of Rosehill Avenue in Toronto\u2019s Deer Park neighbourhood, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/rosehill-tower.24069\" target=\"_blank\">Rosehill Tower<\/a> has topped out, with exterior cladding largely installed for the 31-storey rental building from <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/quadreal-property-group.28215\" target=\"_blank\">QuadReal Property Group<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bgo.16396\" target=\"_blank\">BGO<\/a>, and <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bcimc.7644\" target=\"_blank\">bcIMC<\/a>. Designed by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/hariri-pontarini-architects.8001\" target=\"_blank\">Hariri Pontarini Architects<\/a>, work is wrapping up on exterior finishing while interior work progresses on lower floors. UrbanToronto\u2019s last update was in <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2025\/04\/rosehill-tower-deer-park-passes-halfway-mark-cladding-underway.58495\" target=\"_blank\">April, 2025<\/a>, when the concrete structure had just passed the halfway mark.<\/p>\n<p dir=\"ltr\">Looking northeast in June, 2025, the tower stood at 23 storeys, with exterior envelope installation progressing steadily up the lower half of the structure. Along the south and west elevations, cladding and glazing have been installed to roughly the 13th floor. The facade is defined by a window wall system of dark gray mullions and spandrel panels, framed within a crisp white accent grid.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193692.JPG\" data-entity-uuid=\"insert-display_default-c5e096bd-d168-4679-9873-28a356b1c9ca\" data-entity-type=\"file\" alt=\"Rosehill Tower, Toronto, designed by Hariri Pontarini Architects for QuadReal Property Group, bcIMC and BentallGreenOak\" title=\"Cladding installation progress on the south and west elevations, looking northeast, image by UrbanToronto Forum contributor kai\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193692.JPG', true, 'Cladding installation progress on the south and west elevations, looking northeast, image by UrbanToronto Forum contributor kai'); return false;\"><span class=\"image-description\">Cladding installation progress on the south and west elevations, looking northeast, image by UrbanToronto Forum contributor kai<\/span><\/p>\n<p dir=\"ltr\">In September, 2025, the narrower south elevation showed the facade pattern extending steadily up the tower as envelope work advanced. Along the west elevation, glass balcony guards are installed up to the 14th floor, while projecting concrete balcony slabs remain supported by shoring posts on upper levels. Cement panel cladding runs continuously up the left and right edges of the south elevation, forming a durable border.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193694.jpeg\" data-entity-uuid=\"insert-display_default-f537e11f-cec0-4b16-a351-b579e6e1aca0\" data-entity-type=\"file\" alt=\"Rosehill Tower, Toronto, designed by Hariri Pontarini Architects for QuadReal Property Group, bcIMC and BentallGreenOak\" title=\"South elevation showing window wall installation and balcony work along the west and east elevations, image by UrbanToronto Forum contributor rdaner\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193694.jpeg', true, 'South elevation showing window wall installation and balcony work along the west and east elevations, image by UrbanToronto Forum contributor rdaner'); return false;\"><span class=\"image-description\">South elevation showing window wall installation and balcony work along the west and east elevations, image by UrbanToronto Forum contributor rdaner<\/span><\/p>\n<p dir=\"ltr\">The podium\u2019s northeast corner, seen here in October, 2025, shows curtain wall installation advancing beneath a cantilevered, angled concrete slab that contributes to the tower\u2019s chamfered southeast massing. Curved glazing panels are largely in place at ground level, following the rounded corner geometry, with protective coverings still masking the lower portion of the glass. Above the curtain wall head, insulation lines the spandrel zone directly beneath the slab edge. Rising overhead, balcony slabs angle around the corner, their glass guards already installed.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193693.jpeg\" data-entity-uuid=\"insert-display_default-a7ea9c66-32c8-46e2-b7ac-a59d3ebdb1c0\" data-entity-type=\"file\" alt=\"Rosehill Tower, Toronto, designed by Hariri Pontarini Architects for QuadReal Property Group, bcIMC and BentallGreenOak\" title=\"Northeast corner of the podium with curved curtain wall glazing, image by UrbanToronto Forum contributor artemperederii\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193693.jpeg', true, 'Northeast corner of the podium with curved curtain wall glazing, image by UrbanToronto Forum contributor artemperederii'); return false;\"><span class=\"image-description\">Northeast corner of the podium with curved curtain wall glazing, image by UrbanToronto Forum contributor artemperederii<\/span><\/p>\n<p dir=\"ltr\">By December, 2025, Rosehill Tower stood structurally topped off with exterior enclosure largely complete, and the mechanical penthouse visible above. On the right, corner balconies project outward with glass guards fully installed, while a vertical column of balconies runs up the centre of the elevation. A full-height construction hoist remains attached at the northwest corner, and blue weatherproofing is visible along the second- and third-floor slab edges at grade.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193690.jpeg\" data-entity-uuid=\"insert-display_default-fc9b93c5-522d-4435-a451-7ef3c4b1e1e0\" data-entity-type=\"file\" alt=\"Rosehill Tower, Toronto, designed by Hariri Pontarini Architects for QuadReal Property Group, bcIMC and BentallGreenOak\" title=\"Looking southeast to the topped off tower with cladding largely complete, image by UrbanToronto Forum contributor YongeBloor\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193690.jpeg', true, 'Looking southeast to the topped off tower with cladding largely complete, image by UrbanToronto Forum contributor YongeBloor'); return false;\"><span class=\"image-description\">Looking southeast to the topped off tower with cladding largely complete, image by UrbanToronto Forum contributor YongeBloor<\/span><\/p>\n<p dir=\"ltr\">This month, exterior enclosure nears completion along the north elevation, with glazing installed continuously up to the roofline. Most of the white accent panel cladding is in place, though narrow strips of dark temporary protection remain where final panels have yet to be installed. At the top of the tower, localized scaffolding and temporary access structures flank the mechanical penthouse as finishing work continues. Blue weatherproofing remains visible along the roof\u2019s slab edge, while the crane is still standing near the east side.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193691.jpeg\" data-entity-uuid=\"insert-display_default-77374cf7-0125-41b3-91f0-41630187e508\" data-entity-type=\"file\" alt=\"Rosehill Tower, Toronto, designed by Hariri Pontarini Architects for QuadReal Property Group, bcIMC and BentallGreenOak\" title=\"Looking south to the north elevation as final cladding and rooftop work continue, image by UrbanToronto Forum contributor Johnny Au\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193691.jpeg', true, 'Looking south to the north elevation as final cladding and rooftop work continue, image by UrbanToronto Forum contributor Johnny Au'); return false;\"><span class=\"image-description\">Looking south to the north elevation as final cladding and rooftop work continue, image by UrbanToronto Forum contributor Johnny Au<\/span><\/p>\n<p dir=\"ltr\">Rosehill Tower stands 103.5m and will deliver 263 purpose-built rental units.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193689.jpg\" data-entity-uuid=\"insert-display_default-294661cd-e780-4773-9a20-e3174aa85e29\" data-entity-type=\"file\" alt=\"Rosehill Tower, Toronto, designed by Hariri Pontarini Architects for QuadReal Property Group, bcIMC and BentallGreenOak\" title=\"Looking southwest to Rosehill Tower, designed by Hariri Pontarini Architects for QuadReal Property Group, bcIMC and BentallGreenOak\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60346\/60346-193689.jpg', true, 'Looking southwest to Rosehill Tower, designed by Hariri Pontarini Architects for QuadReal Property Group, bcIMC and BentallGreenOak'); return false;\"><span class=\"image-description\">Looking southwest to Rosehill Tower, designed by Hariri Pontarini Architects for QuadReal Property Group, bcIMC and BentallGreenOak<\/span><\/p>\n<p dir=\"ltr\">UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\" dir=\"ltr\">* * *<\/p>\n<p>UrbanToronto&#8217;s research and data service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UTPro<\/a>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.\u200b<\/p>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2026\/02\/rosehill-tower-deer-park-topped-cladding-nears-completion.60346\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Rising on the south side of Rosehill Avenue in Toronto\u2019s Deer Park neighbourhood, Rosehill Tower has topped out, with &#8230; <a title=\"Rosehill Tower in Deer Park Topped Off as Cladding Nears Completion\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/rosehill-tower-in-deer-park-topped-off-as-cladding-nears-completion\/\" aria-label=\"Read more about Rosehill Tower in Deer Park Topped Off as Cladding Nears Completion\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-34206","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34206","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34206"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34206\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34206"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34206"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34206"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}