{"id":34239,"date":"2026-02-10T00:53:39","date_gmt":"2026-02-10T08:53:39","guid":{"rendered":"https:\/\/essential.construction\/news\/3-gilbane-helmed-student-housing-projects-break-ground\/"},"modified":"2026-02-10T00:53:39","modified_gmt":"2026-02-10T08:53:39","slug":"3-gilbane-helmed-student-housing-projects-break-ground","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/3-gilbane-helmed-student-housing-projects-break-ground\/","title":{"rendered":"3 Gilbane-helmed student housing projects break ground"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<div class=\"text-to-speech\">\n    <button class=\"text-to-speech__button button\"><br \/>\n        <img decoding=\"async\" class=\"text-to-speech__button__icon\" src=\"https:\/\/www.constructiondive.com\/static\/img\/play.svg?500116090725\" alt=\"-\"><br \/>\n        Listen to the article<br \/>\n        <span class=\"text-to-speech__button__audio-length\">2 min<\/span><br \/>\n    <\/button><\/p>\n<div class=\"text-to-speech__controls\">\n        <audio controls=\"\" class=\"js-text-to-speech\" preload=\"none\"><source src=\"https:\/\/text-to-speech.divecdn.com\/newspost\/811609\/2026-02-09_09.35.24\/gilbane-student-housing-projects-uri.wav\" type=\"audio\/mp3\"><\/source><\/audio><\/p>\n<div class=\"text-to-speech__controls__text\">\n            This audio is auto-generated. Please let us know if you have <a rel=\"nofollow noopener\" href=\"https:\/\/www.constructiondive.com\/contact\/\" target=\"_blank\">feedback<\/a>.\n        <\/div>\n<\/p><\/div>\n<\/div>\n<p><span><span><span><span><span><span>Gilbane and the University of Rhode Island have <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.gilbaneco.com\/about\/whats-new\/news\/gilbane-breaks-ground-on-new-on-campus-student-housing-at-university-of-rhode-island\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>broken ground on three residence<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> halls that will contain more than 1,100 beds at the university\u2019s Kingston, Rhode Island, campus, according to a Jan. 29 news release from the builder. The total bond issuance for the project is $210.8 million, the contractor told Construction Dive via email.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Providence, Rhode Island-based Gilbane will develop and build two of the structures \u2014 two new residence halls with apartment-style suites \u2014 on Flagg Road in the northwest area of campus, per the release. These apartment buildings will add 914 new beds, including two- and four-bedroom units.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The north residence hall will span 173,739 square feet with 134 units, while the residence hall south will measure 135,177 square feet and contain 105 units. Amenities include expanded study spaces and common areas, community wellness rooms, a grab-and-go cafe and an outdoor courtyard space with walking and bike paths, per Gilbane.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The firm will also reconstruct the Graduate Village Apartments complex for graduate students on Route 138, featuring 152 units across 84,813 square feet, per the release. The apartments will be a mix of studio, one-, two- and three-bedroom units and include a revived community garden and an enhanced community center.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The three new projects will increase the number of on-campus beds by more than 2,000 since 2012, according to the news release. The project aligns with <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/web.uri.edu\/president\/strategic-plan\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>URI\u2019s 10-year strategic plan<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> following a record-setting number of applications for the Fall 2025 semester at the school.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Gilbane will build the structures as part of an end-to-end public-private partnership, according to the news release. Gilbane <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.gilbaneco.com\/blog\/2025-public-private-partnerships-campus-housing-social-infrastructure-and-what-comes-next\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>touted its work with P3 jobs<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> in 2025 in a blog post, where it added more than $2.3 billion in P3 projects in higher education, health sciences and social infrastructure, according to the company.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>For higher ed and public owners, Gilbane said that P3 projects preserve balance sheets, deliver projects more cheaply and faster and align incentives over the long term by pairing design and construction with maintenance, per the company\u2019s post.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The first residence hall is scheduled to open in Fall 2027, with full completion of all buildings scheduled for Fall 2028.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructiondive.com\/news\/gilbane-student-housing-projects-uri\/811609\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Listen to the article 2 min This audio is auto-generated. Please let us know if you have feedback. Gilbane &#8230; <a title=\"3 Gilbane-helmed student housing projects break ground\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/3-gilbane-helmed-student-housing-projects-break-ground\/\" aria-label=\"Read more about 3 Gilbane-helmed student housing projects break ground\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[457],"tags":[],"class_list":["post-34239","post","type-post","status-publish","format-standard","hentry","category-construction-dive","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34239","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34239"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34239\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34239"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34239"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34239"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}