{"id":34283,"date":"2026-02-13T02:33:48","date_gmt":"2026-02-13T10:33:48","guid":{"rendered":"https:\/\/essential.construction\/news\/plans-ramp-up-for-wythenshawe-500m-town-centre-revamp\/"},"modified":"2026-02-13T02:33:48","modified_gmt":"2026-02-13T10:33:48","slug":"plans-ramp-up-for-wythenshawe-500m-town-centre-revamp","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/plans-ramp-up-for-wythenshawe-500m-town-centre-revamp\/","title":{"rendered":"Plans ramp-up for Wythenshawe \u00a3500m town centre revamp"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-505662\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The new food hall is part of wider plans to regenerate Wythenshawe Civic shopping centre in Manchester.<\/p>\n<p>They include construction of a new \u00a332m Culture Hub being built by Kier.<\/p>\n<p>Joel Chandler, senior development manager at Muse, said: \u201cWe\u2019re moving at pace with our plans to give the town centre the regeneration it deserves.<\/p>\n<p>\u201cThe food hall will be a hive for a range of local outlets and will provide new spaces for the community to spend time in and give the town\u2019s nighttime economy a major boost.<\/p>\n<p>\u201cWe\u2019re already talking with potential vendors about taking space in the food hall following some great conversations with the local community about what types of cuisine they would like to see. The aim is to ensure there\u2019s something for everyone and share the very best of what Wythenshawe has to offer.\u201d<\/p>\n<p>Muse has also recently submitted three separate applications to create 422 new affordable homes for social rent across three locations in the town centre. This first phase of homes form part of the wider masterplan and will see up to 2,000 new homes created over the next 10 to 15 years.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/userphoto\/3.jpg\" alt=\"Grant Prior\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/02\/13\/plans-ramp-up-for-500m-wythenshawe-town-centre-revamp\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The new food hall is part of wider plans to regenerate Wythenshawe Civic shopping centre in Manchester. They include &#8230; <a title=\"Plans ramp-up for Wythenshawe \u00a3500m town centre revamp\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/plans-ramp-up-for-wythenshawe-500m-town-centre-revamp\/\" aria-label=\"Read more about Plans ramp-up for Wythenshawe \u00a3500m town centre revamp\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34283","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34283","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34283"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34283\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34283"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34283"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34283"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}