{"id":34447,"date":"2026-02-26T14:42:16","date_gmt":"2026-02-26T22:42:16","guid":{"rendered":"https:\/\/essential.construction\/news\/1-04b-contract-awarded-for-new-ontario-science-centre-as-final-design-unveiled\/"},"modified":"2026-02-26T14:42:16","modified_gmt":"2026-02-26T22:42:16","slug":"1-04b-contract-awarded-for-new-ontario-science-centre-as-final-design-unveiled","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/1-04b-contract-awarded-for-new-ontario-science-centre-as-final-design-unveiled\/","title":{"rendered":"$1.04B contract awarded for new Ontario Science Centre as final design unveiled"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p><span data-contrast=\"auto\">TORONTO \u2014 Infrastructure Ontario (IO) and\u00a0the\u00a0Ministry of Tourism, Culture and Gaming (MTCG) have awarded a contract of\u00a0$1.04 billion\u00a0to Ontario Science Partners to design, build, finance and\u00a0maintain\u00a0a new Ontario Science Centre facility.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The project team includes:<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\"><strong>Applicant\u00a0leads:<\/strong> John Laing Limited, Sacyr Infrastructure Canada\u00a0Inc.\u00a0and Amico Major Projects Inc.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Design\u00a0team:<\/strong> Hariri\u00a0Pontarini\u00a0Architects &amp;\u00a0Sn\u00f8hetta<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Construction\u00a0team:<\/strong>\u202fSacyr Canada Inc, and Amico Design Build Inc.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Facilities\u00a0management:<\/strong>\u202fJohnson Controls Canada L.P.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Financial\u00a0adviser:<\/strong>\u00a0Agentis\u00a0Capital Advisors<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">To be\u00a0located\u00a0on the mainland of Ontario Place, the new\u00a0centre\u00a0will include the\u00a0preservation of the\u00a0Cinesphere\u00a0and Pod complex, a\u00a0release\u00a0notes.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The\u202fnew\u202f400,000-square-foot facility\u202fwill include interactive exhibits and an improved and upgraded\u00a0Cinesphere, with more space dedicated to programming than at the previous site.\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<figure id=\"attachment_524453\" aria-describedby=\"caption-attachment-524453\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-524453\" src=\"https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2026\/02\/aerial-rendering-of-the-ontario-science-centreweb.png\" alt=\"The\u202fnew\u202f400,000-square-foot facility\u202fwill include interactive exhibits and an improved and upgraded Cinesphere, with more space dedicated to programming than at the previous site. It will also integrate the pods.  \" width=\"600\" height=\"450\" srcset=\"https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2026\/02\/aerial-rendering-of-the-ontario-science-centreweb.png 600w, https:\/\/cc-production-uploads-bucket.s3.amazonaws.com\/uploads\/2026\/02\/aerial-rendering-of-the-ontario-science-centreweb-300x225.png 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\"\/><figcaption id=\"caption-attachment-524453\" class=\"wp-caption-text\">INFRASTRUCTURE ONTARIO \u2014 The\u202fnew\u202f400,000-square-foot facility\u202fwill include interactive exhibits and an improved and upgraded Cinesphere, with more space dedicated to programming than at the previous site. It will also integrate the pods.<\/figcaption><\/figure>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">IO and MTCG selected Ontario Science Partners\u00a0after a\u00a0procurement process that began in May 2024. Selection criteria included\u00a0the\u00a0evaluation of\u00a0a\u00a0proposed design, technical\u00a0submission\u00a0and price to<\/span><span data-contrast=\"auto\">\u202f<\/span><span data-contrast=\"auto\">deliver<\/span><span data-contrast=\"auto\">\u202f<\/span><span data-contrast=\"auto\">the project.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The process started after the provincial government\u00a0deemed\u00a0the former\u00a0<\/span><a rel=\"noopener nofollow\" href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/government\/2024\/06\/province-closes-ontario-science-centre-immediately-citing-structural-issues\" target=\"_blank\"><span data-contrast=\"none\">Ontario Science Centre site at 770 Don Mills Rd. unsafe\u00a0<\/span><\/a><span data-contrast=\"auto\">for public use in a highly controversial decision in the summer of 2024.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">A\u00a0report from professional engineers found \u201cserious structural deficiencies\u201d with the roof of the building\u00a0and it was also reaching the end of its useful life, experts\u00a0stated.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">In December 2025, the Ontario government\u202f<\/span><a rel=\"noopener nofollow\" href=\"https:\/\/news.ontario.ca\/en\/release\/1006842\/ontario-science-centre-opening-interim-location-at-harbourfront-centre-by-summer-2026\" target=\"_blank\"><span data-contrast=\"none\">announced<\/span><\/a><span data-contrast=\"auto\">\u202fHarbourfront\u00a0Centre will serve as the interim home for the Ontario Science Centre until the new permanent facility is completed.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Ontario Science Partners will\u00a0now\u00a0begin mobilizing\u00a0onsite\u00a0and construction is expected to start in the coming weeks.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The science\u00a0centre\u00a0is slated for completion in\u00a02029.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The province says it \u201cwill be a cornerstone of the revitalized Ontario Place, providing new experiences for families, creating more than 1,000 jobs in the construction and tourism sectors, and boosting economic growth across Toronto and the region.\u201d<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Final designs for the new Ontario Place were<\/span><a rel=\"noopener nofollow\" href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/government\/2025\/06\/final-ontario-place-designs-unveiled-no-decision-on-temporary-science-centre-location\" target=\"_blank\"><span data-contrast=\"none\">\u00a0unveiled in June 2025\u00a0<\/span><\/a><span data-contrast=\"auto\">and\u00a0<\/span><span data-contrast=\"none\">feature more than\u00a050 acres\u00a0of free public trails, expanded green space, playgrounds, interactive fountains, new beaches, event spaces, a modernized marina and\u00a0<\/span><a rel=\"noopener nofollow\" href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/projects\/2025\/10\/torontos-waterfront-music-venue-renamed-rbc-amphitheatre-will-close-in-2027-for-renos\" target=\"_blank\"><span data-contrast=\"none\">the redesigned RBC Amphitheatre.<\/span><\/a><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The Ontario Place and science\u00a0centre\u00a0plans coincide with\u00a0a new waterpark and wellness facility\u00a0by\u00a0Therme\u00a0Canada\u00a0at Ontario Place\u2019s West Island. Renderings<\/span><a rel=\"nofollow noopener\" href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/projects\/2025\/07\/updated-design-for-ontario-place-west-island-unveiled-by-therme-canada\" target=\"_blank\"><span data-contrast=\"none\">\u00a0released in July 2025\u00a0<\/span><\/a><span data-contrast=\"auto\">show an elaborate, sprawling site with twisting and turning waterslides and other areas inspired by global spa traditions.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/projects\/2026\/02\/1-04b-contract-awarded-for-new-ontario-science-centre-as-final-design-unveiled\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] TORONTO \u2014 Infrastructure Ontario (IO) and\u00a0the\u00a0Ministry of Tourism, Culture and Gaming (MTCG) have awarded a contract of\u00a0$1.04 billion\u00a0to Ontario &#8230; <a title=\"$1.04B contract awarded for new Ontario Science Centre as final design unveiled\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/1-04b-contract-awarded-for-new-ontario-science-centre-as-final-design-unveiled\/\" aria-label=\"Read more about $1.04B contract awarded for new Ontario Science Centre as final design unveiled\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-34447","post","type-post","status-publish","format-standard","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34447","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34447"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34447\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34447"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34447"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34447"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}