{"id":34471,"date":"2026-02-28T03:03:10","date_gmt":"2026-02-28T11:03:10","guid":{"rendered":"https:\/\/essential.construction\/news\/orders-drop-deepens-two-speed-civils-market\/"},"modified":"2026-02-28T03:03:10","modified_gmt":"2026-02-28T11:03:10","slug":"orders-drop-deepens-two-speed-civils-market","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/orders-drop-deepens-two-speed-civils-market\/","title":{"rendered":"Orders drop deepens two-speed civils market"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>According to the latest work trends survey from the Civil Engineering Contractors Association a balance of 17% of firms reported higher workloads in Q4 than a year ago, reversing the dip seen in Q3.<\/p>\n<p>But order books barely shifted, with a balance of just 3% reporting growth \u2013 the lowest reading since 2020 Q3 and a warning that the forward pipeline remains fragile.<\/p>\n<p>Civils is splitting into a two-speed sector with larger contractors better insulated than smaller subcontractors.<\/p>\n<p>Firms employing more than 600 staff reported stronger workload and order balances than smaller civils firms, reflecting spots on major frameworks and energy programmes.<\/p>\n<p>Smaller civils firms tied to local roads and early-stage works face a tougher outlook, compounded by a wet start to 2026.<\/p>\n<p>Cost pressures remain intense, with 86% of firms reporting annual increases. Tender prices are still rising for both new work and repair and maintenance.<\/p>\n<p>The upturn in activity was driven by airports, electricity and gas, with energy-related work providing the strongest boost to both workloads and orders.<\/p>\n<p>Electricity recorded the healthiest order book growth, followed by airports and gas. Water and sewerage and harbours also saw modest gains.<\/p>\n<p><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-02-26-at-20.16.12.png\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-506089\" src=\"https:\/\/www.constructionenquirer.com\/wp-content\/uploads\/Screenshot-2026-02-26-at-20.16.12.png\" alt=\"-\" width=\"1570\" height=\"868\"><\/a><\/p>\n<p>Transport remains the drag. Rail workloads fell sharply while motorways, trunk roads and local roads continue to post declining order books, extending a run of contraction that now stretches back several quarters. Preliminary works has also been in decline for more than a year.<\/p>\n<p>CECA Policy Director Ben Goodwin said: \u201cCECA\u2019s latest survey shows a mixed picture\u2026 the clear weakness in order books is an indication that too much of the pipeline is struggling to be converted into committed work on the ground.\u201d<\/p>\n<p>Despite the fragile pipeline, 60% of firms expect workloads to rise over the next 12 months, signalling cautious optimism heading into 2026.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2026\/02\/27\/order-fall-deepens-two-speed-civils-market\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] According to the latest work trends survey from the Civil Engineering Contractors Association a balance of 17% of firms &#8230; <a title=\"Orders drop deepens two-speed civils market\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/orders-drop-deepens-two-speed-civils-market\/\" aria-label=\"Read more about Orders drop deepens two-speed civils market\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-34471","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34471"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34471\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}