{"id":34478,"date":"2026-02-28T15:09:51","date_gmt":"2026-02-28T23:09:51","guid":{"rendered":"https:\/\/essential.construction\/news\/state-of-construction-process-relies-on-planning-timing-precision\/"},"modified":"2026-02-28T15:09:51","modified_gmt":"2026-02-28T23:09:51","slug":"state-of-construction-process-relies-on-planning-timing-precision","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/state-of-construction-process-relies-on-planning-timing-precision\/","title":{"rendered":"State of Construction: Process Relies on Planning, Timing, Precision"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"\">\n<td class=\"layout-content\">\n<div class=\"content\" style=\"&#9;visibility: hidden;\" id=\"content\">\n<div class=\"article-top\">\n<div class=\"content-info\"><span class=\"article-category\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/features\" target=\"_blank\">FEATURES<\/a><\/span>\u00a0<span class=\"article-subcategory\"><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/!\/state-of-construction\" target=\"_blank\">STATE OF CONSTRUCTION<\/a><\/span><br \/><span id=\"article_info\">February 27, 2026 <span class=\"article-author\">by Rick Muller<\/span><\/span>\u00a0\u00a0<span class=\"content-views\"><img decoding=\"async\" class=\"content-views-icon\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/views.png?14728329492\" alt=\"-\">\u00a0836\u00a0<\/span><\/div>\n<p><span id=\"article_title\">State of Construction: Process Relies on Planning, Timing, Precision<\/span><\/p>\n<\/div>\n<div class=\"article-content\" id=\"article_content\">\n<div class=\"article-body\" id=\"article_body\">\n<p roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\" data-start=\"114\" data-end=\"476\"><em>Throughout February UrbanToronto is featuring a special\u00a0<\/em><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/state-of-construction\/\" target=\"_blank\"><em>State of Construction<\/em><\/a><em>\u00a0editorial series to explore all the critical issues of construction across our region.<\/em><\/p>\n<p style=\"text-align: center;\" roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\" data-start=\"114\" data-end=\"476\">\u00a0* * *<\/p>\n<p class=\"p1\">Architect <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/gehry-partners.7991\" target=\"_blank\">Frank Gehry<\/a>\u2019s <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/forma.6448\" target=\"_blank\">Forma<\/a> is one of the most highly anticipated buildings to be built in Toronto in decades. The 73-storey East Tower is currently rising in the heart of the Entertainment District on King Street West, and not only is it perhaps the most visually arresting high-rise condominium ever built in the city, but it represents the maestro\u2019s legacy to his hometown as his final Canadian project, since we sadly lost the legend last December. With its crinkled aluminum cladding beginning to give us a peek of what is yet to come, it is destined to be a statement building on the Toronto skyline.<\/p>\n<p class=\"p1\">Forma is also perfectly representative of the many steps required in the construction process. Construction of any large-scale commercial or condominium project in Toronto is one of the most intricate and disciplined endeavours of today\u2019s modern world. It is a delicate, choreographed, jigsaw puzzle with a myriad of pieces all fitting together with exact timing and precision to achieve the end result.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194524.jpeg\" data-entity-uuid=\"insert-display_default-135e75b8-c2f9-4ce7-8924-ad2435b51597\" data-entity-type=\"file\" alt=\"Forma, Toronto, designed by Gehry Partners for Great Gulf, Dream Unlimited, and Westdale Properties\" title=\"Looking northwest to Forma's East Tower under construction, image by UrbanToronto Forum contributor khaldoon\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194524.jpeg', true, 'Looking northwest to Forma\\'s East Tower under construction, image by UrbanToronto Forum contributor khaldoon'); return false;\"><span class=\"image-description\">Looking northwest to Forma&#8217;s East Tower under construction, image by UrbanToronto Forum contributor khaldoon<\/span><\/p>\n<p class=\"p1\">Long before a project breaks ground, developers typically engage construction companies to participate in preconstruction services while working collaboratively with critical path subcontractors, in preparation for the work ahead. Steps in the construction process typically involve a preconstruction, construction, and post-construction proponent, with the construction phase of the job typically focusing on the critical path to substantial completion. Substructure, above-grade structural, envelope, and commissioning\/close-out are critical components of the construction phase of a project.<\/p>\n<p class=\"p1\">\u201cA robust preconstruction and planning phase involves a procurement strategy,\u201d says Andrew Anderson, Senior Vice President and Area Manager, Toronto for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/ellisdon.7927\" target=\"_blank\">EllisDon<\/a>, one of the country\u2019s largest construction companies, noting that procurement is an important benchmark and step in the entire process. \u201cProcurement of the critical work packages with trades whose scopes make up the critical path for the project will give the best confidence towards achieving budget and\/or schedule targets and goals. We rely on our experience and monitor various established metrics to ensure proper project flow and adherence towards achieving scheduled milestones.\u201d<\/p>\n<p class=\"p1\">Anderson says timing of the various steps of the construction process varies depending upon the project. \u201cWe find success in utilizing past experiences and data to support \u2018common\u2019 components,\u201d he says. \u201cWhile for other project-specific complexities and challenges, we leverage our depth of in-house research and development and construction science groups to support the project teams in finding the right solutions, technologies and tools to execute in the field.\u201d<\/p>\n<p class=\"p1\">EllisDon is the Construction Manager for Forma, which has provided the company with some unique challenges in building high on such a tight site.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194525.jpg\" data-entity-uuid=\"insert-display_default-52067b39-6190-4013-b628-467a40238d45\" data-entity-type=\"file\" alt=\"Forma, Toronto, designed by Gehry Partners for Great Gulf, Dream Unlimited, and Westdale Properties\" title=\"Construction crews applying the first cladding to Forma, image by UrbanToronto Forum contributor Southcore\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194525.jpg', true, 'Construction crews applying the first cladding to Forma, image by UrbanToronto Forum contributor Southcore'); return false;\"><span class=\"image-description\">Construction crews applying the first cladding to Forma, image by UrbanToronto Forum contributor Southcore<\/span><\/p>\n<p class=\"p1\">\u201cForma has a unique and complicated exterior cladding design, and considerable planning and efforts such as logistics and quality control measures have been invested into the planning and execution to ensure success,\u201d says Anderson. \u201cThe project uses an automatic climbing framework system (ACS) due to the building\u2019s height and also the benefits it provides from an efficiency and safety standpoint.\u201d<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194523.jpeg\" data-entity-uuid=\"insert-display_default-3ee0435b-50a1-4031-9fe4-780cac1c9f51\" data-entity-type=\"file\" alt=\"Forma, Toronto, designed by Gehry Partners for Great Gulf, Dream Unlimited, and Westdale Properties\" title=\"Construction crews hoisting a cladding assembly at Forma, image by UrbanToronto Forum contributor ehambobam\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194523.jpeg', true, 'Construction crews hoisting a cladding assembly at Forma, image by UrbanToronto Forum contributor ehambobam'); return false;\"><span class=\"image-description\">Construction crews hoisting a cladding assembly at Forma, image by UrbanToronto Forum contributor ehambobam<\/span><\/p>\n<p class=\"p1\">While planning and coordination are key elements of the steps in the construction process to address any possible eventuality, there is one variable no one can control, most notably Mother Nature. As Torontonians know only too well from this Winter of 2026, weather can have a significant impact on the construction process.<\/p>\n<p class=\"p1\">\u201cWind particularly affects taller buildings as cranes can only work safely when the wind is below a certain speed, as it becomes difficult, or unsafe, to work in very high winds,\u201d says Jim Ferris, Senior Manager, Estimating Services, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/pcl-construction.7938\" target=\"_blank\">PCL Constructors Canada Inc.<\/a>, another major player in the industry. \u201cSnow and rain can impact deliveries and manpower on a site, as well as making working conditions more difficult, impacting productivity, in the same way extreme heat or cold can affect workers\u2019 productivity. We know that we have some challenging weather here in Toronto, so we plan for it and include ways to minimize its potential impact on our projects.\u201d<\/p>\n<p class=\"p1\">A few blocks southeast of Forma stands <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/160-front-west.2111\" target=\"_blank\">160 Front Street West<\/a>, the landmark office tower at Front and Simcoe Street, where PCL was Construction Manager on the 46-storey, 236-metre high, 1.2 million square foot tower for two anchor tenants. Its exterior nighttime lighting package now draws every eyeball as a highlight on Toronto\u2019s skyline, and may spur more creativity from developers going forward.\u00a0<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194522.jpeg\" data-entity-uuid=\"insert-display_default-484c53cd-d60a-4e44-9a94-b5a04019430a\" data-entity-type=\"file\" alt=\"160 Front West, Toronto, designed by AS + GG Architecture, B+H Architects for Cadillac Fairview\" title=\"Construction crews working on the steel beams at the crown of 160 Front West, image by UrbanToronto Forum contributor mburrrrr\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194522.jpeg', true, 'Construction crews working on the steel beams at the crown of 160 Front West, image by UrbanToronto Forum contributor mburrrrr'); return false;\"><span class=\"image-description\">Construction crews working on the steel beams at the crown of 160 Front West, image by UrbanToronto Forum contributor mburrrrr<\/span><\/p>\n<p class=\"p1\">\u201cPCL\u2019s in-house building envelope experts optimized design and constructability of the curved cladding that wraps all four exterior walls that integrate the heritage masonry of the 70-year-old, six-story building previously located on the site,\u201d says Ferris. \u201cStructural steel was used in conjunction with a concrete core to help evenly distribute the weight throughout the building, maximizing floor space and allowing the tower to be built efficiently within the confines of a busy urban environment.\u201d<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194520.jpeg\" data-entity-uuid=\"insert-display_default-a663994a-ab62-4305-88b0-27d5a62b5903\" data-entity-type=\"file\" alt=\"160 Front West, Toronto, designed by AS+GG Architecture and B+H Architects for Cadillac Fairview\" title=\"Construction crew member on a scissor lift at the crown of 160 Front West, image by UrbanToronto Forum contributor Red Mars\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194520.jpeg', true, 'Construction crew member on a scissor lift at the crown of 160 Front West, image by UrbanToronto Forum contributor Red Mars'); return false;\"><span class=\"image-description\">Construction crew member on a scissor lift at the crown of 160 Front West, image by UrbanToronto Forum contributor Red Mars<\/span><\/p>\n<p class=\"p1\">The construction of the notable tower also included PCL\u2019s work on the Simcoe Street PATH Tunnel, connecting the building to Toronto\u2019s PATH network. All of this takes an extraordinary amount of planning as part of the steps in the construction process, and the companies who undertake these tasks are much more multi-disciplinary than the average person may realize. When you see construction hoarding erected on a site, there is much more going on behind the scenes, and for much longer, just to get to that stage.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194521.jpeg\" data-entity-uuid=\"insert-display_default-7c343469-e472-4816-a4fa-12648e9a20df\" data-entity-type=\"file\" alt=\"160 Front West, Toronto, designed by AS + GG Architecture, B+H Architects for Cadillac Fairview\" title=\"A high-angle nighttime view looking northeast to 160 Front West, with the heritage walls visible at the southeast corner, image by UrbanToronto Forum contributor skycandy\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194521.jpeg', true, 'A high-angle nighttime view looking northeast to 160 Front West, with the heritage walls visible at the southeast corner, image by UrbanToronto Forum contributor skycandy'); return false;\"><span class=\"image-description\">A high-angle nighttime view looking northeast to 160 Front West, with the heritage walls visible at the southeast corner, image by UrbanToronto Forum contributor skycandy<\/span><\/p>\n<p class=\"p1\">\u201cWhat\u2019s often overlooked by the outside observer is the complexity and sophistication of construction,\u201d says Ferris. \u201cWe probably have more in-house knowledge and expertise in design and engineering disciplines than people may realize, and spend a lot more time planning than most people would expect.\u201d<span class=\"Apple-tab-span\">\u00a0<\/span><\/p>\n<p style=\"text-align: center;\" dir=\"ltr\"><em>* * *<\/em><\/p>\n<p><em>UrbanToronto&#8217;s research and data service,\u00a0<\/em><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\"><em>UTPro<\/em><\/a><em>, provides comprehensive data on construction projects in the Greater Golden Horseshoe\u2014from proposal through to completion. Other services include\u00a0<\/em><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\"><em>Instant Reports<\/em><\/a><em>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<\/em><a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\"><em>New Development Insider<\/em><\/a><em>, that tracks projects from initial application.\u200b<\/em><\/p>\n<p style=\"text-align: center;\"><span roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\">* * *<\/span><\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194519.png\" data-entity-uuid=\"insert-display_default-dd70562d-e643-4021-9990-84720c6b1613\" data-entity-type=\"file\"><\/p>\n<p style=\"text-align: center;\" roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\">* * *<\/p>\n<p roboto=\"\" light=\"\" verdana=\"\" helvetica=\"\" arial=\"\" sans-serif=\"\">Thank you to the companies joining UrbanToronto to celebrate <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/state-of-construction\/\" target=\"_blank\">State of Construction Month<\/a>.<\/p>\n<p><imgx class=\"image-display_default\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2026\/02\/60436\/60436-194518.png\" data-entity-uuid=\"insert-display_default-750b9529-9b9f-4309-9f51-12242b6c327b\" data-entity-type=\"file\"><\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/adamson-associates-architects.7951\" target=\"_blank\">Adamson Associates Architects<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/aercoustics-engineering-ltd.44962\" target=\"_blank\">Aercoustics Engineering Ltd<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bh-architects.7960\" target=\"_blank\">B+H Architects<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/besi-building-envelope-systems-installations.57081\" target=\"_blank\">BESI &#8211; Building Envelope Systems Installations<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bousfields.7652\" target=\"_blank\">Bousfields<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/dream-unlimited.7880\" target=\"_blank\">Dream Unlimited<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/ellisdon.7927\" target=\"_blank\">EllisDon<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/great-gulf.7729\" target=\"_blank\">Great Gulf<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/groundwater-environmental-management-services-inc-gems.45990\" target=\"_blank\">Groundwater Environmental Management Services Inc. (GEMS)<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/isotherm-engineering-ltd.30836\" target=\"_blank\">Isotherm Engineering Ltd.<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/kramer-design-associates-limited.22923\" target=\"_blank\">Kramer Design Associates Limited<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/liveroof-ontario-inc.30747\" target=\"_blank\">LiveRoof Ontario Inc<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/lri-engineering-inc.43252\" target=\"_blank\">LRI Engineering Inc.<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/peter-mccann-architectural-models-inc.39635\" target=\"_blank\">Peter McCann Architectural Models Inc.<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/platinum-condo-deals.53331\" target=\"_blank\">Platinum Condo Deals<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rjc-engineers.14107\" target=\"_blank\">RJC Engineers<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/rwdi-climate-and-performance-engineering.43563\" target=\"_blank\">RWDI Climate and Performance Engineering<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/ulma-construction-systems-canada-inc.39643\" target=\"_blank\">ULMA Construction Systems Canada Inc.<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/walters-group.24940\" target=\"_blank\">Walters Group<\/a><\/td>\n<\/tr>\n<\/table>\n<p><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/imgx><\/div>\n<\/div>\n<div class=\"articles\" id=\"articles\">\n<p><\/p>\n<p>\t\t<img decoding=\"async\" class=\"article-load-icon\" style=\"display: none;\" id=\"article_load\" src=\"https:\/\/cdn.skyrisecities.com\/release\/img\/more-content.png?14728329492\" onclick=\"loadArticles();\" alt=\"-\"><\/p><\/div>\n<\/div>\n<\/td>\n<td class=\"trending-column\" style=\"display: none;\" id=\"trending_block\"\/>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');<\/p>\n<p>fbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2026\/02\/state-construction-process-relies-planning-timing-precision.60436\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] FEATURES\u00a0STATE OF CONSTRUCTIONFebruary 27, 2026 by Rick Muller\u00a0\u00a0\u00a0836\u00a0 State of Construction: Process Relies on Planning, Timing, Precision Throughout February &#8230; <a title=\"State of Construction: Process Relies on Planning, Timing, Precision\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/state-of-construction-process-relies-on-planning-timing-precision\/\" aria-label=\"Read more about State of Construction: Process Relies on Planning, Timing, Precision\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-34478","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=34478"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/34478\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=34478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=34478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=34478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}